REQUEST FOR INFORMATION
RFI Page : 1/1
Date : 2/8/2023
Ref. No : IDJV-RFI A076
Scope of work : ARCH

ISSUED ANSWER
From : To : Copy to : From : Deadline to Answer :
PT.HLI
HEIN Global Utama HG (한미 글로벌) HG (한미 글로벌) 2/11/2023
HAD
Approval : Approval :

This document is :
Question / Clarification Document/Drawing Submission Change in the work Yes
Minutes of Meeting Document/Drawing Review Comment Change of Employer’s Requirement Reply Required :
Other Site INSPECTION Corrective Action Request No

Subject :
Request for Confirmation on Battery Building Prayer Room Pipe

Attachment: - Pages (of Attachment) : -

Statement Reply STATUS :


[설계사]

Regarding vestibule area in the prayer room, there → 벽체 B TYPE로 설치 요망

are some pipes from 2nd floor that connected to


the faucets for water supply.

타일벽체 마감 상부 샌드위치
판넬위 급수배관 노출

타일벽체 마감면

[PMC] : B-Type 벽체로 석고보드 벽체 추가설치요.

Since the block wall height is only 1.780, the pipes 배터리동 기도실 전실(세족실) 벽체 상부 급수 배관 노출 확인
요청의 건 입니다
between the ceiling and top of the block wall 건축 및 설비도면 기준, 벽체 상부에 배관이 노출 설치되어
있습니다.
are exposed.
-THK50 샌드위치판넬위 급배수 배관 노출됨
(하부 타일구간은 매립)
*원도면과 동일한 디자인 적용 여부 최종 확인 요청 드립니다