Nickel Asia Diesel Fired Power Plant

Monthly Preventive Maintenance Servicing Checklist


Unit: _________________ Model:__________________ Serial No.__________________
Date PMS:_____________ RH:___________ Date Last PMS: __________ RH:____________
Check the following components, fixed any defect and replace if needed.
ITEM WORK TO BE DONE G D R REMARKS

1 Oil Filter Engine

2 Fuek Filter Engine

3 Injection Pump

4 Pump Priming

5 Radiator

6 Tension V-Belt

7 Tank Fuel

8 Suction Fuel Line

9 Exhaust Pipe

10 Air Filter

11 Oil Pan

12 Cap Fuel Tank

13 Cap Radiator Tank

14 Engine Mounting Bolt and Base

15 Fuel Line Injection Pump

16 Engine Water Pump

17 Cooling Fan
Other Activities:
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________

Legend:
G : Good D: Defective R: Replace

Performed By: ____________________ Noted By: ___________________________

Mechanics Mechanical Supervisor

Check By: _______________________


O & M Engineer

Approved By: Martiniano M. Montemor


Plant Resident Manager