Toaz - Info 120417162 Man Hour Estimate PR
Toaz - Info 120417162 Man Hour Estimate PR
0
0.0
SUB TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
No. of Drawings Eng'g Design CADD Total Hours NEW EXISTING NEW EXISTING
New
TOTAL MAN-HOURS (FROM OTHER SHEETS) 0 0 0 0 ### 0.0 0.0 0.0 0.0 0.0
NON-DRAFTED DRAWINGS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Non-Deliverables 0 0.0 0.0 0.0
Design Basis/Technical Narrative 80 80
Assumptions:
1 Only compliance with contract scope and specification/code
requirements.
2. The system to be reviewed will only consisted of new pump
station ( Phase-I (6+2 pumps) & Phase-II (6+1 pumps) with
auxilliaries like chlorine injection points, flow meter & Air Release
Valves)
NON-DRAFTED DRAWINGS Total Hrs :--------------------> 2510.0 0.0 0.0 2510.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MAN-HOUR DISTRIBUTION Hrs CHECK LIST: Please Check all the following items are taken care or not. Yes No ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MUHAMMAD TARIQ 800 1.All New Dwg. Covered P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
BASSIM ALHAMOUD 500 2.All Exsisting Dwg. Covered P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
HUSSAIN ALKHUDAIR 500 3.Field Visit & Dwg. Search P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
IMTINAN MOHSIN 710 4.Sub Contract P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
5.Requisitions P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6.Data Sheets P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7.Calculations P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8.Materials Take Offs P ### 0.0 0.0 0.0 0.0 0.0
PM-DEM-20/01 (04-10)
Page 1 of 1