Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

1 2 3 4 5 6 7 8

N118

L115 FROM OLTC


A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

-X1 4 -X1 5
L115
/5.D4

TO AVR
N118
/5.C4
1 3

-F1
16A
SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

-K4
2 4 /1.B2
L114 13 14
/6.A2 B
B 21 22

L114
/8.D3
A1 31 32
-K4 43 44
/1.B4
A2

L115
RTCC CONTROL
L115 SUPPLY FAIL
/6.A2

-S1
/4.B4
INDEPENDENT
OFF
FOLLOWER
MASTER
A2
-X2 2 N501
2
C C
B2
-X2 1 N500

L114

-H1
L114 X1 X2 L115

SUPPLY HEALTHY LAMP INDICATION


L114 -X2 3
N502 N502
-S1
/4.B4
D D
-S1
/4.C4 INDEPENDENT
OFF
FOLLOWER
MASTER
A1 N503 -X2 4 N503
INDEPENDENT
1
OFF
FOLLOWER
MASTER

N8 -X1 1 N8 6 C2 B1
/2.D2 L115
D2 N504 -X2 5 N504
L115
-S1
N8 N8 S13 L150 -X2 26 L150 /4.C4

INDEPENDENT
-S1 OFF
FOLLOWER
/4.E4 MASTER
C1
E 5 E
INDEPENDENT
OFF
FOLLOWER D1 N505 -X2 6 N505
MASTER
Q1 N137
19
R1 -K2 -X1 20 N137
S1 /2.D7
T1 N118 13 14 N35 -X1 8 N35
/2.E7

N35 N35

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 1
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-S1
/4.B4
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

INDEPENDENT
OFF
FOLLOWER
-X2 11 MASTER
A3 N514 -X2 12
N513 N513 3

B3
-S1
/4.B4

INDEPENDENT
OFF
FOLLOWER
-X2 13 MASTER
A4 N517 -X2 14 N517 N517
N516 N516 4
SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

B4
N530

B -S1 B
/4.C4

INDEPENDENT
OFF
FOLLOWER
-X2 17 MASTER
E2 N416 -X2 20 N616 -X2 21 N616
N520 N520 8
F2 N530
G2 N532 -S1
/4.C4

N521 -X2 18 INDEPENDENT


OFF
FOLLOWER

N519 -X2 16 N519 7


MASTER
E1
F1 N531
-S1 -K2 G1
/4.E4 /2.D7
43 44 N531
C C

N518
INDEPENDENT
OFF
FOLLOWER
N509 -X2 9 N509 MASTER
N510 -X1 13 N510 18
N1 N532 -X2 15
-X2 10 P1 N518 N518
N508 N508

N532

/2.E4
/2.D3

/2.F4
/2.C5
/1.E3
A1

A2
N35

54
62
72
84
44
22
32
13 14
-S1

/2.D6
-K2
/4.C4

21
31

61
71
43
53

83
/2.D6
-K2
INDEPENDENT
-K2 OFF
FOLLOWER
/2.D7 MASTER

/2.E3
N8 21 22 N8A 10 TIME DELAY RELAY
D D

28
15
N8B N8B N35

/2.D6
-K1
H2

A1

A2
N8

18

25
16

26
/1.D2

/2.D6
-K1
-K1
N8 18 -H2
15 N8C N8C X1 X2 N35
16

/2.D7
-B4
N8C N35 N35
/1.E6
E E
OUT OF STEP BUZZER
-K2
N423 /2.D7 -X2 8
-X1 11 N423 53 54 N507 N507
/5.B5
-K2
N424 /2.D7 -X2 7
-X1 12 N424 83 84 N506 N506
/5.B5

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 2
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

LINK ON FIRST PANEL


PANEL INSTRUCTION N504 (X2-5) WITH N513 (X2-11)
MASTER TO FOLLOWER N520 (X2-17) WITH N521 (X2-18)
N500 (X2-1) TO N501 (X2-2)
SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

N502 (X2-3) TO N503 (X2-4)


N504 (X2-5) TO N504 (X2-5) LINK ON LAST PANEL
B B
N505 (X2-6) TO N505 (X2-6)
N500 (X2-1) WITH N504 (X2-5)
N506 (X2-7) TO N506 (X2-7)
N502 (X2-3) WITH N505 (X2-6)
N507 (X2-8) TO N507 (X2-8)
N516 (X2-13) WITH N518 (X2-15)
N509 (X2-9) TO N509 (X2-9)
N519 (X2-16) WITH N521 (X2-18)
N508 (X2-10) TO N508 (X2-10)
N514 (X2-12) TO N513 (X2-11)
N516 (X2-13) TO N517 (X2-14)
N518 (X2-15) TO N518 (X2-15) LOOP N416 & N616 ONLY WHEN MORE
C N519 (X2-16) TO N520 (X2-17) THAN 2 RTCC'S ARE TO BE CONNECTED C
N521 (X2-18) TO N521 (X2-18)
LOOP N8 TO N0621 ON OLTC SIDE

D D

E E

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 3
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

-S1
SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

INDEPENDENT
OFF
FOLLOWER
MASTER

A1
B 1
B1
/1.D5 B
A2
2 /1.C3
B2
A3
3 /2.A3
B3
A4
4 /2.A4
B4
C1
5 /1.E5
D1
C2
6 /1.D3
D2
E1
7 F1 /2.B6
G1
E2 C
C 8 F2 /2.B4
G2
9
H1
10 /2.D3
H2
11
H3
12
H4
13
J1
14
K1
D L1 D
15

L2
16

17
M1
18 N1 /2.C4
P1
Q1
19 R1
S1 /1.E3
T1

E E

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 4
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

-S39 -S40 N423


SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

/6.A4 /6.A4 /2.E3


N424 N237C N423 -X1 10 N423 N423
LOWER PUSH BUTTON RAISE PUSH BUTTON B
B

N237C
-X1 9 N424 N424

N424
/2.F3
MANUAL

N237 -X1 2 N237 N237B -X3 9 16 15 -X3 10 N423


AUTO
C
-S11
SCADA

-X3 11 17 18 -X3 12 N424

FROM TR I/C-1
E110, E130.
N237A

-X3 4 E130 E130


4 C

R,Y
C
-X3 3 E110 E110
3

-X3 2 N118
2 /1.A3
-X3 1 L115 E110 E130
1 /1.A3 V1-V1 V2
0-145KV
/8.D3
TO ANN. FOR RELAY TROUBLE

AUTOMATIC VOLTAGE REGULATOR

D D

SCADA
-X3 13 X1 1 X1 2 -X3 14 N423
K1

X1 3 -X3 15 N424
K2
SCADA SWITCH K1 & K2 ARE IN
CUSTOMER SCOPE OF SUPPLY

E E

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 5
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-S39 -S40
/5.B3 /5.B4
L114 L114 L114A N197
/1.B3 A
A N197
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

L115
/1.B3
L114

L115
L115
L114

L114
TAP POSITION INDICATOR
-P1 L114 + - + -
4 N
L115 L105 -X1 36 L105 S1 -X6 1 L103 -X1 39 L103 S4 -X6 4
3 L 1 4 1 4
2 5
SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

-P2 S2 -P3 S5
2 L106 -X1 37 L106 5 L104 -X1 40 L104 5
MINCOMMAX 2 S3 3 2 S6 6
6 6

N211
N209

N213
B B
REMOTE WINDING REMOTE OIL
TEMP. INDICATOR TEMP. INDICATOR
-X1 18
-X1 25
-X1 19

N209

N211

N213

C C
230V AC SUPPLY

-X1 26 H101 H103


2
1

H103

H103
H103 N128
-X1 27 H102 H104
3

-F3
16A 1 1
-X1 6

H103
1

N128 N128
-F11 -F9

TAP CHANGE IN PROGRESS BUZZER


6A 6A
-S6 -X1 28
2 2 2

N128

TAP CHANGE STUCK


/8.C1

N128
N128

N128
H106

TAP CHANGE STUCK


D D
H105

H107

X1 X1
A2

BUZZER

LAMP
TO HOOTER CKT. -H8 -K3 -H9

-B2

-B3
X2 /6.E6 X2
1
/8.C1
1 A1

N35A
N35A
-K3

N35

N35
N35
-H6 -S38 /6.E6
2
-B1
-X1 29 N35 18 N35A
H104

15
-K3 16
H104

N35
/6.D6
H108

-X1 17 18
15
H104

16 /6.D6
N35
E 26 E
-E1 28
25 /8.D2
H104

TAP CHANGER
TIME DELAY RELAY

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 6
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

-ANN

-X4 1 L201 L201A TEST L235 L240


220V DC

2
1
SUPPLY

P1

AUX. SUPPLY
-PB1
-X4 2 K202 3

4
-F4 L202A ACCEPT L237 L240
2P, 6A P2
-PB2
SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

RESET L239 L240


B L201A -PB3 B
C1

T R I P
L240

AVR RELAY TROUBLE UNDER VOLTAGE


COM
L243
C2

PUMP TROUBLE/ NO OIL FLOW


RTCC CONTROL SUPPLY FAIL

MAIN TANK OIL LEVEL LOW

OLTC TANK OIL LEVEL LOW


TAP CHANGE INCOMPLETE
N O N-T R I P
L201A
C3
L202A
-VE
230VAC 40-300VDC

L243
T1
HOOTER

L245 L245
T2

C4
C H104 C
NE

/6.E4

FAN FAIL
H103
PH

SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

SPARE

SPARE
SPARE
/6.D4

F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 COM

L211

L221

L231
L205

L207

L209

L215

L217

L219

L225

L227

L229
L203

L213

L223

L233

L234
-X4 4 -X4 6 -X4 8 -X4 10 -X4 12 -X4 14 -X4 16 -X4 18 -X4 20 -X4 22 -X4 24 -X4 26 -X4 28
25

21 D
D
-K3 AVR
/6.E6 -K4
/1.B4 /5.D3
26
28

22
-X4 3 -X4 5 -X4 7 -X4 9 -X4 11 -X4 13 -X4 15 -X4 17 -X4 19 -X4 21 -X4 23 -X4 25 -X4 27
L234

L234

L234

L234

L234

L234

L234

L234

L234

L234

L234

L234

L234

L234

L234

L234
E E

F F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 8
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DEV ID LOCATION TECHNICAL DESCRIPTION RATING MAKE

-A2 (+RTCC) AUTOMATIC VOLTAGE REGULATING RELAY-EE-302 - Model=EE-302, AUX. SUPPLY-110V AC, 15VA. PT SUPPLY/ INPUT EMCO
VOLTAGE -110V AC, 50Hz, 1.5VA + LDC & AFR DESCRIPTION=FULL VERSION TECHNICAL SPEC. AS PER MANUAL. A
A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

-B1 (+RTCC) THERMOSTAT, 230V AC, 30°C TO 120°C GIRISH

-B2 (+RTCC) TAP CHANGE IN PROGRESS BUZZER, 110V AC ALAN/BHARANI/EQ

-B3 (+RTCC) TAP CHANGE STUCK BUZZER, 110V AC ALAN/BHARANI/EQ

-B4 (+RTCC) OUT OF STEP BUZZER, 110V AC ALAN/BHARANI/EQ

-E1 (+RTCC) HEATER, 230V AC 40W GIRISH


SYSTEM CONTROL & AUTOMATION PVT. LTD. - KOLKATA X:\Drawing\SOMA\ASB Energy Systems and Construction Pvt Ltd\RTCC\Schematic Drawing.e3s

-F1 (+RTCC) MINIATURE CIRCUIT BREAKER FOR RTCC SUPPLY, 230V AC,16A SIEMENS/L&T/SCHNEIDER
B B
-F3 (+RTCC) MINIATURE CIRCUIT BREAKER FOR RTCC SUPPLY, 230V AC,16A SIEMENS/L&T/SCHNEIDER

-F4, -F9 (+RTCC) MINIATURE CIRCUIT BREAKER FOR HEATER, 230V AC,6A SIEMENS/L&T/SCHNEIDER

-F11 (+RTCC) MINIATURE CIRCUIT BREAKER FOR RTCC SUPPLY, 230V AC,6A SIEMENS/L&T/SCHNEIDER

-H1 (+RTCC) SUPPLY HEALTHY LAMP INDICATION, 110V AC, GREEN SIEMENS/TECHNIC/EQ

-H2 (+RTCC) OUT OF STEP LAMP, 110V AC, RED SIEMENS/TECHNIC/EQ

-H6 (+RTCC) CFL, 11W, 230V AC PHILIPS/CGL/EQ

-H8 (+RTCC) TAP CHANGE IN PROGRESS LAMP, 110V AC, AMBER SIEMENS/TECHNIC/EQ
C C
-H9 (+RTCC) TAP CHANGE STUCK LAMP, 110V AC, RED SIEMENS/TECHNIC/EQ

-K1 (+RTCC) TIME DELAY RELAY, 0.3 SEC. TO 30 MIN., 1.3 A AC 110VAC/DC EAPL

-K2 (+RTCC) 2 NO+2NC AUX. CONTRACTOR + ADD ON 2NO+2NC, 110V AC COIL SIEMENS/L&T/SCHNEIDER

-K3 (+RTCC) TAP CHANGER TIME DELAY RELAY 0.3 SEC. TO 30 MIN., 1.3 A AC 110VAC/DC EAPL

-P1 (+RTCC) TAP POSITION INDICATOR - TYPE=EE610 DESCRIPTION=NO OF TAPS-13, INPUT 1K Ohm/Tap, EMCO
AUX SUPPLY-90-240V AC/DC, 4-20mA Analoge O/P.
-S1 (+RTCC) SEQUENCE SELECTOR SWITCH RECOM/EQ

D -S6 (+RTCC) DOOR LIMIT SWITCH, 230V AC KAYCEE/EQ D

-S11 (+RTCC) AUTO MANUAL AUTO SCADA SWITCH, 10A, 230V AC KAYCEE/SWITRON/EQ

-S13 (+RTCC) EMERGENCY PUSH BUTTON PUT ON TYPE WITH 1NO+1NC SIEMENS/KAYCEE/EQ

-S38 (+RTCC) 5/15A SWITCH SOCKET WITH 5A SHUTTER, 230V AC CGL/ANCHOR

-S39 (+RTCC) LOWER PUSH BUTTON 1 NO WITH ADDITIONAL 1NC BLOCK SIEMENS/EQ

-S40 (+RTCC) RAISE PUSH BUTTON 1 NO WITH ADDITIONAL 1NC BLOCK SIEMENS/EQ

-P2 (+RTCC) TEMPERATURE INDICATOR - MODEL=RWTI, EE 602 DESCRIPTION=DIGITAL REMOTE WINDING TEMP. EMCO
E INDICATOR INPUT=0 - 2.8K, O/P - 4-20mA, RANGE=0 - 150°C VOLTAGE=AUX SUPPLY-90V - 220V AC/DC E
-P3 (+RTCC) TEMPERATURE INDICATOR - MODEL=ROTI, EE 602 DESCRIPTION=DIGITAL REMOTE OIL TEMP. EMCO
INDICATOR INPUT=0 - 2.8K, O/P - 4-20mA, RANGE=0 - 150°C VOLTAGE=AUX SUPPLY-90V - 220V AC/DC
-PB1, -PB2, -PB3 (+RTCC) ANN. TEST, ACCEPT, RESET PUSH BUTTON 1 NO BLOCK SIEMENS/EQ

-ANN (+RTCC) 16 WINDOW ANNUNCIATOR WITH IN BUILT TEST, ACCEPT, RESET, MUTE PUSH BUTTON, SUPPLY VOLTAGE: 220V DC SIEMENS/EQ

-HTR (+RTCC) 3 TONE HOOTER (2 DC & 1 AC) SIEMENS/EQ

F -K4 (+RTCC) 2 NO+2NC AUX. CONTRACTOR, 110V AC COIL SIEMENS/L&T/SCHNEIDER F

DWG No. SCA/158/2022-23 CUSTOMER: ASB ENERGY SYSTEM & CONSTRUCTION


SYSTEM CONTROL & AUTOMATION PVT. LTD.
Date SCHEMATIC DRAWING OF
20.04.2023 PVT. LTD RTCC PANEL
Name S.M An ISO 9001:2015 Company PROJECT: Detailed Engineering & Cost estimation for construction 7
of new 1 No. 132kV bay and 1 No 33kV bay for of
Rev. Rev. By Date Scale N.T.S installation of additional new 150 MVA or existing 8
115MVA Power Transformer at 120 MWPP switchyard
1 2 3 4 5 6 7 8

You might also like