Professional Documents
Culture Documents
Circular 88 ICM Extract As Annexure A
Circular 88 ICM Extract As Annexure A
Circular No. 88
1
Table of Contents
1. INTRODUCTION....................................................................................................................... 4
APPENDIX B- ACRONYMS............................................................................................................119
2
APPENDIX C- GLOSSARY.............................................................................................................. 121
3
1. Introduction
The following document reflects an extract of indicators from Addendum 2 to MFMA Circular
No. 88 issued on 17 December 2020. The purpose of the document is to make clear to the
39 intermediate city municipalities (see Appendix A for a complete list) the indicators that are
applicable to them for the pilot during the 2021/22 financial year. The issuing of Addendum 2
to MFMA Circular No. 88 marks a further step towards the introduction of a singular,
differentiated set of indicators for all of local government in line with broader planning,
budgeting and reporting reforms. Appendix D provides some background information on the
reporting reforms process and explains how the common set of indicators for local
government was developed.
The consultations that produced these indicators were undertaken in terms of the provisions
of Section 43 of the Municipal Systems Act (MSA) 32 of 2000 which provides for the
Minister, after consultation with MECs for local government and organised local government
representing local government nationally, to prescribe and regulate key performance
indicators to local government. The following indicators were developed through the course
of engagements with M&E stakeholders in Provincial Departments of Cooperative
Governance and consultations with representatives of intermediate city municipalities over
the course of 2019 and 2020. Letters were written to the Municipal Managers of all
municipalities, as well as national stakeholders, with an invitation to participate in
consultations as well as to submit comments on the draft indicators. All consultative
engagements and inputs proved formative in the eventual formulation and crafting of the
indicator set. All engagements and written submissions are considered part of the process of
intended reform of the Local Government: Municipal Planning and Performance
Management Regulations of 2001.
In order to incrementally introduce the reform, these indicators are considered as the basis
for a pilot in the 2021/22 municipal financial year. As the following extract from the circular
explains:
For this pilot process, the applicable indicators as included in the Annexures will
be monitored and reported on, on a quarterly and annual basis, to the DCoG and
the provincial departments of Cooperative Governance and Traditional Affairs
(COGTAs). No reporting in the MSA section 46 statutory annual performance
report (APR) will be required.
Municipalities will continue to plan and report on the KPIs adopted in the
indicators tables of the IDP and SDBIP in the section 46 APR as required for
2021/22.
This “parallel” pilot process will allow and encourage municipalities to plan,
implement and report on the MFMA Circular No. 88 indicators, without limiting
their statutory performance planning and reporting in fear of audit findings before
they have not adequately institutionalized the process. e.g. It will further avoid the
situation where municipalities replace or remove existing indicators on a function
(e.g. with regard to water) in the official IDP and SDBIP, and only include the
related MFMA Circular No. 88 indicators with no performance reporting on the
function in the statutory section 46 Annual Performance Report due to the pilot
process.”
4
5
How to use this document
The following sets out overview tables and summaries of Technical Indicator Descriptions
(TIDs) for the indicators applicable to intermediate city municipalities. They have been
organised in terms of the Back-2-Basics Pillars (e.g. Putting People First, Service Delivery,
Good Governance, Sound Financial Management and Building Capable Local Government
Institutions) and formalised in MFMA Circular No. 88.
All the indicators shaded in Grey in the Indicator overview tables are listed at Tier 3 and Tier
4 readiness, meaning that they are not yet ready as prescribed indicators given
methodological and data availability considerations. Tier 3 and Tier 4 indicators are not
included in the list of Summary TIDs for this reason. Only Summary TIDs for Tier 1, Tier 2
and Compliance indicators intended for application as part of the 2021/22 pilot have been
included in this document.
The appendices of the document include the list of intermediate city municipalities (ICMs), a
glossary, acronyms and an explanatory note for the indicators.
Subsequent to the issuing of this document the Department of Cooperative Governance will
be providing further guidance and support to provincial departments and municipalities
towards the introduction and application of MFMA Circular No. 88 as part of planning for the
2021/22 financial year.
6
2. Indicator overview tables for intermediate city municipalities
The following are overview tables of all indicators considered applicable to intermediate city municipalities. They include Tier 3 and Tier 4
indicators in Grey. The indicators do not occur in sequence and there may appear to be some gaps in the reference numbers of the indicators
because of their differential application. This is to be expected and is not a reflection of incomplete or missing indicators.
7
Service delivery
Energy & electricity
Outcome Outcome Indicators Output Indicators
EE1. Improved EE1.1. Percentage of households with access to electricity EE1.11 Number of dwellings provided with connections to
access to mains electricity supply by the municipality
electricity E1.12 Number of dwellings provided with connections to
mains electricity supply by Eskom within the municipal
area
EE1.13 Percentage of valid customer applications for new
electricity connections processed in terms of municipal
service standards
EE2. Improved EE2.1 Percentage of households with electricity EE2.11 FBE provision levels as a percentage of total
affordability of connections receiving Free Basic Electricity electricity provision (in terms of MWh)
electricity
EE2.2 Percentage of low-income households that spend NO OUTPUT INDICATOR PROPOSED
more than 10% of their monthly income on electricity
EE2.3 Average electricity subsidy per residential municipal NO OUTPUT INDICATOR PROPOSED
customer
EE3. Improved EE3.1 System Average Interruption Duration Index EE3.11 Percentage of unplanned outages that are
reliability of EE3.2 Customer Average Interruption Duration Index restored to supply within industry standard timeframes
electricity service EE3.3 System Average Interruption Frequency Index EE3.21 Percentage of planned maintenance performed
EE3.4 Customer Average Interruption Frequency Index
EE4. Improved EE4.1 Renewable energy capacity available within the EE4.11 Total renewable energy capacity available through
energy municipal jurisdiction as a percentage of Eskom supply IPPs
sustainability capacity to the municipality EE4.12 Installed capacity of approved embedded
generators on the municipal distribution network
EE4.13 Percentage of municipal buildings utilising
electricity from renewable electricity
EE4.2 Electricity usage per capita NO OUTPUT INDICATOR PROPOSED
EE4.3 Road transport fuel usage per capita NO OUTPUT INDICATOR PROPOSED
EE 4.4 Percentage total electricity losses NO OUTPUT INDICATOR PROPOSED
8
Environment & waste
Outcome Outcome Indicators Output Indicators
ENV1. Improved air ENV1.1 Annual number of days with GOOD air ENV1.11 Percentage of atmospheric emission licenses
quality quality (AELs) processed within guideline timeframes
ENV1.12 Percentage of AQ monitoring stations providing
adequate data over a reporting year
ENV1.13 Percentage of municipal AEL applications captured
on the National Atmospheric Emissions Inventory System
ENV 1.3 Percentage of households experiencing a NO OUTCOME INDICATOR PROPOSED
problem with noise pollution
ENV2. Minimised solid ENV2.1 Tonnes of municipal solid waste sent to NO OUTPUT INDICATOR PROPOSED
waste landfill per capita
ENV2.2 Tonnes of municipal solid waste diverted NO OUTPUT INDICATOR PROPOSED
from landfill per capita
ENV 2.3 Total collected municipal solid waste per NO OUTPUT INDICATOR PROPOSED
capita
ENV3. Increased ENV3.1 Percentage of households with basic ENV 3.11 Percentage of known informal settlements
access to refuse refuse removal services or better receiving basic refuse removal services
removal ENV 3.2 Percentage of scheduled waste collection NO OUTPUT INDICATOR PROPOSED
service users reporting non-collection
ENV4. Biodiversity is ENV4.1 Ecosystem/vegetation type threat status ENV4.11 Percentage of biodiversity priority area within the
conserved and municipality
enhanced ENV4.2 Ecosystem/vegetation type protection ENV4.21 Percentage of biodiversity priority areas protected
level
ENV4.3 Wetland condition index ENV4.31 Hectares of rehabilitated and maintained wetlands
within the municipal area
ENV5. Coastal and ENV5.1 Recreational water quality (coastal) ENV5.12 Number of coastal water samples taken for
inland water resources monitoring purposes
maintained
ENV5.2 Recreational water quality (inland) ENV5.21 Number of inland water samples taken for
monitoring purposes
9
Housing & community facilities
Outcome Outcome Indicators Output Indicators
HS1. Improved access HS1.1 Percentage of households living in HS1.11 Number of subsidised housing units constructed
to adequate housing) adequate housing using various Human Settlements Programmes
HS1.12 Number of serviced sites
HS1.13 Hectares of land acquired for human settlements in
Priority Housing Development Areas
HS1.2 Title deed backlog ratio HS1.21 Average number of days taken to register the title
deed
HS1.22 Number of title deeds registered to beneficiaries
HS1.3 Percentage of informal settlements HS1.31 Number of informal settlements assessed
upgraded to Phase 3 (enumerated and classified)
HS1.32 Number of informal settlements upgraded to Phase 2
HS2. Improved HS2.1 Percentage of property market HS2.11 Number of FLISP opportunities in the affordable gap
functionality of the transactions in the gap and affordable housing market
residential property market range
market HS2.2 Percentage of residential properties in HS2.21 Number of rateable residential properties in the
the subsidy market subsidy housing market entering the municipal valuation roll
HS2.22 Average number of days taken to process residential
building plan applications of 500 square meters or less
HS2.3 Percentage of households living in NO OUTPUT INDICATOR PROPOSED
formal dwellings who rent
HS3. Increased access HS3.1 Percentage of dwellings with access to HS3.11 Percentage of expenditure on the operations and
to and utilisation of public open spaces maintenance of neighbourhood parks and public outdoor
social and community spaces in poor and lower-middle income neighbourhoods
facilities HS3.4 Percentage utilisation rate of sports NO OUTPUT INDICATOR PROPOSED
fields
HS 3.5 Percentage utilisation rate of NO OUTPUT INDICATOR PROPOSED
community halls
HS 3.6 Average number of library visits per NO OUTPUT INDICATOR PROPOSED
library
HS 3.7 Percentage of municipal cemetery NO OUTPUT INDICATOR PROPOSED
plots available
10
Fire and disaster services
Outcome Outcome Indicators Output Indicators
FD1. Mitigated effects FD 1.1 Number of fire related deaths per 100 FD 1.11 Percentage compliance with the required
of fires and disasters 000 population attendance time for structural firefighting incidents
FE 1.2 Number of natural disaster related NO OUTPUT INDICATOR PROPOSED
deaths per 1000 population
LED2.3 Percentage of economic nodes in the LED2.31 Percentage of economic nodes within the municipality
municipality experiencing year on year growth with urban management arrangements in place
11
Outcome Outcome Indicators Output Indicators
LED 2.32 Percentage of economic nodes within the municipality
with transversal nodal development plans in place
LED3. Improved ease of LED3.1 Average cost to a business to apply for a LED3.11 Average time taken to finalise business license
doing business within the construction permit with a municipality applications
municipal area
LED3.12 Average time taken to finalise informal trading permits
LED3.13 Average number of days taken to process building
applications of 500 square meters or more
LED3.2 Average cost to transfer a property as a LED3.21 Percentage of revenue clearance certificates issued
percentage of total property value within 10 working days from time of completed application
received
LED3.3 R-value of investment inflows LED3.31 Average number of days from the point of advertising
to the letter of award per 80/20 procurement process
LED3.32 Percentage of municipal payments made to service
providers who submitted complete forms within 30-days of
invoice submission
LED3.4 Average change in the R-value of Commercial NO OUTPUT INDICATOR PROPOSED
Property within the municipality
12
Transport & roads
Outcome Outcome Indicators Output Indicators
TR2. Improved TR2.1 Percentage share of monthly income TR2.11 Cost per passenger kilometer of municipal public
affordability of public spent on public transport, for households using transport
transport public transport
TR 4. Improved TR4.1 Percentage of respondents indicating NO OUTPUT INDICATOR PROPOSED
satisfaction with that they believe public transport to be "safe"
public transport TR4.2 Percentage of respondents indicating TR4.21 Percentage of municipal bus services 'on time'
services that they believe public transport to be "reliable"
TR 5. Improved TR5.1 Percentage of households less than 10 TR5.11 Number of scheduled public transport access
access to public minutes walk from scheduled public transport points added
transport (incl. NMT)
TR5.2 Percentage of dwelling units within 500m NO OUTPUT INDICATOR PROPOSED
of scheduled public transport service
TR5.3 Percentage of persons with disability TR5.31 Percentage of scheduled municipal buses that are
where access to public transport is problematic low entry
TR5.4 NMT paths as a percentage of the total TR5.41 Length of NMT paths built
municipal road network length
TR 6. Improved TR6.1 Percentage of fatal crashes attributed to TR6.11 Percentage of unsurfaced road graded
quality of municipal road and environmental factors TR6.12 Percentage of surfaced municipal road lanes
road network which has been resurfaced and resealed
TR6.13 KMs of new municipal road lanes built
TR 6.2 Number of potholes reported per 10kms TR 6.21 Percentage of reported pothole complaints
of municipal road network resolved within standard municipal response time
TR 7. Improved road TR7.1 Road traffic fatalities per 100,000 NO OUTPUT INDICATOR PROPOSED
safety population
T7.2 Average number of fatalities per fatal
crash
13
Water & sanitation
Outcome Outcome Indicators Output Indicators
WS1. Improved access WS1.1 Percentage of households with access WS1.11 Number of new sewer connections meeting
to sanitation to basic sanitation minimum standards
WS2. Improved access WS2.1 Percentage of households with access WS2.11 Number of new water connections meeting
to water to basic water supply minimum standards
WS3. Improved quality WS3.1 Frequency of sewer blockages per 100 WS3.11 Percentage of callouts responded to within 24
of water and sanitation KMs of pipeline hours (sanitation/wastewater)
services
WS3.2 Frequency of water mains failures per WS3.21 Percentage of callouts responded to within 24
100 KMs of pipeline hours (water)
14
Sound financial management
MFMA Circular No. 71 has previously identified 32 indicators suitable for municipalities and municipal entities issued in terms of Section 216(1)
(c) of the Constitution and Section 2 of the MFMA. The circular gives guidance on financial norms and standards to ensure sound and
sustainable management of fiscal and financial affairs in municipalities and municipal entities. In order to ensure consistency and
complementarity between reform processes with the pre-existing directive, and with acknowledgement of the benefit of inter-departmental co-
ordination on this matter, the application of 32 financial management indicators in MFMA Circular No. 71 in secondary or intermediary cities
continues. However, National Treasury has indicated it will be revisiting these indicators in the near future in line with the broader reform
agenda.
Good governance
Outcome Outcome Indicators Output Indicators
GG3. Improved GG 3.1 Audit Outcome GG 3.11 Number of repeat audit findings
municipal
GG 3.12 Percentage of councillors who have declared
administration
their financial interests
GG 3.13 Percentage of administrative staff who have
declared their financial interests
GG4. Improved council GG 4.1 Percentage of councillors attending GG 4.11 Number of agenda items deferred to the next
functionality council meetings council meeting
GG 4.2 Functionality of the Municipal Public NO OUTPUT INDICATOR PROPOSED
Accounts Committee (MPAC)
GG5. Zero tolerance of GG 5.1 Number of alleged fraud and corruption GG 5.11 Number of active suspensions longer than three
fraud and corruption cases reported per 100 000 population months
GG 5.12 Quarterly salary bill of suspended officials
GG 5.2 Number of dismissals for fraud and NO OUTPUT INDICATOR PROPOSED
corruption per 100 000 population
15
16
Building capable local government institutions
Outcome Outcome Indicators Output Indicators
GG1. GG1.1 Percentage of municipal skills NO OUTPUT INDICATOR PROPOSED
Improved municipal development levy recovered
capability
GG1.2 Top management stability GG1.21 Staff vacancy rate
17
Compliance indicators
Ref. Indicator title
C1 (GG) Number of signed performance agreements by the MM and section 56
managers:
C2 (GG) Number of ExCo or Mayoral Executive meetings held:
C3 (GG) Number of Council portfolio committee meetings held:
C4 (GG) Number of MPAC meetings held:
C5 (GG) Number of recognised traditional leaders within your municipal boundary
C6 (GG) Number of formal (minuted) meetings between the Mayor, Speaker and MM
were held to deal with municipal matters:
C7 (GG) Number of formal (minuted) meetings - to which all senior managers were
invited- held:
C8 (GG) Number of councillors completed training:
C9 (GG) Number of municipal officials completed training:
C10 (GG) Number of work stoppages occurring:
C11 (GG) Number of litigation cases instituted by the municipality:
C12 (GG) Number of litigation cases instituted against the municipality:
C13 (GG) Number of forensic investigations instituted:
C14 (GG) Number of forensic investigations conducted:
C15 (GG) Number of days of sick leave taken by employees:
C16 (GG) Number of permanent employees employed
C17 (GG) Number of temporary employees employed:
C18 (GG) Number of approved demonstrations in the municipal area:
C19 (GG) Number of recognised traditional and Khoi-San leaders in attendance (sum
of) at all council meetings:
C20 (ENV) Number of permanent environmental health practitioners employed by the
municipality:
C21 (ENV) Number of approved environmental health practitioner posts in the
municipality
C22 (GG) Number of Council meetings held:
C23 (GG) Number of disciplinary cases for misconduct relating to fraud and
corruption:
C24 (GG) Number of council meetings disrupted
C25 (GG) Number of protests reported
C26 (GG) R-value of all tenders awarded
C27 (GG) Number of all awards made in terms of Section 36 of the MFMA Municipal
Supply Chain Management Regulations:
C28 (GG) R-value of all awards made in terms of Section 36 of the MFMA Municipal
Supply Chain Management Regulations:
C29 (LED) Number of approved applications for rezoning a property for commercial
purposes:
C30 (GG) Number of business licenses approved:
C31 (GG) Number of approved posts in the municipality with regard to municipal
infrastructure:
C32 (GG) Number of positions filled with regard to municipal infrastructure:
C33 (GG) Number of tenders over R200 000 awarded:
C34 (GG) Number of months the Municipal Managers' position has been filled (not
Acting):
C35 (GG) Number of months the Chief Financial Officers' position has been filled (not
18
Ref. Indicator title
Acting):
C36 (GG) Number of vacant posts of senior managers:
C37 (GG) Number of approved posts in the treasury and budget office:
C38 (GG) Number of filled posts in the treasury and budget office:
C39 (GG) Number of approved posts in the development and planning department:
C40 (GG) Number of filled posts in the development and planning department
C41 (GG) Number of approved engineer posts in the municipality:
C42 (GG) Number of registered engineers employed in approved posts
C43 (GG) Number of engineers employed in approved posts:
C44 (GG) Number of disciplinary cases in the municipality:
C45 (GG) Number of finalised disciplinary cases:
C46 (ENV) Number of approved waste management posts in the municipality:
C47 (ENV) Number of waste management posts filled:
C48 (EE) Number of approved electrician posts in the municipality:
C49 (EE) Number of electricians employed in approved posts:
C50 (WS) Number of approved water and wastewater management posts in the
municipality:
C51 (WS) Number of filled water and wastewater management posts:
C52 (HS) Number of maintained sports fields and facilities
C53 (HS) Square meters of maintained public outdoor recreation space
C54 (HS) Number of municipality-owned community halls
C56 (EE) Number of customers provided with an alternative energy supply (e.g. LPG
or paraffin or biogel according to supply level standards)
C57 (EE) Number of registered electricity consumers with a mini grid-based system in
the municipal service area
C58 (EE) Total non-technical electricity losses in MWh (estimate)
C59 (EE) Number of municipal buildings that consume renewable energy
C60(WS) Total number of sewer connections
C61 (WS) Total number of chemical toilets in operation
C62 (WS) Total number of Ventilation Improved Pit Toilets (VIPs)
C63 (WS) Total volume of water delivered by water trucks
C64 (TR) R-value of all direct municipal vehicle operational costs for public transport
C65 (TR) Total number of scheduled public transport access points
C66 (TR) Number of weekday passenger trips on scheduled municipal bus services
C67 (FD) Number of paid full-time firefighters employed by the municipality
C68 (FD) Number of part-time and firefighter reservists in the service of the
municipality
C69 (FD) Number of 'displaced persons' to whom the municipality delivered
assistance
C71 (LED) Number of procurement processes where disputes were raised
C73 (FD) Number of structural fires occurring in informal settlements
C74 (FD) Number of dwellings in informal settlements affected by structural fires
(estimate)
C76 (LED) Number of SMMEs and informal businesses benefitting from municipal
digitisation support programmes rolled out directly or in partnership with
other stakeholders
C77 (LED) B-BBEE Procurement Spend on Empowering Suppliers that are at least
19
Ref. Indicator title
51% black owned based
C78 (LED) B-BBEE Procurement Spend on Empowering Suppliers that are at least
30% black women owned
C79 (LED) B-BBEE Procurement Spend from all Empowering Suppliers based on the
B-BBEE Procurement
C80 (LED) Date of the last Council adopted Development Charges policy
C81 (LED) Number of new business license applications
C82 (LED) Value of Commercial Projects Constructed by adding all of the estimated
costs of construction values on building permits
C83 (LED) Number of building plans approved after first review
C84(LED) Number of building plans submitted for review
C85(LED) Number of business licenses renewed
C86 (LED) Number of households in the municipal area registered as indigent
C89 (GG) Number of meetings of the Executive or Mayoral Committee postponed due
to lack of quorum
20
Compliance questions
No Compliance questions
Q1. Does the municipality have an approved Performance Management Framework?
Q2. Has the IDP been adopted by Council by the target date?
Q3. Does the municipality have an approved LED Strategy?
What are the main causes of work stoppage in the past quarter by type of
Q4.
stoppage?
How many public meetings were held in the last quarter at which the Mayor or
Q5.
members of the Mayoral/Executive committee provided a report back to the public?
When was the last scientifically representative community feedback survey
Q6.
undertaken in the municipality?
What are the biggest causes of complaints or dissatisfaction from the community
Q7.
feedback survey? Indicate the top four issues in order of priority.
Please list the locality, date and cause of each incident of protest within the
Q8.
municipal area during the reporting period:
Q9. Does the municipality have an Internal Audit Unit?
Q10
. Is there a dedicated position responsible for internal audits?
Q11
. Is the internal audit position filled or vacant?
Q12
. Has an Audit Committee been established? If so, is it functional?
Q13
. Has the internal audit plan been approved by the Audit Committee?
Q14 Has an Internal Audit Charter and Audit Committee charter been approved and
. adopted?
Q15
. Does the internal audit plan set monthly targets?
Q16
. How many monthly targets in the internal audit plan were not achieved?
Q17 Does the Municipality have a dedicated SMME support unit or facility in place
. either directly or in partnership with a relevant role-player?
Q18 What economic incentive policies adopted by Council does the municipality have
. by date of adoption?
Q19
. Is the municipal supplier database aligned with the Central Supplier Database?
Q20 What is the number of steps a business must comply with when applying for a
. construction permit before final document is received?
Please list the name of the structure and date of every meeting of an official IGR
Q22
structure that the municipality participated in this quarter:
Q23 Where is the organisational responsibility for the IGR support function located
. within the municipality (inclusive of the reporting line)?
Q24
. Is the MPAC functional? List the reasons why if the answer is not 'Yes'.
Q25 Has a report by the Executive Committee on all decisions it has taken been
. submitted to Council this financial year?
21
3. Summary Technical Indicator Descriptions (TIDs)
The following is a set of summary Technical Indicator Descriptions for each of the
indicators applicable to Intermediate City Municipalities.
Summary TIDs are provided for Tier 1, Tier 2 and Compliance Indicators so as to only
provide the essential descriptive indicator information for the 2021/22 financial year.
Please refer to Appendix B of Circular No. 88 for full TIDs and details for Tier 3 and Tier
4 indicators. Municipalities are not expected to plan and report against Tier 3 and Tier 4
indicators for the 2021/22 financial year.
22
Indicator Ref. & Title GG 2.11 Percentage of ward committees with 6 or
more ward committee members (excluding the ward
councillor)
23
Indicator Ref. & Title GG 2.12 Percentage of wards that have held at
least one councillor-convened community meeting
Rationale The indicator provides an indication of the extent of
public participation opportunities in the municipality
at ward level in terms of municipal engagement.
Each ward councillor should convene at least one
quarterly meeting in his/her ward as per the
Municipal Systems Act and Councillor Code of
Conduct. This indicator measures the extent to
which this occurs across all municipal wards in the
municipality each quarter.
Definition The number of wards where ward councillors
convened at least one community meeting in the
quarter as per statutory requirements, as a
percentage of all the wards in the municipality.
Community meetings refer to any public meeting for
which public notice is given, held in the councillor's
ward, and at which the ward councillor convenes
the meeting.
Indicator formula (1) Total number of councillor convened ward
community meetings / (2) Number of wards in the
municipality
Indicator origin According to the Councillor Code of Conduct in the
Municipal Systems Act, 32 of 2000, ward
councillors are expected to interact through report
back meetings with the community. The legislation
states that “councillors must be accountable to local
communities and report back at least quarterly to
constituencies on council matters, including the
performance of the municipality in terms of
established indicators”. CoGTA Back to Basics.
The indicator relates to MTSF Priority 1: Building a
capable, ethical and development state. It is aligned
to the Outcome- Functional, efficient and integrated
government.
Frequency of reporting Quarterly
Notes on the calculation Cumulative indicator, i.e. the figure reported in a
given quarter should be the average per ward, from
the first day of the financial year to the last day of
the quarter being reported on. (For instance, in Q3,
the figure reported should be the average across
the first 3 quarters of the financial year. In Q4, the
figure reported should be the average across the
entire financial year and therefore equivalent to the
annual performance.)
Intermediate City readiness Tier 2
Reporting responsibility Municipality
24
Indicator Ref. & Title GG 2.2 Attendance rate of municipal council
meetings by recognised traditional and Khoi-San
leaders
Rationale Where traditional and Khoi-San leaders are
officially recognised in municipal council
proceedings in terms of section 81 of the Municipal
Structures Act of 1998, their attendance and
participation in council proceedings is an indication
of municipal stakeholder engagement and
involvement in civic affairs. Attendance of municipal
council proceedings provides one measure of their
interest and participation in the affairs of local
government.
Definition The rate of attendance of recognised traditional and
Khoi-San leaders at municipal council proceedings
within a municipality as a percentage of all
recognised traditional and Khoi-San leaders for
each council meeting. A traditional leader is any
person who, in terms of customary law of the
traditional community concerned, holds a traditional
leadership position, and is recognised in terms of
Traditional Leadership and Governance Framework
Act of 2003. A Khoi-San leader is a person
recognised as a senior Khoi-San leader or a branch
head in terms of section 10 and includes a regent,
acting Khoi-San leader and deputy Khoi-San
leader. "Recognised leaders" refer to those groups
which the municipal council officially recognises
within the municipal area.
Indicator formula ((1) Sum of the total number of recognised
traditional and Khoi-San leaders in attendance at
municipal council proceedings / ((2) The total
number of recognised traditional and Khoi-San
leaders within the municipality x (3) Total number of
Council meetings)) x 100
Indicator origin Proposed CoGTA departmental consultations
(Municipal Structures Act, Section 81(2)(b)
provides, “The number of traditional leaders that
may participate in the proceedings of a municipal
council may not exceed 20 per cent of the total
number of councillors in that council, but if the
council has fewer than 10 councillors, only one
traditional leader may so participate”. The indicator
is aligned to MTSF Priority 6: Social Cohesion and
Safer Communities in terms of the outcome-
Promoting active citizenry and leadership.
Frequency of reporting Annual
Notes on the calculation The total number of recognised traditional leaders
should be informed by the municipalities application
of relevant legislation within its context and refer to
a set of traditional leaders specific to its area.
Traditional leaders may be represented by proxies
25
where so designated.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
Indicator Ref. & Title GG2.3 Protest incidents per 10 000 population
Rationale Protest incidents can signal citizens' dissatisfaction
with services, and/or their disinterest or distrust in
formal channels for engaging the municipality.
Unauthorised protests can disrupt the functioning of
businesses and service delivery, and violent
protests involve risks to property and life. Many,
though not all, protest incidents over the last
decade have been associated with local service
delivery complaints. This indicator can therefore
contribute to an understanding of citizen satisfaction
or dissatisfaction with local government
responsiveness, including their satisfaction with the
channels available to participate constructively in
the affairs of local government. All unauthorised
protest incidents are captured within this indicator
regardless of whether directed explicitly at local
government or not because the exact institutional
channels and functional distinctions between the
three spheres of government are not always known
or apparent to protestors.
Definition The number of protest incidents without municipal
authorisation reported to have taken place on a
public road or public space within municipal
boundaries in the past financial year normalised per
the population. This indicator tracks all
unauthorised protests reported to occur within the
municipal area, not only those related to service
delivery. An unauthorised protest is a public display
of grievance or concern by a group of more than 15
people for which a written approval from the local
municipality has not been obtained in advance.
Reported incidents means every unique incident of
protest which the municipality has received a direct
or indirect report for, whether in-progress or after
the fact, regardless of whether the protest was
aimed at the municipality or not.
Indicator formula ((1) Simple count of all unauthorised protest
incidents reported / (2) Total population of the
municipality) x 10 000
Indicator origin B2B reporting framework; Ministerial input. The
indicator is aligned to MTSF Priority 6: Social
Cohesion and Safer Communities in terms of the
outcome- Promoting active citizenry and leadership.
Unauthorised protests speak to active citizenry and
leadership pursuing avenues outside of official state
channels.
Frequency of reporting Annual
26
Notes on the calculation There is a lower order compliance indicator which
measures the number of protests incidents
reported. The aggregate of this measure in the
fourth quarter of the financial year should be
equivalent to the numerator.
Intermediate City readiness Tier 2
Reporting responsibility Shared
28
Service delivery
Energy & electricity
Indicator Ref. & Title EE1.11 Number of dwellings provided with
connections to mains electricity supply by the
municipality
Rationale The municipality needs to ensure that all new
dwellings are provided with an electricity
connection. Additionally, they need to clear
backlogs of existing dwellings that do not have
electricity connections which fall under their
responsibility (as opposed to Eskom's). This
indicator which measures the city's progress in this
area will contribute to overall access to electricity
for the municipality.
Definition The number of new residential electricity
connections to dwellings provided by the
municipality
Indicator formula (1) Number of residential supply points
commissioned and energised by the municipality
Indicator origin The indicator relates to MTSF: Priority 5: Spatial
integration, Human settlements and local
government. It is aligned in terms of the Outcome-
Improved capacity to deliver basic services, quality
infrastructure and integrated public transport to
increase household access to basic services. B2B
framework.
Frequency of reporting Quarterly
Notes on the calculation Cumulative indicator, i.e. the reported figure in a
given quarter should be a year-to-date figure for the
financial year.
Intermediate City readiness Tier 1
Reporting responsibility Municipality
Indicator Ref. & Title EE3.11 Percentage of unplanned outages that are
restored to supply within industry standard
timeframes
Rationale Once an unplanned outage has occurred, the
municipality should strive to restore power to the
affected groups as soon as possible. Quick turn-
around implies greater reliability of the municipal
electricity service. This indicator is a distribution of
MTTR (Mean Time to Restore), which is the
average time it takes to restore supply once an
interruption takes place.
Definition The proportion of MTTRs that are within industry
standards where MTTR is the average time it takes
to restore unplanned outages. The following five
categories of restoration time are applied as
industry standards NSR 047: X=1.5, 3.5, 7.5, 24
and 168
29
Indicator formula ((1) Number of unplanned outages restored within x
hours / (2) Total number of unplanned outages) *
100, where x is based on industry standards (x=1.5,
3.5, 7.5, 24 and 168) and as per NRS 047.
Indicator origin IEEE Electric Power Distribution Reliability Indices:
MTTR. The indicator relates to MTSF: Priority 5:
Spatial integration, Human settlements and local
government. It is aligned in terms of the Outcome-
Improved capacity to deliver basic services, quality
infrastructure and integrated public transport to
increase household access to basic services.
Specifically, the indicator that measures
Implementation of Municipal Electricity Asset
Management framework.
Frequency of reporting Quarterly
Notes on the calculation Cumulative indicator, i.e. the reported figure in a
given quarter should be a year-to-date figure for the
financial year.
Intermediate City readiness Tier 1
Reporting responsibility Municipality
32
Environment & waste
Indicator Ref. & Title ENV1.12 Percentage of AQ monitoring stations
providing adequate data over a reporting year
36
Housing & community facilities
Indicator Ref. & Title HS1.12 Number of serviced sites
Rationale A basic level service for the core services of water,
electricity and sanitation is a prerequisite for
'adequate housing'. This indicator tracks the
number of sites to which the municipality has
provided a minimum service level for the three
basic services in terms of infrastructure provision
(e.g. water, sanitation and electricity). Waste
removal is a recurring service that is not based on
infrastructure provision to a site and is therefore
excluded.
Definition A site refers to a pre-determined area where basic
services can be provided, there is some degree of
security of tenure and to which a household can be
situated or relocated and/or upgraded. This refers
to the number of all sites serviced with a new
connection(s) achieving all three services of
electricity, water and sanitation to a basic level
within the municipality in the financial year. These
sites do not include the construction of top
structures. A basic level of service is defined as an
individual service to each site (not shared) meeting
the national minimum standard (the Regulations in
terms of the Water Services Act in the case of water
and sanitation and the Policy Guidelines for the
Integrated National Electrification Programme
(INEP) 2016/17 in the case of electricity), or the
minimum standards defined by the municipality,
whichever is higher. The indicator only measures
from the point when all three basic services have
been connected, regardless of the timeframes
between when water & sanitation connections and
electricity connections were made. This refers to
direct connections only and does not provide for
indirect connections.
Indicator formula (1) Number of all sites serviced receiving all three of
the basic services.
Indicator origin The indicator originates with MTSF: Priority 5:
Spatial integration, Human settlements and local
government. It is aligned in terms of the Outcome-
Adequate housing and improved quality living
environments. There was also an Urban
Settlements Development Grant indicator- Number
of sites currently serviced with electricity, water
(house connection) sewerage removal service and
solid waste removal service (622) which
corresponds to this indicator, less the solid waste
removal service.
Frequency of reporting Annual
Notes on the calculation The indicator measures those newly serviced sites
and does not measure all existing serviced sites
within the municipal area. Sites lacking any one of
37
the three services, or below the minimum standard
for that service should be excluded from the count.
Communal servicing should not be counted within
this indicator as it refers to direct connections.
Indicator Ref. & Title HS2.22 Average number of days taken to process
residential building plan applications of 500 square
meters or less
Rationale This is an efficiency measure of the average
processing time of the residential building plan
applications submitted to the municipality. Delays in
the processing of building plan applications affect
the time taken to build new housing within the
municipal area and may become a deterrent to
property development. Removing unnecessary
delays or uncertainties related to the efficiency of
building plan application processes supports a
functional property market within the municipality.
This indicator is also a useful efficiency measure as
it relates to the municipality's ability to create an
39
enabling environment for businesses.
Definition The indicator measures the number of days a
residential building plan application to the
municipality takes to be processed, from the date of
submission of all required information to the date of
communication of the initial adjudication results of
that application, on average, per application. A
'residential building plan' refers to building plans of
500 square meters or less, as this is a commonly
applied distinction for residential properties.
Measures of the time taken to process appeals of
the initial decision are not included within the
measurement.
Indicator formula (1) Sum of the number of days between the date of
submission of a complete building plan application
to the municipality and the communication of the
adjudication result of the application, for all
applications of 500 square meters or less /(2)
Number of residential building plan applications
adjudicated
Indicator origin The indicator originates with MTSF: Priority 5:
Spatial integration, Human settlements and local
government. It is aligned in terms of the Outcome-
Adequate housing and improved quality living
environments. It originates with municipalities
already tacking this measure and has implications
for creating an enabling evironment for home-
owners and businesses to operate.
Frequency of reporting Quarterly
Notes on the calculation Cumulative over the financial year. Calculations
should be made and tracked on aggregate, on a
quarter-by-quarter basis. The quarterly calculation
should be cumulative so that 2nd quarter measures
the cumulative average for half of the financial year
and the 4th quarter calculation is a measure of the
average processing time for the entire municipal
financial year. If a residential building plan
application has not been adjudicated at the time of
reporting it should be excluded from the total
number of building plan applications. The
numerator and denominator should cover the same
period and the same type of applications.
Indicator Ref. & Title HS 3.6 Average number of library visits per library
Rationale Utilisation rate is indicative of the supply and
demand for community facilities such as libraries. It
can be used to inform planning and performance of
facilities. The number of visits is a direct measure of
utilisation, whether to access books or to use the
space for one of its other community functions.
Definition The average number of library visits per library per
year. This measures only municipality managed
libraries.
Indicator formula (1) Total number of library visits / (2) Count of
municipal libraries
Indicator origin The indicator originates with MTSF: Priority 5:
Spatial integration, Human settlements and local
government. It is aligned in terms of the Outcome-
Adequate housing and improved quality living
environments.
Frequency of reporting Annual
Notes on the calculation None
Intermediate City readiness Tier 1
Reporting responsibility Municipality
41
Demographic shifts, land pressures and mortality rates
have resulted in some municipalities running out of land
available to bury the deceased. Tracking the percentage
of available plots within active cemeteries is one means
of determining whether the municipality is managing
the land it has available for cemeteries and planning for
this important public facility.
Definition The number of burial plots currently available within
active, municipal-owned cemeteries as a percentage of
the total amount of burial plots in all municipal-owned
cemeteries. Municipalities may have different policies
and approaches providing for available plots, including
where 'stacking' or other provisions for burial are made.
Based on the municipalities current policy provisions
and used plots, the indicator measures what percentage
of the total available cemetery capacity in active
cemeteries is currently utilised.
Indicator formula (1) Number of available municipal burial plots in active
municipal cemeteries / (2) Total capacity of all burial
plots in active municipal cemeteries x 100
Indicator origin The indicator originates with holistic considerations of
human settlements and is informed by Schedule 5B of
the Constitution which provides for local government
responsibilities for cemeteries. It addresses MTSF:
Priority 5: Spatial integration, Human settlements and
local government. It is aligned in terms of the Outcome-
Adequate housing and improved quality living
environments.
Frequency of reporting Annual
Notes on the calculation Cemeteries that are not active or available for
burying for any reason should be excluded from the
denominator.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
44
Indicator Ref. & Title LED1.21 Number of work opportunities created
through Public Employment Programmes (incl.
EPWP, CWP and other related employment
programmes)
Rationale Work opportunities created through state funded
infrastructure programmes are an important means
of poverty alleviation delivered by municipalities and
state actors. The indicator tracks the contribution of
Public Employment Programmes to work
opportunities as a means of growing inclusive local
economies.
Definition Simple count of the number of short-term work
opportunities provided through the municipality by
Public Employment Programmes such as
Expanded Public Works Programme, Community
Works Programme and other related infrastructure
initiatives. EPWP is a nationwide programme
covering all spheres of government and SOEs.
EPWP projects employ workers on a temporary or
ongoing basis with government, contractors, or
other non-governmental organisations under the
Ministerial Conditions of Employment for the EPWP
or learnership employment conditions. The CWP
was established to provide an employment safety
net to eligible members of target communities by
offering them a minimum number of regular days of
work each month. The programme targets
unemployed and underemployed people. The
stipends participants receive supplement their
existing livelihood means and provide them with a
basic level of income security. The indicator tracks
the number of unique work opportunities generated
within the quarter, regardless of the duration.
Indicator formula (1) Number of work opportunities provided by the
municipality through the Expanded Public Works
Programme + (2) the Number of work opportunities
provided through the Community Works
Programme and other related infrastructure
initiatives.
Indicator origin CoGTA Back 2 Basics. The indicator relates to
MTSF Priority 2: Economic Transformation and Job
Creation. It aligns in terms of the Outcome- More
decent jobs created and sustained with youth,
women and persons with disabilities prioritised. It
contributes directly to the indicator "Number of work
opportunities reported through other public
employment programmes". Formerly indicator
GG6.12 in the previous iterations of Circular No. 88.
Frequency of reporting Quarterly
Indicator Ref. & Title LED3.11 Average time taken to finalise business
license applications
Notes on the calculation Cumulative for the year to date. Only refers to
business license applications for which a decision
has been taken. License applications in process are
excluded from the denominator of the calculation.
Indicator Ref. & Title LED3.31 Average number of days from the point of
advertising to the letter of award per 80/20
procurement process
Rationale Procurement is a key supply chain management
process for municipalities to secure external
services and for the businesses that bid for work.
The time taken for a public procurement process is
an important measure of the municipality's own
ability to efficiently administrate its own
procurement and the associated economic activity
which follows.
Definition The average number of days from the point of
advertising to the letter of award per 80/20
47
procurement process. An 80/20 procurement
process refers to public procurement as per the
terms of the Preferential Procurement Regulations
in terms of the Preferential Procurement Policy
Framework Act for bids where an 80/20 Broad-
Based Black Economic Empowerment (B-BBEE)
thresholds of between R30 000 and R50 million
applies. This would apply to tenders awarded within
the financial year, and where disputes to the
outcome of the tender process were not raised.
This does not apply to requests for quotations.
Indicator formula (1) Sum of the number of days from the point of
advertising a tender in terms of the 80/20
procurement process to the issuing of the letter of
award/ (2) Total number of 80/20 tenders awarded
as per the procurement process
Indicator origin The indicator relates to MTSF Priority 2: Economic
Transformation and Job Creation. It aligns in terms
of the Outcome- Reduced concentration and
monopolies and expanded small business sector
Frequency of reporting Quarterly
Notes on the calculation Cumulative for the year to date. Only refers to 80/20
procurement processes for which letters of award
have been issued. Active procurement processes
are not included. It does not include procurement
processes where disputes have been lodged or
where quotations have been obtained instead of an
open procurement process.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
49
Transport & roads
Indicator Ref. & Title TR4.21 Percentage of municipal bus services 'on
time'
Rationale An 'on-time' scheduled municipal bus service
indicates the timeousness and reliability of the bus
service, and directly impacts on the productivity of
the commuter. Measuring the bus services that are
on-time gives an indication of the extent to which
bus service schedules are reliable indications of
timing and a leading indicator for satisfaction.
Definition The percentage of all scheduled municipal bus
service departures 'on-time'. ‘Scheduled’ refers to
the time at which the bus is expected to depart.‘On-
time’ is understood to be within a window of 2-
minutes ahead of the scheduled departure time,
and up to 5 minutes after the scheduled departure
time. In the event that a municipality does not track
‘departures’, but does track ‘arrivals’ at the end
destination, arrivals may be substituted uniformly
across the TID but this should be specified in the
Standard Operating Procedure for the indicator.
Indicator formula ((1) Scheduled municipal bus departures 'on time' /
(2) Total scheduled municipal bus departures) x
100
Indicator origin This relates to MTSF Priority 2: Economic
transformation and job creation and advances the
Outcome- Increase access to affordable and
reliable transport systems. SDG 11.2 Provide
access to safe, affordable and sustainable public
transport for all, improving road safety, notably by
expanding public transport. SDG 11.2 Provide
access to safe, affordable and sustainable public
transport for all, improving road safety, notably by
expanding public transport
Frequency of reporting Quarterly
Notes on the calculation The indicator is cumulative for the year to date.
Quarter 4 reporting should be indicative of the
percentage of 'on-time' departures for the financial
year.
Indicator Ref. & Title TR6.13 KMs of new municipal road lanes built
Rationale Municipal road networks are enhanced as they are
expanded and new connections are created, with
the potential of contributing to commuting
efficiencies. Measuring the creation of new
municipal road lanes is one measure of expanding
municipal service indicative of improvements to the
municipal road network.
Definition The distance of municipal road lanes (including
public transport only lanes) built in kilometres within
the municipal area, by the municipality (inclusive of
all its departments and implementing agents). This
is inclusive of both surfaced and unsurfaced roads
built by the municipality. A surfaced road refers to
road installed with a durable surface material
intended to sustain traffic, usually pavement or
concrete. A lane is part of a carriageway that is
designated to be used by a single line of vehicles to
control and guide drivers and reduce traffic
conflicts. Lane widths may vary in width from 3.1m
at their narrowest, to 5.5m lanes in higher-order
mixed-usage streets. Total municipal road length is
53
measured on a per lane basis, so a road that is
four-lanes wide for 1 km has a total network length
of 4kms for the purpose of this indicator.
Indicator formula (1) Number of kilometres of surfaced road lanes
built + (2) Number of kilometres unsurfaced road
lanes built
Indicator origin This relates to MTSF Priority 2: Economic
transformation and job creation and advances the
Outcome- Increase access to affordable and
reliable transport systems. It is similar to the
indicator "KM of roads upgraded, refurbished and
maintained". SDG 11.2 Provide access to safe,
affordable and sustainable public transport for all,
improving road safety, notably by expanding public
transport
Frequency of reporting Quarterly
Notes on the calculation Cumulative, year to date. The new municipal road
built is measured as at the end of the reporting
period.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
Indicator Ref. & Title TR 6.2 Number of potholes reported per 10kms of
municipal road network
Rationale Potholes are a common way of reporting and
measuring defects in road infrastructure. Across
sectors, the incidence of defects in infrastructure
normalised in relation to the scale of the network is
a useful measure of the state of infrastructure and
proxy for the quality of user experience. Therefore,
the number of potholes per a section of road is an
indicator which measures road quality and
maintenance.
Definition The indicator measures the number of potholes
reported to the municipality normalised for the
length of the municipality's surfaced road network.
A municipal road network typically consists of
residential roads and roads in built-up areas within
its borders, that allow for the movement of goods,
services and people that are the responsibility of
the municipality to maintain. Potholes are defined
as a depression in a road surface, usually asphalt
pavement, where traffic has removed broken pieces
of the pavement. It is usually the result of water in
the underlying soil structure and traffic passing over
the affected area. This indicator does not count
multiple reports of the same pothole at the same
location. This indicator is worded such that potholes
are counted once and only once they have been
reported, signalling awareness of and
dissatisfaction with road quality by the public. Each
municipality may have different systems or
54
protocols to determine when it receives multiple
reports for the same pothole. The Standard
Operating Procedure by the municipality for the
indicator should be instructive in this regard.
Indicator formula (1) Number of potholes reported / ((2) Kilometres of
surfaced municipal road network/ 10)
Indicator origin This relates to MTSF Priority 2: Economic
transformation and job creation and advances the
Outcome- Increase access to affordable and
reliable transport systems. Ministerial inputs
Frequency of reporting Annual
Notes on the calculation Where there are multiple reports of the same
pothole, or a collection of potholes at the same
point of road, this should only be counted as one
pothole report.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
Indicator Ref. & Title WS2.11 Number of new water connections meeting
minimum standards
Rationale South Africa comes from a history of separate
56
development which has resulted in many rural
areas not having access to basic water supply. A
dedicated basic services development programme
was initiated in 1994 to eradicate the historic
backlogs. The target was for all people in South
Africa to have access to a functioning basic water
supply by 2014. This target was however not met
and a new target date of 2019 has been set, as per
the 2014 Medium Term Strategic Framework.
Definition Total number of new water connections meeting
minimum standards (supply of water is Piped (tap)
water inside dwelling/institution, Piped (tap) water
inside yard, and/or Community stand: <200 m) as
part of state-subsidised human settlements
development. This is inclusive of new water
connections to communal facilities that meet
minimum standards.
Indicator formula The (1) number of new water connections to piped
(tap) water + (2) number of new water connections
to public/communal taps
Indicator origin IWA aligned indicator
MBI indicator. The indicator relates to MTSF:
Priority 5: Spatial integration, Human settlements
and local government. It is aligned in terms of the
Outcome- Improved capacity to deliver basic
services, quality infrastructure and integrated public
transport to increase household access to basic
services.
Frequency of reporting Quarterly
Notes on the calculation Acceptable water meeting minimum standards
includes access to either of the following: (1) Piped
(tap) water inside dwelling/institution, (2) Piped (tap)
water inside yard, and/or (3) Community stand:
<200 m.
Cumulative indicator, i.e. the reported figure in a
given quarter should be a year-to-date figure for the
financial year.
Intermediate City readiness Tier 1
Reporting responsibility Municipality
Indicator Ref. & Title WS3.1 Frequency of sewer blockages per 100 KMs
of pipeline
Indicator Ref. & Title WS3.2 Frequency of water mains failures per 100
KMs of pipeline
Rationale Operations and maintenance typically includes the
day-to-day activities necessary for the water
services system infrastructure and equipment to
59
perform their intended function. To accomplish this,
the municipality must operate the systems and
equipment responsibly and maintain them properly.
Maintaining infrastructure in sound condition is a
key element of providing sustainable municipal
services. If a poor maintenance regime is followed,
an asset may not reach its design life and will have
to be replaced early. Since 1994 the focus of
Government has been on the provision of basic
water and sanitation infrastructure. The effective
operation and maintenance of this infrastructure is
an essential part of service delivery that has been
much neglected. An assessment of 1689 water
schemes found that at least 10% were
dysfunctional, while a further 20 to 24% were
experiencing serious water security problems, and
48% needed urgent refurbishment. Functionality
issues can mostly be ascribed to poor
management. In order to ensure long term effective
water services delivery, an asset management
approach must be followed.
Definition Number of water mains failures per 100km of mains
pipe per year. "Mains" refers to all transmission and
distribution pipes for water, the ownership of which
is vested in the municipality for the purpose of
conveying water to consumers.
Indicator formula (1) Number of water mains failures (including
failures of valves and fittings) / [(2)Total mains
length (water) in KMs/ 100]
Indicator origin IWA indicator
MBI indicator. The indicator relates to MTSF:
Priority 5: Spatial integration, Human settlements
and local government. It is aligned in terms of the
Outcome- Improved capacity to deliver basic
services, quality infrastructure and integrated public
transport to increase household access to basic
services. It relates to the indicator "Reliability of
water services".
Frequency of reporting Annual
60
Only consider pipelines under the control of or
managed by the municipality.
61
Indicator Ref. & Title WS3.21 Percentage of callouts responded to within
24 hours (water)
62
Indicator Ref. & Title WS3.3 Frequency of unplanned water service
interruptions
Rationale Service quality or customer satisfaction is
measured through customer surveys and the
monitoring of complaints/ protests, continuity of
supply, affordability and service level indicators.
Municipalities face significant challenges as they
strive to increase the quality and manage the costs
of services to their customers. Service delivery
protests have become a regular feature of South
African life. Poor services can therefore make it
difficult to attract business or industry to an area
and will limit job opportunities for residents. Protest
and unrest is bad for the local economy, leading to
perceptions of instability. Without income from
services, the municipality will either be running a
bankrupt business or be highly reliant on grants.
Resolving these challenges thus brings direct
economic benefits to a municipality.
Definition Number of interruptions averaged per 1000 service
connections per year. Interruptions are understood
as occurring at the source and do not include the
number of consumer units affected by an
interruption.
Indicator formula (1)Number of unplanned water service interruptions
/ [(2)Total number of water service
connections/1000]
Indicator origin IWA indicator
MBI indicator. The indicator relates to MTSF:
Priority 5: Spatial integration, Human settlements
and local government. It is aligned in terms of the
Outcome- Improved capacity to deliver basic
services, quality infrastructure and integrated public
transport to increase household access to basic
services. It relates to the indicator "Reliability of
water services".
Frequency of reporting Annual
Notes on the calculation This indicator may be applied when service
connections density > 20 / km of mains (urban
distribution systems). IWA QS15 should be used
when service connections density < 20 / km of
mains (rural distribution systems and bulk supply
systems).
The indicator does not specify the duration of
interruptions so any interruption longer than 12
hours is considered within the indicator.
The indicator does not include planned interruptions
for maintenance purposes.
63
64
Indicator Ref. & Title WS4.1 Percentage of drinking water samples
complying to SANS241
65
Indicator Ref. & Title WS4.2 Percentage of wastewater samples
compliant to water use license conditions
66
Indicator Ref. & Title WS5.1 Percentage of non-revenue water
Rationale The purpose of this measure is to determine the
percentage loss of potential revenue from water
service through kilolitres of water purchased but not
sold as a result of losses incurred through theft
(illegal connections), non- or incorrect metering or
wastage as a result of deteriorating water
infrastructure.
67
Indicator Ref. & Title WS5.2 Total water losses
Rationale Water consumption is currently too high and there
is poor water use efficiency, and little water
conservation and demand management
implementation. In particular, the increased
percentage of the population with access to water
services (as the current backlog is addressed), and
the expected improvement in the standard of living,
is likely to result in a greater per capita water
consumption. New water augmentation schemes
will also be costly and are likely to be detrimental to
the environment. Effective water conservation and
demand management brings about the required
change to current water use management
practices, and there are opportunities to increase
water use efficiency in all water use sectors.
Definition Total (apparent and real) losses, expressed in
terms of annual volume lost per service connection
per day.
Indicator formula ((1) System input volume- (2) Authorised
consumption volume) in m³ x 1000) / (365 x (3)
Number of service connections)]
Indicator origin ISO 37120 Indicator 21.7
MBI indicator
IWA indicator. The indicator relates to MTSF:
Priority 5: Spatial integration, Human settlements
and local government. It is aligned in terms of the
Outcome- Improved capacity to deliver basic
services, quality infrastructure and integrated public
transport to increase household access to basic
services.
Frequency of reporting Annual
Notes on the calculation Water losses can be calculated as the System Input
Volume (see data element 2) minus the Authorised
Consumption (see data element 3).
This indicator is adequate for urban distribution
systems. Used if service connections density is >
20 / km of mains. IWA Op24 shall be used if service
connections density is < 20 / km of mains (e.g. rural
distribution systems or bulk supply systems). IWA
PI is L/connection/year but converted to
L/connection/day as this is more commonly used in
practice.
Although IWA/MBI specify m³/connection/year,
DWS traditionally requires this performance
indicator in units of L/connection/day. Therefore, in
order to calculate this performance indicator, a unit
conversion is required from m³ to L. To do this, the
Water Losses in m³ is multiplied by a 1000 to
convert this to Water Losses in L.
Intermediate City readiness Tier 1
Reporting responsibility Municipality
68
Indicator Ref. & Title WS5.31 Percentage of total water connections
metered
Rationale Water consumption is currently too high and there
is poor water use efficiency, and little water
conservation and demand management
implementation. In particular, the increased
percentage of the population with access to water
services (as the current backlog is addressed), and
the expected improvement in the standard of living,
is likely to result in a greater per capita water
consumption. New water augmentation schemes
will also be costly and are likely to be detrimental to
the environment. Effective water conservation and
demand management brings about the required
change to current water use management
practices, and there are opportunities to increase
water use efficiency in all water use sectors.
Definition The number of metered water connections as a
percentage of the total number of connections in
the municipality.
Indicator formula (1) Number of water connections metered /
[(1)Number of connections metered + (2) Number
of connections unmetered] x 100
Indicator origin MBI Indicator. The indicator relates to MTSF:
Priority 5: Spatial integration, Human settlements
and local government. It is aligned in terms of the
Outcome- Improved capacity to deliver basic
services, quality infrastructure and integrated public
transport to increase household access to basic
services.
Frequency of reporting Annual
Notes on the calculation None
71
Good governance
Indicator Ref. & Title GG 3.1 Audit Outcome
Rationale The Audit Opinion of the Auditor-General gives an
indication of the credibility of the municipal
administration and provides assurance of financial
reporting and adherence to governance and
administrative legislation.
Definition The Audit Opinion is defined by the Auditor-
General. It is given across a qualitative, ordinal
scale including: Unqualified with no findings;
Unqualified with findings; Qualified with findings;
Adverse with findings; and Disclaimed with findings.
For those who have not completed the process
'Outstanding audits' are recorded.
Indicator formula (1) Audit opinion (as defined by the Office of the
Auditor-General across a qualitative scale)
Indicator origin Office of the Auditor-General. The indicator relates
to MTSF Priority 1: Building a capable, ethical and
development state. It is aligned to the Outcome-
Functional, efficient and integrated government. It is
considered within the indicator 'Percentage of
qualified audits in national, provincial, local
government and public entities'.
Frequency of reporting Annual
Notes on the calculation As at the end of the previous financial year.
Intermediate City readiness Tier 2
Reporting responsibility National
72
Indicator formula (1) Simple count of the number of "repeat" findings
itemised in the Auditor-General's report of each
municipality.
Indicator origin Office of the Auditor-General. The indicator relates
to MTSF Priority 1: Building a capable, ethical and
development state. It is aligned to the Outcome-
Functional, efficient and integrated government. It is
subordinate to the indicator 'Percentage of qualified
audits in national, provincial, local government and
public entities'.
Frequency of reporting Annual
Notes on the calculation As at the end of the previous financial year.
73
council meetings / ((2 )The total number of council
meetings x (3) The total number of council
members in the municipality)) x 100
Indicator origin In terms of the Municipal Structures Act, 117 of
1998, Section 18(2), “a municipal Council must
meet at least quarterly”.
Indicator Ref. & Title GG 4.11 Number of agenda items deferred to the
next council meeting
Rationale This indicator shows to what extent municipal
business is delayed due to the absence of
councillors from council meetings or the concluding
of the meeting without attending to all items, which
gives an indication of the extent to which councillors
are fulfilling their responsibilities as elected
representatives of the municipality. Functional
councils will process agenda items with resolutions
or decisions rather than defer or leave unfinished
business. Measuring the number of agenda items
that are deferred to the next meeting is a proxy for
dysfunction.
Definition The number of agenda items that have been
deferred to the next council meeting because the
council has failed to reach a quorum or withheld
decisions on those items. Where multiple council
meetings have been held, this is the sum total of
those items deferred. This does not refer to agenda
items referred to other structures, only items for
which no decision or action is taken.
Indicator formula (1) Sum total number of all council agenda items
deferred to the next meeting
Indicator origin CoGTA Back to Basics. The indicator relates to
MTSF Priority 1: Building a capable, ethical and
development state. It is aligned to the Outcome-
Functional, efficient and integrated government.
Frequency of reporting Quarterly
Notes on the calculation Cumulative indicator, i.e. the reported figure in a
74
given quarter should be the cumulative number of
agenda items deferred since the start of the
financial year. Therefore the Q4 figure will report on
the total number of agenda items deferred across
the entire financial year.
Intermediate City readiness Tier 1
Reporting responsibility Municipality
Indicator Ref. & Title GG 5.11 Number of active suspensions longer than
three months
Indicator Ref. & Title GG 5.12 Quarterly salary bill of suspended officials
Rationale Individuals on suspension continue to receive
salaries without executing their municipal functions.
Tracking the salary bill of suspended officials
provides an indicator of the extent to which
enduring suspensions are costing the municipality
money without the benefit of service.
Definition The sum of the salary bill for all officials suspended
75
from work or employment for the municipality for
misconduct during the reporting period.
Indicator formula (1) Sum of the salary bill for all suspended officials
for the reporting period.
Indicator origin Proposed based on CoGTA departmental
consultations. The indicator relates to MTSF Priority
1: Building a capable, ethical and development
state. It is aligned to the Outcome- Professional,
meritocratic and ethical public administration.
Frequency of reporting Quarterly
Notes on the calculation The indicator should be reported as a cumulative
value over months within a quarter (not cumulative
across quarters). The Q4 figure will therefore only
indicate the salary bill for Q4. Annually, all costs
should be aggregated across the entire financial
year to see the total cost.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
76
Building capable local government institutions
Indicator Ref. & Title GG1.1 Percentage of municipal skills development
levy recovered
77
Indicator Ref. & Title GG1.2 Top management stability
Rationale The stability of top management is central to the
ability of a municipality to perform well. This does
not mean there should not be exits, but that exits
should happen in a planned way, ideally ensuring
that there is a seamless handover to fully appointed
successors. Extended period of acting
arrangements are not desired and negatively
treated in this indicator.
Definition Top management is defined as Section 56 and 57
Managers, as per the Municipal Systems Act
(2000). This refers to the number of working days in
which all of the top management positions in the
municipality are filled by full-time employees not in
an acting position, as a percentage of the total
number of possible working days for those positions
in a calendar year.
Indicator formula ((1)Total sum of standard working days, in the
reporting period, that each S56 and S57 post was
occupied by a fully appointed official (not
suspended or vacant) with a valid signed contract
and performance agreement) / (2) Aggregate
working days for all S56 and S57 posts) x 100
Indicator origin The indicator relates to MTSF Priority 1: Building a
capable, ethical and development state. It is aligned
to the Outcome- Functional, efficient and integrated
government.
Frequency of reporting Annual
Notes on the calculation The indicator calculation only applies to top
management appointed in terms of Section 56 and
Section 57 of the Municipal Systems Act and
excludes staff below top management in the
municipality.
Intermediate City readiness Tier 2
Reporting responsibility Municipality
Indicator Ref. & Title GG1.22 Percentage of vacant posts filled within 3
months
80
Compliance indicators
Ref. & Title C1 Number of signed performance agreements by the
MM and section 56 managers:
81
Ref. & Title C3 Number of Council portfolio committee meetings
held:
This indicator ensures adherence to establishing
and maintaining functional portfolio committees as
Rationale per the MSA.
This is the count of the number of Council portfolio
committee meetings held. Portfolio committees
exercise oversight over a particular municipal
Definition department or “portfolio”.
(1) Simple count of the number of Council portfolio
Calculation committee meetings held
Frequency of reporting Quarterly
Source Committee minutes
Notes Cumulative, year to date.
82
Source Municipal records
Notes None
83
(1) Simple count of the number of councillors that
Calculation have received training
Frequency of reporting Quarterly
Source Municipal Human Resource Division
Notes Cumulative, year to date.
84
resolution of the matter.
(1) Simple count of litigation cases initiated by the
Calculation municipality
Frequency of reporting Quarterly
Source Municipal Legal department
Notes Cumulative, year to date.
85
forensic investigation is the gathering and analysis
of all evidence in order to come to a conclusion
about a suspect(s). In municipalities, the broad
areas of misconduct that are investigated include
irregular, wasteful and unauthorised expenditure;
procurement irregularities; appointment
irregularities; as well as cash theft, fraud, corruption
and malicious administrative practices. This refers
to investigations concluded.
(1) Simple count of the number of forensic
Calculation investigations instituted by the municipality
Frequency of reporting Quarterly
Source Municipal Legal department
Notes Cumulative, year to date.
86
87
Ref. & Title C17 Number of temporary employees employed:
The number of temporary employees employed at
the end of the quarter measures the scale of the
municipality's fixed-term staffing contingent at that
Rationale point in time.
The number of temporary employees employed by
the municipality. Temporary employees refer to
those employed on a fixed-term contract in addition
to the official organisational structure of the
Definition municipality.
(1) Simple count of the number of temporary
Calculation employees
Frequency of reporting Quarterly
Source Municipal Human Resource Management Systems
Notes Non-cumulative, as at the end of the quarter.
88
Ref. & Title C19 Number of recognised traditional and Khoi-San
leaders in attendance (sum of) at all council
meetings:
The indicator monitors the participation of traditional
leaders in council meetings within a municipality.
This is one indication of public participation among
Rationale a key group of cultural leaders.
The number of recognised traditional and Khoi-San
leaders in attendance (sum of) at all council
meetings. A traditional leader is any person who, in
terms of customary law of the traditional community
concerned, holds a traditional leadership position,
and is recognised in terms of Traditional Leadership
and Governance Framework Act of 2003. A Khoi-
San leader is a person recognised as a senior Khoi-
San leader or a branch head in terms of section 10
and includes a regent, acting Khoi-San leader and
deputy Khoi-San leader. "Recognised leaders" refer
to those groups which the municipal council
officially recognises within the municipal area. This
includes designated representatives of recognised
Definition leaders.
(1) Sum of the number of traditional leaders in
Calculation attendance at each council meeting held
Frequency of reporting Quarterly
Source Council meeting minutes
Cumulative of the year to date. The fourth quarter
data should be equivalent to the first data element
in GG2.2. Where designated representatives attend
this is subject to the Standard Operating Procedure
of the municipality for documenting and capturing
Notes this information.
90
related to fraud and corruption active within the
municipality. A disciplinary case is an alleged
instance of misconduct between an employee and
employer whereby the employee should present
evidence to respond to the allegations against
him/her. Fraud is an intentionally deceptive action
designed to provide the perpetrator with an unlawful
gain or to deny a right to a victim. Fraud typically
occurs with regard to finance. Corruption is a form
of dishonesty or criminal offense undertaken by a
person entrusted with a position of authority, to
acquire illicit benefit or abuse power for one's
private gain. Corruption may include many activities
including bribery and embezzlement. For this
definition, all forms of misconduct relating to
dishonesty may be considered within the ambit of
the measure.
(1) Simple count of the number of disciplinary cases
Calculation for misconduct related to fraud and corruption
Frequency of reporting Quarterly
Source Municipal Legal department
The measure is cumulative for the year to date for
the total number of cases that have been active in
Notes the financial year.
92
Ref. & Title C25 Number of protests reported
Protest incidents can signal citizens' dissatisfaction
with services, and/or their disinterest or distrust in
formal channels for engaging the municipality.
Unauthorised protests can disrupt the functioning of
businesses and service delivery, and violent
protests involve risks to property and life. Many,
though not all, protest incidents over the last
decade have been associated with local service
delivery complaints. This indicator can therefore
contribute to an understanding of citizen satisfaction
or dissatisfaction with local government
responsiveness, including their satisfaction with the
channels available to participate constructively in
the affairs of local government. All unauthorised
protest incidents are captured within this indicator
regardless of whether directed explicitly at local
government or not because the exact institutional
channels and functional distinctions between the
three spheres of government are not always known
Rationale or apparent to protestors.
A protest reported refers to an unauthorised protest
specifically, and excludes approved
demonstrations. An unauthorised protest is a public
display of grievance or concern by a group of more
than 15 people for which a written approval from the
local municipality has not been obtained in
advance. Reported incidents means every unique
incident of protest which the municipality has
received a direct or indirect report for, whether in-
progress or after the fact, regardless of whether the
Definition protest was aimed at the municipality or not.
(1) Simple count of all unauthorised protest
Calculation incidents reported
Frequency of reporting Quarterly
Source Municipal records/ Speaker's office
Cumulative for the year to date. The object of
protest should have no bearing on the capture and
reporting of the incident. Refer to the municipal
Notes Standard Operating Procedure.
Ref. & Title C27 Number of all awards made in terms of Section
36 of the MFMA Municipal Supply Chain
Management Regulations:
The indicator monitors the frequency with which the
municipality does not follow normal Supply Chain
Management processes in the awarding of tenders.
It is also a requirement that such awards are tabled
Rationale at Council meetings.
The number of tenders awarded in terms of Section
36 of the MFMA and the Municipal Supply Chain
Management Regulations. Section 36 of the MFMA
and the Municipal Supply Chain Management
Regulations of 2005 permits the Accounting Officer
to “dispense with the official procurement processes
established by the policy and to procure any
required goods or services through any convenient
process”. This would typically include urgent and
emergency cases, single–source goods, and any
other cases where it is impractical to follow normal
SCM process. In the event of such a decision, the
accounting officer is required to report this to the
Definition next Council meeting.
(1) Simple count of the number of tenders awarded
in terms of Section 36 of the MFMA Municipal
Calculation Supply Chain Management Regulations
Frequency of reporting Quarterly
Source Municipal Financial records
Notes Cumulative for the year to date.
Ref. & Title C28 R-value of all awards made in terms of Section
36 of the MFMA Municipal Supply Chain
Management Regulations:
The indicator monitors the R-value of all awards by
the municipality which does not follow normal
Supply Chain Management processes as an
Rationale indication of the scale of awards.
Definition The R-value of all tenders awarded in terms of
Section 36 of the MFMA and the Municipal Supply
Chain Management Regulations. Section 36 of the
MFMA and the Municipal Supply Chain
Management Regulations of 2005 permits the
Accounting Officer to “dispense with the official
procurement processes established by the policy
and to procure any required goods or services
through any convenient process”. This would
typically include urgent and emergency cases,
single–source goods, and any other cases where it
94
is impractical to follow normal SCM process. In the
event of such a decision, the accounting officer is
required to report this to the next Council meeting
(1) Sum of the R-value of all tenders awarded in
terms of Section 36 of the MFMA Municipal Supply
Calculation Chain Management Regulations
Frequency of reporting Quarterly
Source Municipal Financial records
Notes Cumulative for the year to date.
95
This indicator monitors the number of approved
posts related to municipal infrastructure within a
municipality as an indicator of municipal capability.
Such posts are critical to delivery of large-scale
Rationale capital projects and infrastructure development.
The number of approved posts in the municipality
with regard to municipal infrastructure. Municipal
infrastructure is defined in broad terms as ‘the
capital works required to provide municipal
services'. It includes all the activities necessary to
ensure that the works are delivered effectively, such
as feasibility studies, project planning and capacity
building to establish sound operational
Definition arrangements for the works.
(1) Simple count of the number of approved posts in
the municipality with regard to municipal
Calculation infrastructure
Frequency of reporting Annual
Source Municipal Human Resource Management Systems
This indicator can be used with the following
indicator to calculate the vacancy rate for municipal
Notes infrastructure related posts within the municipality.
96
Ref. & Title C33 Number of tenders over R200 000 awarded:
This indicator monitors the frequency with which a
municipality awards tenders above the value of
R200 000. It is indicative of the frequency of
Rationale tenders of a value above R200 000 are awarded.
The number of tenders over R200 000 awarded. A
tender is an invitation to bid for a project. A tender
is 'awarded' when the municipality officially selects
an individual/company to carry out the work
Definition required to complete a project.
(1) Simple count of the number of tenders over
Calculation R200 000 awarded
Frequency of reporting Quarterly
Source Municipal Financial Records
Notes Cumulative for the year to date.
Ref. & Title C35 Number of months the Chief Financial Officers'
position has been filled (not Acting):
This indicator measures the continuous duration of
time the municipality's Chief Financial Officer post
has been filled. Continuity in senior posts is
indicative or institutional stability and functional
Rationale municipal administrations.
The number of continuous months the Chief
Financial Officers' post has been filled (not Acting).
A Chief Financial Officer has the primary
responsibility for managing the municipality's
finances, including financial planning, management
of financial risks, record-keeping, and financial
Definition reporting.
Calculation (1) Simple count of the number of months the Chief
Financial Officer's position has been filled (not
97
Acting)
Frequency of reporting Quarterly
Source Municipal Human Resource Management Systems
Notes Non-cumulative, as at the time of reporting.
Ref. & Title C36 Number of vacant posts of senior managers:
This indicator measures the extent of vacancies in
terms of the municipality's senior management
Rationale posts.
The number of vacant posts among senior
managers within the municipality. A senior manager
is a municipal manager, appointed in terms of
section 57 of the Municipal Systems Act, and
includes managers directly accountable to a
municipal manager appointed in terms of section 56
Definition of the Act.
(1) Simple count of the number of vacant posts for
Calculation senior managers
Frequency of reporting Quarterly
Source Municipal Human Resource Management Systems
Notes Non-cumulative, as at the time of reporting.
Ref. & Title C37 Number of approved posts in the treasury and
budget office:
This indicator measures the number of approved
posts within a municipality's budget and treasury
office as an indicator of intended municipal
Rationale capacity.
The number of approved posts in the treasury and
budget office. The Budget and Treasury office is
responsible for the managing a municipality's
financial resources in an efficient and professional
manner while providing support to all departments
in order to ensure that all legislation policies and
procedures as prescribed by National Treasury are
implemented and upheld. An approved job post
refers to employment posts that have been
developed in relation to the Municipal Structures
Act of 1998 and the Municipal Finance
Management Act of 2003 and has been approved
Definition by the Municipal Manager.
(1) Simple count of the number of approved post in
Calculation the treasury and budget office
Frequency of reporting Annual
Source Municipal Human Resource Management Systems
This indicator can be used with the following
indicator to calculate the vacancy rate for the
Notes budget and treasury office within the municipality.
Ref. & Title C38 Number of filled posts in the treasury and
budget office:
98
This indicator measures the number of the
municipality's filled posts related to the treasury and
Rationale budget office as an indicator of municipal capacity.
The number of filled posts in the treasury and
budget office. The Budget and Treasury office is
responsible for the managing a municipality's
financial resources in an efficient and professional
manner while providing support to all departments
in order to ensure that all legislation policies and
procedures as prescribed by National Treasury are
Definition implemented and upheld.
(1) Simple count of the number of filled posts in the
Calculation treasury and budget office
Frequency of reporting Quarterly
Source Municipal Human Resource Management Systems
Non-cumulative, as at the time of reporting. This
indicator can be used with the preceding indicator
to calculate the vacancy rate for the budget and
Notes treasury office within the municipality.
Ref. & Title C40 Number of filled posts in the development and
planning department
This indicator monitors the extent to which a
municipality fills posts within its development and
planning department. It is an indicator of municipal
Rationale capacity related to this function.
Definition The number of filled posts in the planning and
development department. A development and
99
planning department is charged with the planning
function within the municipality. An approved job
post refers to employment posts that have been
developed in relation to the Municipal Structures
Act of 1998 and the Municipal Finance
Management Act of 2003, and has been approved
by the Municipal Manager. This only refers to
approved posts that have been filled.
(1) Simple count of the number of filled posts in the
Calculation treasury and budget office
Frequency of reporting Quarterly
Source Municipal Human Resource Management Systems
Non-cumulative, as at the time of reporting. This
indicator can be used with the preceding indicator
to calculate the vacancy rate for the planning
Notes department within the municipality.
102
municipality has actual waste management capacity
in its municipal structure. This is an indicator of
municipal capacity.
The number of waste management posts filled in
terms of the approved structure. Waste
management includes the activities and actions
required to manage waste from its inception to its
final disposal. This includes the collection,
transport, treatment and disposal of waste, together
with monitoring and regulation of the waste
Definition management process.
(1) Simple count of the number of filled waste
Calculation management posts
Frequency of reporting Quarterly
Source Municipal Human Resource Management Systems
Non-cumulative, as at the time of reporting. This
indicator can be used with the preceding indicator
to calculate the vacancy rate for waste
Notes management within the municipality.
Ref. & Title C63 Total volume of water delivered by water trucks
With the increase in informality, municipalities are
becoming more reliant on the delivery of water to
informal settlements with water trucks, which is an
expensive exercise. This indicator therefore
monitors the total volume of water delivered by
Rationale water truck to a municipality.
The total volume of water (in kilolitres) delivered by
water truck to a municipal area. A water truck is a
vehicle designed with a water container for storing
Definition and transporting water for consumptive purposes.
(1) Sum of the volume of water (in kilolitres)
Calculation delivered by water truck within the municipal area
Frequency of reporting Quarterly
Source WSA
This indicator is cumulative over the financial year.
It is water for consumptive purposes and not in
Notes relation to use by the fire brigade.
111
costs of the municipal public transport fleet, as well
as contracted vehicles within the municipal fleet.
This indicator is useful in various calculations of the
financial viability of the public transport service.
The R-value of all direct municipal, and municipally-
contracted, vehicle operational costs. Municipal
vehicle operational costs refers to the costs off
public transport vehicles that vary with vehicle
usage, including fuel, tires, maintenance, repairs,
and mileage-dependent depreciation costs. This is
also inclusive of the staff and overhead operational
costs. Municipality-contracted vehicles refer to
fleets that are owned by private transport
companies, but are operated by municipalities for
public transport purposes. Any definitional
clarification should be sought from the latest
Division of Revenue Act as it relates to 'operational
Definition costs'.
(1) Sum of the R-value spent on all direct municipal
vehicle operational costs for public transport within
Calculation the municipal area, for the period of assessment
Frequency of reporting Quarterly
Source Municipal Transport Department
Cumulative measure, for the year to date. This can
be further disaggregated by vehicle type or
Notes category for lower level analysis.
Ref. & Title C80 Date of the last Council adopted Development
Charges policy
A Development Charges policy is a way to
approach the costs of large-scale developments in
terms of the developer's contribution to bulk and
connecting infrastructure required by the
development. It is a source of revenue for
Rationale municipalities.
The date of the last Development Charges policy
adopted by the municipal council. A 'Development
Charge' is also known as a capital contribution,
engineering service contribution, bulk infrastructure
connection levy or an impact fee (internationally). It
is a once-off capital charge to recover the actual
cost of external infrastructure required to
accommodate the additional impact of a new
Definition development on engineering services.
(1) dd/mm/yyyy of a Development Charges policy,
or a policy that contains provisions for the levying of
Calculation development charges within the municipality
Frequency of reporting Annual
Source Council records
Notes None.
Ref. & Title C83 Number of building plans approved after first
review
This indicator monitors the quality of building plans
that are submitted to the municipality in terms of
how many are approved on the basis of their first
review. Rejection of building plans due to a lack of
understanding of the planning requirements
contributes to a lack of investment and pipeline of
projects, which effects the economy. By tracking the
number of building plans approved on first review
there is an indication of the scale of first review
Rationale approval.
Definition The building plan review process is a coordinated
process for the review of projects and building plans
which generally result in the issuance of a building
permit. The process coordinates the review of staff
representatives typically from Planning, Building,
Engineering and Fire functions. This team reviews
each project for compliance with applicable plans
and code requirements. The review process
consists of typically one to three City reviews. Most
120
projects require at least two reviews. The number of
reviews will depend on the level and complexity of
the review and the completeness of the submittal.
Projects with complete drawings and thorough
responses to staff’s comments should meet the
two-review time line. Measuring the number of
projects approved on first review is an indicator of
the ease of meeting building plan compliance
provisions within the municipality.
(1) Simple count of the number of building plans
Calculation approved after first review
Frequency of reporting Quarterly
Building Development Management or relevant
Source department
Notes Cumulative, financial year to date
Ref. & Title C84 Number of building plans submitted for review
This indicator measures the number of building
plans that are submitted to the municipality. It is an
indication of scale of building plan submissions,
Rationale regardless of size.
The number of building plans submitted for review
to the municipality. The building plan review
process is coordinated process for the review of
projects and building plans which generally result in
the issuance of a building permit. The process
coordinates the review of staff representatives
typically from Planning, Building, Engineering and
Fire functions. This team reviews each project for
compliance with applicable plans and code
requirements. This indicator gives a measure of the
Definition scale of building plan submissions.
(1) Simple count of the number of building plans
Calculation submitted for review to the municipality
Frequency of reporting Quarterly
Building Development Management or relevant
Source department
Notes Cumulative, financial year to date
123
Appendix A- List of all intermediate city municipalities
# NAME OF MUNICIPALICITY
1 Emfuleni LM
2 The Msunduzi LM
3 Mbombela/Umjindi LM
4 Polokwane LM
5 Rustenburg LM
6 Matjhabeng LM
7 Emalahleni LM
8 Matlosana LM
9 LM of Madibeng
10 Bushbuckridge LM
11 Mogale City LM
12 Newcastle LM
13 Maluti a Phofung LM
14 Nkomazi LM
15 Makhado LM
16 Govan Mbeki LM
17 Greater Tzaneen LM
18 uMhlathuze LM
19 Thulamela LM
20 Sol Plaatjie LM
21 Rand West LM
22 Mogalakwena LM
23 Drakenstein LM
24 Steve Tshwete LM
25 Mafikeng LM
26 KwaDukuza LM
27 Merafong City LM
28 Ventersdorp/Tlokwe LM
29 Tsolwana/Inkwanca/Lukanji LM
30 Ladysmith/Indaka LM
31 Greater Tubatse/Fetakgomo LM
32 George LM
33 Greater Giyani LM
34 King Sabata Dalindyebo LM
35 Metsimaholo LM
36 Hibiscus Coast LM
37 Ba-Phalaborwa LM
38 Stellenbosch LM
39 Lephalale LM
124
Appendix B- Acronyms
ACRONYMS
AEL Atmospheric Emission Licenses
AQ Air Quality
BEPP Built Environment and Performance Plan
BRT Bus rapid transit
COGTA Department for Cooperative Governance and Traditional Affairs
CSP Cities Support Programme
DEA Department of Environment Affairs
DHS Department of Human Settlements
DoE Department of Energy
DWS Department of Water & Sanitation
EE Energy and Electricity
ENV Environment and Waste
GHG Green House Gas
GHS General Household Survey
GIS Geographic Information Systems
HS Housing and Community Facilities
IDP Integrated Development Plan
IPP Independent Power Producers
IPTN Integrated Public Transport Network
ISO International Organisation for Standardisation- This refers to ISO
37120- Sustainable development of communities: Indicators for city
services and quality of life (2014).
LED Local Economic Development
MAQI Metro Air Quality Index
MBT Minibus Taxis
MTSF Medium Term Strategic Framework
Mwh MegaWatt Hour
NAEIS National Atmospheric Emission Inventory System
NDoT National Department of Transport
NERSA National Energy Regulator South Africa
NMT Non-motorised transport
NT National Treasury
PT Public transport
RTMC Road Traffic Management Corporation
125
ACRONYMS
SAPS South African Police Service
SDBIP Service Delivery and Budget Implementation Plan
SDG Sustainable Development Goals
StatsSA Statistics South Africa
TOD Transit-oriented development
TR Transport and Roads
WS Water and Sanitation
WSA Water Service Authority
WSP Water Service Provider
WWTW Wastewater Treatment Works
126
Appendix C- Glossary
Word Definition
Attendance at an Enrol at and go regularly to any accredited educational
educational institution (public or private) for organised learning at any
institution level of education. Attendance can be full-time or part-time,
and distance learning is included. Temporary absence, e.g.
due to illness, does not interrupt attendance.
Access point A designated service interface (e.g. a BRT station, taxi rank,
multi-modal interchange, etc) forming part of the
municipality's approved public transport network, and which
provides access to a scheduled service during the workday
morning peak.
Block of flats A structure, usually multi-storey, consisting of a number of
dwellings sharing the same residential address, and usually
sharing a common entrance, foyer or staircase. (Note that
some people in South Africa use the word ‘flat’ to refer to a
whole block of flats. In this document, the word flat is used to
refer to a single unit only).
Bucket sanitation A toilet system with a pail or other removable receptacle
system placed directly under the toilet seat, and where no water or
chemicals are used.
Callout Refers to a reported incident of service outage that requires
on site inspections as part of the process of resolving the
issue. A callout does not equate to resolution of the matter
reported, only that someone is on site to confirm the nature of
the service outage.
Confidentiality A property of data indicating the extent to which their
unauthorised disclosure could be prejudicial or harmful to the
interest of the source or other relevant parties.
Connection An infrastructural linkage between a supply of a basic service
(e.g. water, sewerage, elecricity, etc) and a user.
Consumer An entity to which the service is (or would be) delivered, and
unit/billing unit which receives one bill if the service is billed, alternatively
known as a delivery point. (This concept is often referred to
as a household by municipalities, but this is not strictly
correct, as households and consumer units do not coincide
one to one, particularly in blocks of flats, on stands where
there are multiple households in the same dwelling, or in
additional dwellings, such as garden flats, backyard rooms,
etc., and in the case of public taps.)
Disability The loss or elimination of opportunities to take part in the life
of the community, equitably with others, that is encountered
by persons having physical, sensory, psychological,
developmental, learning, neurological or other impairments,
which may be permanent, temporary or episodic in nature,
thereby causing activity limitations and participation
restriction with the mainstream society.
Displaced person Persons who were forced to or obliged to leave their homes
as a result of natural or human-made disasters, armed
conflict, situations of generalised violence or violations of
human rights.
127
Word Definition
Domestic consumer An entity to which the service is (or would be) delivered, and
unit which receives one bill if the service is billed, alternatively
known as a delivery point. (This concept is often referred to
as a household by municipalities, but this is not strictly
correct, as households and consumer units do not coincide
one to one, particularly in blocks of flats, on stands where
there are multiple households in the same dwelling or in
additional dwellings, such as garden flats, backyard rooms,
etc., and in the case of public taps.)
Dwelling Any structure intended or used for human habitation.
Dwelling unit Structure or part of a structure or group of structures
occupied or meant to be occupied by one or more than one
household. Includes a structure or part of a structure that is
vacant and/or under construction, but can be lived in at the
time of the survey. Includes units in collective living quarters,
unlike housing units. Dwelling units may therefore comprise
housing units plus units in collective living quarters when
applicable. (Examples of each are a house, a group of huts,
and a flat.) A dwelling unit has a separate entrance from
outside or from a common space, as in a block of flats.
Premises not intended for use as living quarters, but used for
human habitation at the time of the census, such as a barn,
warehouse, etc., are also classified as dwelling units for
census purposes. 5Community Survey 2016 Metadata
Educational Any registered institution whose sole or main purpose is the
institution provision of education, including preschool, tertiary, adult
education, etc.
Electricity Provision of electricity service to consumer units connected
to national grid and non-grid.
Embedded Refers to small scale production localised to a site (or sites)
generation within the electricity distribution network, close to the place of
consumption. This refers to systems of 1 MW and below.
Employed Those who performed work for pay, profit or family gain for at
least one hour in the seven days prior to the interview or who
were absent from work during these seven days, but did have
some form of paid work to return to.
Erf/erven The site, stand, yard, or plot described by cadastre on a map;
physically, it may be defined by any material marking the
perimeter of the property, e.g. fence, hedge, brick wall, etc.
The cadastre can, however, be an imaginary line and
therefore may not be physically observable.
Erf/erven number A number(s) assigned to an individual site, yard or plot on the
map. This number may not be the same as the
physical/street address number; however, in some cases,
especially in the old townships, the erf/erven number(s) and
the street number(s) coincide.
Farms Farms cover an extensive area. The land is cultivated and
the field size is usually quite large. Farm boundaries can be
easily distinguished on the aerial photos; they are normally
fence lines, edges of the fields, roads or rivers. The fields are
cultivated with a variety of crops and the crops differ from
128
Word Definition
season to season and from area to area. The field size will
vary and may be affected by the size of the farm, local
climate (rainy or not) and the amount of mechanisation on the
farm. Most fields on farms are large. Cattle, sheep and other
livestock (horses, ostrich and game on a smaller scale) are
also reared on farms. These farms have large fenced grazing
areas (paddocks) with grass cover for the livestock to graze.
Financial year Refers to the local government financial year beginning 1
July and concluding on 30 June.
Flat A flat (or apartment) is a dwelling, usually on one floor, with
at least one wall shared with another such dwelling, within a
block of flats.
Formal dwelling A structure built according to approved plans, i.e. house on a
separate stand, flat or apartment, townhouse, room in a
backyard or rooms or flatlet elsewhere.
Formal sector Sector of employment made up of all employing businesses
that are registered in any way.
Free basic An amount of electricity determined by government that
electricity should be provided free to poor households to meet basic
needs.
Free basic water An amount of water determined by government that should
be provided free to poor households to meet basic needs,
currently set at 6 kl per month per household within 200
metres from each dwelling.
Household A group of persons who live together and provide themselves
jointly with food or other essentials for living, or a single
person who lives alone. A household is distinct from a
dwelling or consumer unit in that there may be multiple
households sharing one dwelling or consumer unit.
Independent Power Non-utility generators of electricity through private entities
Producer which own and/or operate facilities. IPPs are usually
orientated towards renewable energy.
Indicator Specified and defined quantitative or qualitative
measurement that tracks progress in relation to a stated
intention.
Indigent household These are poor households as determined by municipalities.
The basis on which a municipality determines if a household
is indigent (and the criteria used for such determination) can
vary.
Informal settlement An unplanned settlement on land which has not bene
surveyed or proclaimed as residential, consisting mainly of
informal dwellings (shacks).
Infrastructure Physical structures used for the delivery of services (e.g.
power lines, pipes, roads and assets such as trucks and
equipment to unblock sewerage, pay-point offices and
computers).
Integrated A process by which municipalities prepare 5-year strategic
Development Plan plans that are reviewed annually in consultation with
communities and stakeholders.
Mains (electricity) Transmission and distribution a networked electrical grid of
the state.
129
Word Definition
Mains (water) Transmission and distribution water mains pipeline.
Metropolitan Metropolitan municipality means a municipality that has
municipality exclusive executive and legislative authority in its area, and
which is described in section 155(1) of the Constitution as a
category A municipality. (Refer to Local Government:
Municipal Structure Act 1998, (Act No, 117 of 1998).)
Mini grid-based Refers to a small local low distribution electricity grid
system servicing specific sites, which can be off-grid or connected to
the central electricity grid.
Municipality Municipality is a generic term describing the unit of
government in the local sphere responsible for local
government in a geographically demarcated area, and
includes district, local and metropolitan municipalities. A
municipality is an institution consisting of a municipal council
(elected political representatives) and the municipal
administration (appointed officials).
Non-domestic unit This includes all other consumer units excluding domestic
e.g. industrial, commercial, schools, clinics, hospitals and
government departments etc.
Outcome The results following from the delivery of interventions,
products, goods or services for beneficiaries that are a logical
consequence of achieving specific outputs.
Output The final products, goods or services produced for delivery.
Part-time employees Part-time employees are employees (permanent, temporary
or casual) who are not full-time employees as defined above
or who normally work less than 35 hours per week, including
seasonal employees.
Priority Housing Areas announced by the Minister of Human Settlements in
Development Areas terms of Section 7 (3) of the Housing Development Agency
Act, 2008 read with section 3.2 of the Housing Act. These are
areas intended to advance Human Settlements Spatial
Transformation and Consolidation by ensuring that the
delivery of housing is used to restructure and revitalise towns
and cities, strengthen the livelihood prospects of households
and overcome apartheid spatial patterns by fostering
integrated urban forms. It is underpinnned by the principles of
the National Development Plan (NDP) and the Integrated
Urban Development Framework (IUDF). Emphasis is placed
on synchronising national housing programmes in PHDAs.
Protest incident A gathering, activity or march where all of the following apply:
(1) it was not authorised by the relevant authority, or the
activities ceased to comply with what was authorised; and (2)
one or more of the following issues were cited as a cause /
issue: Housing problems, Water problems, Electricity
problems, Transport problems, Disputes with Council; and (3)
15 or more people were involved; and (4) it took place on a
public road or public space. Protest incidents may be violent
or non-violent. Note that this definition does not include a
gathering, activity or march that took place as authorised.
Regular Payments received from persons who are not household
allowance/remittanc members, such as parents who live in another household or
130
Word Definition
es received from aunts/uncles and other non-household members.
non-household
members
Regular receipts Retirement income received from your former employment.
from pension from
previous
employment and
pension from
annuity funds
Salaries and wages Salary is a permanent regular payment, normally paid on a
monthly basis made by an employer to an employee. Wage
is a permanent regular payment earned for work or services,
normally paid on a daily or weekly basis. 8Community
Survey 2016 Metadata
Serviced Something is "serviced" when it has been connected receives
at least the three basic servies of water, sanitation and
electricity.
Sewerage and Provision of flush toilet connected to public sewerage system,
sanitation services or conservancy tank, bucket toilet, pit latrine/toilet with
ventilation pipe, pit latrine/toilet without ventilation pipe, other
toilet such as ecological toilet (e.g. urine diversion, enviroloo).
Site A site refers to a pre-determined area where basic services
can be provided, there is some degree of security of tenure
and to which a household can be situated or relocated and/or
upgraded.
Solid waste Provision of refuse removal service to consumer units on a
management periodic basis
services
Technical Indicator A template for specifying and defining an indicator that
Description includes the details of all generic metadata for an indicator.
Vacancy An unoccupied position or job within a municipality which
reflects on the official organisational structure.
Water services Provision of piped water services to consumer units, inside
the yard, less than 200m from the yard and more than 200m
from the yard.
131
Appendix D- Background to developing a common set
of indicators
Introduction
The initiative to develop a common set of indicators for local government builds on the
joint work of the Department of Cooperative Governance (DCOG), National Treasury
and the Department of Planning, Monitoring & Evaluation (DPME) to implement
reporting reforms at municipal level. The initiative began by reviewing, rationalising and
streamlining reporting arrangements in metropolitan municipalities as communicated in
MFMA Circular No. 88 of 2017 and in the addendum in December 2019. In the circular it
was highlighted that the reform process would be taken forward with respect to the
provisions of Section 43 of the Municipal Systems Act (MSA) 32 of 2000 which provides
for the Minister of local government, after consultation with MECs for local government
and organised local government representing local government nationally, to prescribe
and regulate key performance indicators to local government generally. Therefore, this
process, and submissions made as part of it, is formative input to the eventual reform of
the Local Government: Municipal Planning and Performance Management Regulations
of 2001. The initiative should therefore be viewed as a step towards revising the existing
regulations pertaining to local government performance indicators provided for in
Section 43 of the MSA in consultation with key stakeholders.
Problem statement
Initial assessments of municipal reporting obligations identified 2 572 indicators
requiring not less than 18 947 data elements to be reported by metropolitan
municipalities annually. While the reporting obligations are greatest among category A
municipalities, this is nevertheless indicative of a reporting burden which all
municipalities experience. Applying the provisions of the Framework for Managing
Programme Performance Information (FMPPI) (National Treasury, 2007), preliminary
analysis has confirmed that the current distribution of indicators among municipalities is
concentrated at the lower end of the results-chain, without sufficient attention and
consideration given to higher-level indicators, particularly those at output and outcome
level where there is a key logical linkage required to ensure the realisation of
government policy and strategic intentions.
Building upon past analysis, and understanding the challenges of local government, this
initiative is therefore a response to the following identified municipal reporting issues:
There are too many indicators and requests from national and provincial
departments which municipalities are expected to report upon and they are not
sufficiently strategic;
There is duplication, fragmentation and insufficient coordination of how this
performance information is managed and reported, resulting in an inefficient use
of resources; and
Indicators at output and outcome level are generally undeveloped and
insufficient attention has been paid to the relationship between outputs and
outcomes in crafting and selecting performance indicators.
At the results-level of “Output” an emphasis has been placed on the functional link
between the “final products, goods or services produced for delivery” (National
Treasury, 2007), particularly as it relates to the achievement of outcomes. Although
previously explicit, this process seeks to strengthen the functional linkage between
outputs and outcomes while making a selection of only the most useful output
indicators1 which are an indication of progress toward the outcome. Thus, all output and
outcome indicators are proposed in relation to a generic outcome relevant to an area of
functional priority. There is an acknowledgment that not all of the possible functions of
local government will be regulated, only those deemed relevant to the prioritised
outcomes (e.g. basic services, governance, etc).
Given the problem statement and the strategic focus of the initiative, the process will not
embark upon the development of indicators for “Activities” or “Inputs”. As previous
analysis has shown, the planning and reporting system tends to reflect a
disproportionate amount of these measures which are often removed and with only
tenuous linkages to results.
Readiness of indicators
The process of indicator consultation has led to the evolution of a tier classification
system in terms of readiness for tracking indicators. To indicate whether an indicator is
well-defined, with a set of methodologies and pre-existing datasets available to begin
1
In some instances, where an indicator of efficiency can be supplied, this is utilised in lieu of a
“strict” output measure.
2
Note this conceptual frame does not make use of the “sub-outcome” distinction introduced in
the previous MTSF as it lacks a defined basis within South African government-wide monitoring
& evaluation frameworks.
133
reporting on these indicators, a tier classification has been introduced. Applying a
similar version of indicator readiness classification used for the SDG by the United
Nations (UN, 2016), the following tiers have been developed and applied for this
exercise:
On the basis of this tier classification system there is the possibility to differentiate and
incrementally introduce metrics for implementation as a requirement of planning and
reporting. All Tier 1 and Tier 2 indicators are understood to be considered ready for
reporting, whereas Tier 3 and Tier 4 require further work and development prior to
introduction, but the intention is to progress them over time to Tier 1 and Tier 2. It is also
conceivable that some indicators would be placed at Tier 1 and Tier 2 for certain
categories of municipalities due to data collection and management systems that are
more advanced generally (e.g. A1), while Tier 3 and Tier 4 in other instances (e.g. B4).
As a result, all indicators developed as part of this process distinguish between reporting
responsibilities that are:
Exclusively the responsibility of the municipality;
Exclusively the responsibility of a national department of state entity to source
and provide data to the municipality; and
Shared between the municipality and a national department or state entity,
where the measure is a composite of multiple data elements and sources.
134
The implication of this is that performance indicators for reporting need not be sourced,
collated, managed and stored by the municipality only as there are efficiencies to be
derived by an integrated system where the custodians of information (whether
municipal, national department or state entity) release data via a shared platform.
However, the above pre-supposes an integrated government-wide planning, monitoring
& evaluation system across the three spheres of government which does not yet exist.
Thus, any indicators that are not identified as the sole responsibility of the municipality
would not impose a reporting burden.
Indicator architecture
All indicators are made up of one or more data elements. Data elements are the most
basic unit of measure that indicators are built upon. An example of the four data
elements that inform the indicator of Percentage of households with access to a basic
water supply is provided below to illustrate this:
Data elements are therefore the building blocks of all indicators and this process seeks
to ensure that all indicators are adequately defined at this level. In the case of outputs,
many indicators comprise only one data element.
below presents an example technical indicator description (TID) setting out the
definition of an indicator. Note that the TIDs provide both a rationale for the indicator, a
definition and calculation, as well as define the constituent data elements.
135
Figure 2: An example technical indicator description
136