PJO - Suspended Scaffolds - Installation, Dismantling and Relocation
PJO - Suspended Scaffolds - Installation, Dismantling and Relocation
PJO - Suspended Scaffolds - Installation, Dismantling and Relocation
CHECKPOINTS CHECK
1. Has suspended scaffold come from yard and been inspected?
2. Has the suspended scaffold been erected near overhead lines, electrical lines etc?
9. Is harness being used? Fitted correctly and hooked onto fixed object during procedure?
10. Has area below dismantling been demarcated and signage erected?
11. Where used is the Lifeline suitable and strong enough to take the load of fallen person?
13. Are visible employees on platform during dismantling and erection process?
14. Scaffolding material in good condition – no corrosion, bent, worn etc?
16.
17.
18. Correct safe/unsafe signage erected at stage of erection and area demarcated?
OK All in order.
X A fault was
N/A found.
Not applicable.
Recommendations