1. The document contains 14 multiple choice questions related to building design, construction, and zoning regulations. It asks about dimensions of a building project, required parking spaces, allowable building heights, and other technical specifications.
2. Key details asked about include the lot size of 48m x 99m, a total gross floor area of 2,484 square meters, and zoning classification of SPE. It also specifies that 3 boreholes are required to be performed for foundation investigation of the project.
3. The questions cover a range of topics pertaining to engineering design and code compliance for commercial construction as outlined in National Structural Code of the Philippines 2015.
Methodology For Definition of Bending Radius and Pullback Force in HDD Operations Danilo Machado L. Da Silva, Marcos V. Rodrigues, Asle Venås Antonio Roberto de Medeiros
1. The document contains 14 multiple choice questions related to building design, construction, and zoning regulations. It asks about dimensions of a building project, required parking spaces, allowable building heights, and other technical specifications.
2. Key details asked about include the lot size of 48m x 99m, a total gross floor area of 2,484 square meters, and zoning classification of SPE. It also specifies that 3 boreholes are required to be performed for foundation investigation of the project.
3. The questions cover a range of topics pertaining to engineering design and code compliance for commercial construction as outlined in National Structural Code of the Philippines 2015.
1. The document contains 14 multiple choice questions related to building design, construction, and zoning regulations. It asks about dimensions of a building project, required parking spaces, allowable building heights, and other technical specifications.
2. Key details asked about include the lot size of 48m x 99m, a total gross floor area of 2,484 square meters, and zoning classification of SPE. It also specifies that 3 boreholes are required to be performed for foundation investigation of the project.
3. The questions cover a range of topics pertaining to engineering design and code compliance for commercial construction as outlined in National Structural Code of the Philippines 2015.
1. The document contains 14 multiple choice questions related to building design, construction, and zoning regulations. It asks about dimensions of a building project, required parking spaces, allowable building heights, and other technical specifications.
2. Key details asked about include the lot size of 48m x 99m, a total gross floor area of 2,484 square meters, and zoning classification of SPE. It also specifies that 3 boreholes are required to be performed for foundation investigation of the project.
3. The questions cover a range of topics pertaining to engineering design and code compliance for commercial construction as outlined in National Structural Code of the Philippines 2015.
Easement Along Bodies/Way by Location, what shall be observed is the minimum width of easement required for regardless of use or occupancy, lot size, lot agricultural areas? dimensions, lot frontage and like a. 3m wide considerations? b. 10m wide a. 2 storeys c. 20m wide b. 2.5 storeys d. 40m wide c. 3 storeys d. 9 storeys 2. Based on Rule 8 of NBC, under Maximum Configuration of Basement 6. What is the Minimum Required Parking Slot for a Levels, what is the minimum RROW width that MOTEL? services the lot on which the a. 1 car slot for every unit basement can be constructed? b. 1 car slot for every 20 beds a. 8m wide c. 1 car slot for every 5 rooms b. 10m wide d. 1 car slot for every 2 units c. 20m wide d. 24m wide 7. Multi-floor parking garages may serve the 20% parking requirements of 3. For a R-3 use or occupancy with a firewall on the building/structure within ____________, two (2) sides, a firewall can provided at be erected on a maximum of ___ of the total least 80% of the parking requirements are length of each side property line; provided that complied with and integrated in all firewall construction shall not exceed ___ of the building design. the total perimeter of the R-3 property. a. 250m. radius a. 90%, 100% b. 300m radius b. 85%, 50% c. 200m radius c. 90%, 50% d. 100m radius d. 85%, 65% 8. Based on SECTION 708. Minimum Requirements for Group A Dwellings of 4. What is the maximum height to be allowed for Rule 7 NBC, Footings shall be of sufficient size buildings/structures based and strength to support the on their proposed use or occupancy? load of the dwelling and shall be at least a. Building Height Limitation _________ thick and _________ b. Building Height Limit below the surface of the ground. c. Building Height Restriction a. 250mm, 600mm d. Allowable Maximum Volume of Building b. 300mm, 600mm c. 200mm, 700mm d. 150mm, 650mm
5. If only one (1) RROW services a lot and such is
only 6.00 to 7.00 meters 9. Based on SECTION 708. Minimum Requirements for Group A Dwellings of Rule 7 NBC, All electrical installations shall 12. Identify the illustration: conform to the requirements of the: a. Philippine Electrical Engineer b. Professional Electrical Engineer c. Philippine Electrical Code d. Philippine Electric Code
10. Based on SECTION 708. Minimum Requirements
for Group A Dwellings of Rule 7 NBC, Mechanical systems and/or equipment installations shall be subject to the requirements of the: a. Philippine Mechanical Engineer b. Professional Mechanical Engineer c. Philippine Mechanical Engineer Code a. Inside Lot d. Philippine Mechanical Engineering Code b. Corner Through Lot c. Interior Lot 11. Identify the illustration: d. Through Lot
13. The size of an average automobile (car) parking
slot must be computed at ________ for perpendicular or diagonal parking. a. 3m x 5m b. 2.15m x 6m c. 2.50m x 5m d. 2.10m x 5m
14. It refers to the portion of the RROW reckoned
from the natural grade a. Rotunda line up to the finished surface of the b. Turn Court roadway/carriageway and/ or the c. Cul-de-sac sidewalk/arcade. d. Road Right of Way a. RROW ABOVE GRADE b. RROW AT GRADE c. RROW BELOW GRADE d. Road Right of Way Questions: b. Storage 1 c. Lobby 1. What is the lot dimension of the project? d. Business Center a. 24 x 99 m b. 53 x 105 m 7. Given that the slab at second floor is 0.12 c. 48 x 99 m meters thick, how many kilograms of steel d. 24 x 91 m reinforcing bars needed if it requires 15kgs of reinforcing bars per cubic meter of 2. If the building of this compound is defined concrete? as rectangle, what will be the building Exclude the area of stairwell of 3m x 6m. dimension a. 756 kgs of the project? b. 723.6 kgs a. 24 x 99 m c. 6,300 kgs b. 53 x 105 m d. 6,030 kgs c. 48 x 99 m d. 24 x 91 m 8. What is the Total Gross Floor Area of the project? 3. What is the range of Percentage of Site a. 2,484 sqm Occupancy of the project? b. 6,679 sq.m a. 50% c. 2,064 sq b. 40% d. 1,796 sq.m c. 37% d. 35% 9. What is the declared zoning classification of the site? 4. What is the range of the number of tiles to a. SPE be used in the Engineering Department b. UTS office c. GI using 600mm x 1200mm ceiling tiles? d. Division C a. 233 pcs b. 235 pcs 10. Base on National Structural Code of the c. 58 pcs Philippines 2015, Section 303 Foundation d. 250 pcs Investigation, how many boreholes are required to be performed and evaluated for 5. What is the percentage of USA in relation the with the lot? project? a. 20% a. 2 boreholes b. 30% c. 3 boreholes c. 15% b. 4 boreholes d. 25% d. 1 borehole only
6. What is the area/room aligned in ground
floor with the purchasing department office? a. Storage 2