Professional Documents
Culture Documents
Bridge
Bridge
15
15
20
EP
EP
3m
3m
7m
7m
0.0%
0.0%
26.181m
26.282m
26.383m
26.483m
26.584m
26.081m
26.685m
3.5m
EP
2.5%
2.5%
-2.5%
-2.5%
26.785m
26.042m
2.5%
-2.5%
-2.5%
-2.5%
7m
7m
26.209
EP
m
3m
3m
25
EP
BRIDGE PLAN
EP
ABUTMENT A
SPAN 1 25 METER POST TENSIONED 'I' BEAM
SPAN 1 - PIER 1
PIER 1 - SPAN2
PIER 2 - SPAN 3
20.707 26.042
20.712 26.027
22.039 26.081
20.689 26.181
12.557 26.282
12.855 26.383
22.482 26.483
25.263 26.584
25.541 26.685
Finished Level SPAN 3 25 METER POST TENSIONED 'I' BEAM
ABUTMENT B
Ground Level REFER TO I BEAM DRAWINGS AND BEARING SCHEDULE FOR FURTHER DETAILS
CH 475.000
CH 480.000
CH 500.000
CH 525.000
CH 550.000
CH 575.000
CH 575.429
CH 600.000
CH 625.000
CH 650.000
Chainage/Station (road1)
Horizontal Alignment
Right -0.04%/m 0.04%/m
Superelevation
Left -1.66%
Vertical Alignment
25.642
25.627
25.681
25.781
25.882
25.983
26.083
26.184
26.285
EarthWorks Level
BRIDGE ELEVATION
BRIDGE - PILE LAYOUT PLAN
BRIDGE - PLAN
FOOTWAY MARGINAL CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY MARGINAL FOOTWAY
STRIP CL OF ROAD STRIP
1:25 1:25
1:25 1:25