QUANTITY SURVEYOR TEAM

CHECK LIST
No Start Project During Construction End Project
1 Quotation Control Budget of Project: Handing Over:
 Structure works  Project Spending (PS)  Combine All Drawing
 Architecture works  Cash Flow Chart (Design and As Built)
 Mechanic and Electric works  …………………………  Certificate Final Claim
 Plumbing works  Handing Over Letter
 Furniture works  Site Report
 Landscape works  …………………
 Civil works (infrastructure)
 Other works
 …………………

2 Combine Document: Certificate Progress Claim to Client:


 Architecture drawing  Progress Work
 Structure drawing  Site Report
 MEP drawing  Site Measurement
 Interior drawing  …………………
 …………………
3 Document Submit to Site Engineer: Control Progress Claim of Sub-Con:
 Blank BOQ  Progress Work or Invoice
 Drawing (Struc. Archi.  Site Report
MEP…)  Site Measurement
 Master Schedule  ………………………
 Material List and Sub-Co List
 Project Task Review
 To Do List
 Purchasing Request (PR)
 Work Arrangement
 Investigation Sheet
 Inspection Sheet
 Record Attendant
 Variable Order Works (VO)
 Weekly Progress Works Form
 ………………………………

4 Contract: Other works:


 Contract with Owner  Variable Works
 Contract with Sub-Con  …………………
 ……………………………

5  Master Schedule
6  Material Board