CENTRAL UNIVERSITY OF TECHNOL G FS

201 CDR11/2A

ASSIGNMENT 2: (100
Units 1-2: Mass concrete- and reinforced
structures
Assignment weight: 15% of FM
Due date: First Tuesday after Main Test week.

Problems/ Questions:
1.2 Make of
bending schedules to reinforce
use and calculate the mass of the
following members in Figure 1.2:
Beams (AA & BB): 500 x 750

.Compression bars: 2Y16 (b/code 33)


Stirips: R08-200 (b/code 60)
Tension bars: 3Y32 (b/code 33); only available in
lengths of 4000mm
Concrete cover 40mm
Columns (1 to 4): 750 x 500, RH -0.750m
4Y25
(b/code34)
2Y20
(b/code20)
Stirrips: R10-200
Concrete cover 40mm

Foundation (1 to 4): 500


2500x250 x

.Y25-200 (b/code 35)


Y20-250 (b/code 35)
Starter bars: See columns for details

Concrete cover: 50mm

LEARNING GUIDE
CDR11/2A NIRAL INIVE RSITY OF TECHNOLOGY, FS

Slab:
Tension bars: Y25-250 (b/code 33) C
Y20-250 (blcode 33)
Compression bars: Y20-200 (b/code 35)
Y16-200 (b/code 35) L
Spacers: R10; 2/m2

2500

4 BB
2000

SLAB 250mm

8000
+5500

AA

1.0
14000

Figure 1.2: Concrete structure

CW2 2014
REINFORcEMENT BENDING DIMENSIONS FOR SHAPE CODES (mm) DIAGRAM

TOTAL
MEMBER No IN
ERCH
LENGTH SHAPE
CODE A E/R
GEAM
SZE
(cum)
01
BEAM 2Y16 01 4 14400 |33 13120|
SOOX LBO8 02 142 235O L0 420 |G70
56x 3Y32 03| 22150 33 13920
T SL

14O00 14o0O
OF
COLU4Y25 04 1 6850 34 a6
750K2 Y20 OS|g |670o | 20 660 FOUJDATLON COLUMN
S0OX 35 RIO O6 |140 24OO 60670|420
4 OF

FOUND13|Y25 |o7 52 250o|3S


2900x Y20|08 |36|2250|35_2400

OF SLAR
AB 57y25 5 2 0033 7920 750

190033 Y20 1033|LSOO_33 13120|


D X 7 Y 2 0 1171 83003S 7120
Eo 4Y612 41128353VA
950 83|250 81 300 300
1 OF 221 RI013 |221
Of

NGL O5

2
2500 14O00
07

Dia. 121620 25 32 6 TOTAL


NAME ANDSURNAME: V.C. de VillierS SCALE:
S0
Y O14.12 3014 2769.6 61321 1651 5 STUDENTNo. 21LOO2O 38 QUESTION No:
CW2
131.342 468, 12