Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1 2 3 4 5 6 7 8

KEY PLAN:

2+478
2+475

92.00

1+925
2+450

2+425

Gate
ency
2+400 Emerg

N
2+375

2+350

175.00
2+325

2+300

2+275

2+250

0+190
0+175
0+150
2+225

0+125
D

0+100
2+200

BP-5
C

0+075
-0+000
EXIT

0+050
0+025
C
2+175

A 2+150

2+125

2+100
A
2+075

0+167
0+150
0+125
0+100
0+075
2+050

2+025

2+000

0+167
1+975

0+150
0+125
D

0+100
1+950 Gate

D
ency

0+075
B
Emerg

0+050
B
1+925
B

0+025 ENTRY

0+05
1+900

0+000

1+875

1+850

1+825

0+162
0+150
D
D

0+125
1+800

0+100
EMR-3

0+000

0+075
C

0+025
1+775

0+050
C
EXIT

1+750

1+725

1+700

1+675

1+650

1+625

0
1+600

1+575 Emerg
ency

0+172
Gate

0+150
1+550

0+125
0+100
D

0+075
D
1+525
B

0+050
0+025 ENTRY
1+500

NOTES:

the vertical grade as per drawing


B 5.40% because differance between

0+
asphalt and gate 16.00 m at total

1+900
B length 293.00 m (access length ) B

02
5 ENTRY LEGEND:
PLAN
LUP

0+0 LANE EDGE


C 00 ASPHALT EDGE C

EDGE OF VERGE

1+875
TREE

PROFILE
NATURAL GROUND
DESIGN LEVEL

D D

0.00 26.26 26.26


0.00 26.21 26.21
0.00 23.32 23.32

0.00 27.51 27.51


0.00 23.09 23.09
0.00 23.93 23.93

0.00 27.18 27.18


0.00 21.40 21.40
E

N.G.L

REV/01 ISSUED FOR APPROVAL 29/05/2023 AGWA E


FINISH LEVEL ISSUE NO:
PURPOSE OF ISSUE:
DESCRIPTION DATE BY

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

CUT+ FILL
F PROFILE FOR ACCESS ROAD BP-05 (ENTRY ) F
BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

0.925 3.65 .50 1.00 1.00


1.00
.50

.50 3.65 .50 1.00 1.00 1.00


.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


HARD STRIP

HARD STRIP
HARD STRIP

HARD STRIP
VERGE
HARD STRIP

HARD STRIP
HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
CARRIAGEWAY
VERGE

VERGE

VERGE
VERGE
VERGE
EXISTING HIGHWAY 55

CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
PIVOT POINT PIVOT POINT 1.5% PIVOT POINT PIVOT POINT PIVOT POINT
PLAN / PROFILE / CROSS SECTION ( ENTRY )
1.5% PIVOT POINT
1.5% PIVOT POINT 1.5% 1.5%
1:1

BP-05 -SHEET-1 OF 5
4:1

PROTEZIONE
PROTEZIONE2

4:1
1:1

PROTEZIONE
PROTEZIONE2
1:1
1:1

1:1
4:1
4:1

1:1
4:1
4:1
4:1
1:1
1:1

1:1
PROJECT NAME :

Natural Ground Natural Ground


NGL NGL Natural Ground
NGL
NGL
NGL NGL Natural Ground Natural Ground NGL Logistic Facilities in the Connector
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
RC 2 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1 INITIAL SITE PREPARATION
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD NEOM
25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE KINGDOM SAUDI ARABIA
25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED H
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. REGION ASSET CODE CONTRACT CODE
LA-5
PROPOSED CROSS SECTION "B" 18 606000 1100001344
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115071 01

1 2 3 4 5 6 7 8
0
+00 1 2 3 4 5 6 7 8

-0 KEY PLAN:

2+478
2+475

2+450
92.00
2+425

Gate
ency
2+400 Emerg

N
2+375

2+350

175.00
2+325

2+300

2+275

2+250

0+190
0+175
0+150
2+225

0+125
D

0+100
2+200

BP-5
C

0+075
-0+000
EXIT

0+050
0+025
C
2+175

A 2+150

2+125

2+100
A
2+075

2+175
2+050

2+025

2+000

0+167
1+975

0+150
0+125
D

0+100
1+950 Gate

D
ency

0+075
Emerg

0+050
B
1+925
B

0+025 ENTRY

5
1+900

C
0+000

1+875

1+850

02
1+825

0+162
0+150
D
D

0+125
1+800

0+100
EMR-3

0+000

0+075
C

0+025
1+775

0+050
C
EXIT

1+750

0+
1+725

1+700

1+675

1+650

1+625

1+600

1+575 Emerg
ency

0+172
Gate

0+150
1+550

0+125
0+100
0+050

0+075
D
1+525
B

0+050
0+075
0+025 ENTRY

0+100
1+500

0+125

0+150

0+175
NOTES:

0+190
the vertical grade as per drawing
5.40% because differance between
asphalt and gate 16.00 m at total
B length 293.00 m (access length ) B
C

2+150
EXIT LEGEND:
PLAN
LUP
LANE EDGE
C ASPHALT EDGE C

EDGE OF VERGE
TREE

PROFILE
NATURAL GROUND
DESIGN LEVEL

D D

24.55
25.02

28.59
24.70

25.58

29.36
27.98
23.70

27.07
N.G.L
E
25.92

28.92
25.02

25.22

25.44

26.66

29.36
27.41

28.16
FINISH LEVEL E
REV/01 ISSUED FOR APPROVAL 29/05/2023 AGWA

ISSUE NO: DESCRIPTION DATE BY


PURPOSE OF ISSUE:
FOR APPROVAL

0.33
0.00

0.34

0.00
0.74
1.53

0.19
1.08
1.37

CUT+ FILL CLIENT: PROJECT MANAGEMENT CONSULTANT:

F
F
BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

0.925 3.65 .50 1.00 1.00


1.00
.50

.50 3.65 .50 1.00 1.00


1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


HARD STRIP

HARD STRIP
HARD STRIP

HARD STRIP
VERGE
HARD STRIP

HARD STRIP
HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
CARRIAGEWAY
VERGE

VERGE

VERGE
VERGE
VERGE
EXISTING HIGHWAY 55

CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
PIVOT POINT PIVOT POINT 1.5% PIVOT POINT PIVOT POINT PIVOT POINT
PLAN / PROFILE / CROSS SECTION ( exit )
1.5% PIVOT POINT
1.5% PIVOT POINT 1.5% 1.5%
1:1

BP-05 -SHEET-2 OF 5
4:1

PROTEZIONE
PROTEZIONE2

4:1
1:1

PROTEZIONE
PROTEZIONE2
1:1
1:1

1:1
4:1
4:1

1:1
4:1
4:1
4:1
1:1
1:1

1:1
PROJECT NAME :

Natural Ground Natural Ground


NGL NGL Natural Ground
NGL
NGL
NGL NGL Natural Ground Natural Ground NGL Logistic Facilities in the Connector
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
RC 2 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1 INITIAL SITE PREPARATION
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD NEOM
25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE KINGDOM SAUDI ARABIA
25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED H
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. REGION ASSET CODE CONTRACT CODE
LA-5
PROPOSED CROSS SECTION "B" 18 606000 1100001344
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115071 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

B
KEY PLAN:

C
N
5
02
0+
0+050
A A

3
EMS-
Emergency Gate
-3
BP-5

Emergency Gate
Emergency Gate

EMR
Emergency Gate
D 0+190 0+167 0+162 0+172
0+261

0+250
0+293

0+150 0+275
0+175 0+150
0+225

0+150

0+125 0+250
0+150 0+125
0+200

0+125

0+100 0+225
0+125 0+175
0+100
0+100

EXIT

EXIT

ENTRY
0+075

ENTRY
0+200
0+100 0+150
0+075
0+075

EXIT
0+050 0+175
0+075 0+125
0+050

C
0+050

C
B

ENTRY
B
C

B
0+025

0+025
D 0+150
0+050 0+100
D
0+025

0+000
0+000

1+800

1+775

1+750

1+725
1+825

1+700
1+850

1+675
1+875

1+650
D

1+625
175.00

1+900

1+600
1+925

1+575
1+950

1+550
1+975

1+525

0+000
2+000
D 0+125

1+500
2+025
0+025

1+475
0+075

2+050
D

1+450
2+075
D

1+425
2+100
D

C
1+400
92.00

2+125

C
1+375
2+150
-0+000

1+350
2+175

1+325
2+200

1+300

1+275
2+225
0+100

1+250
0+050

2+250
D

1+225
2+275

1+200
2+300
D

1+175
2+325

1+150

0+025
1+125
2+350

-0+000
1+100
2+375
2+400

1+075

1+050
0+075

2+425

1+025
2+450
D

1+000
2+475

0+975
2+478

0+950

410.
0+925

B
0+900

0+875

B
0+850

0+825
0+050

0+800

0+775

0+750

0+725
D

0+700

0+675

0+025

182.
0+650

0+625

0+600

00
-0+000

0+575

0+550

0+525

0+500
D

0+475

0+450

0+425

0+400

0+375

0+350

0+325

0+300

00
0+275

0+250

0+225

0+200

0+175

0+150

0+125

0+100

0+075

0+050

0+025

0+000
1+900
1+925
1+950
1+975
5

2+000
02 NOTES:
0+

2+025
2+050
2+075
D

2+100
B B

2+125
2+15 0
0 0
+0

2 +175
-0
2+200

LEGEND:
PLAN
LUP
LANE EDGE
C ASPHALT EDGE C

EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

D D

25.42
25.52

25.49

25.49

25.33

25.32

25.33

25.22
25.40

25.40
25.44

25.28
25.36

25.30
25.47
25.57

25.12
25.19

25.10
N.G.L REV/01 ISSUED FOR APPROVAL 29/05/2023 AGWA E
ISSUE NO: DESCRIPTION DATE BY
25.42
25.52

25.49

25.49

25.33

25.32

25.33

25.22
25.44

25.40

25.40

25.30

25.28
25.47

25.36
25.57

25.12
25.19

25.10
PURPOSE OF ISSUE:
FINISH LEVEL FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
CUT+ FILL

F
F
PROFILE FOR INTERSECTION ACCESS ROAD WITH MAIN ROAD BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

0.925 3.65 .50 1.00 1.00


1.00
.50

.50 3.65 .50 1.00 1.00


1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


HARD STRIP

HARD STRIP
HARD STRIP

HARD STRIP
VERGE
HARD STRIP

HARD STRIP
HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
CARRIAGEWAY
VERGE

VERGE

VERGE
VERGE
VERGE
EXISTING HIGHWAY 55

CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
PLAN / PROFILE / CROSS SECTION ( INTERSECTION )
1.5% PIVOT POINT PIVOT POINT
PIVOT POINT
PIVOT POINT
1.5% PIVOT POINT PIVOT POINT
1.5% 1.5%
PIVOT POINT
1.5%
1:1

BP-05 -SHEET-3 OF 5
4:1

PROTEZIONE
PROTEZIONE2

4:1
1:1

PROTEZIONE
PROTEZIONE2
1:1
1:1

1:1
4:1
4:1

1:1
4:1
4:1
4:1
1:1
1:1

1:1
PROJECT NAME :

Natural Ground Natural Ground


NGL NGL Natural Ground
NGL
NGL
NGL NGL Natural Ground Natural Ground NGL Logistic Facilities in the Connector
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
RC 2 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1 INITIAL SITE PREPARATION
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD NEOM
25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE KINGDOM SAUDI ARABIA
25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED H
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. REGION ASSET CODE CONTRACT CODE
LA-5
PROPOSED CROSS SECTION "B" 18 606000 1100001344
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115071 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY PLAN:

175.00 N 5
02
0+ A

-3
Emergency Gate

EMS
-3
BP-5

Emergency Gate
Emergency Gate

EMR
Emergency Gate
D 0+190

0+175
0+167

0+150
0+162

0+150

0+125
0+172

0+150
0+261

0+250

0+225
0+293

0+275

92.00
0+250
0+150 0+200
0+125

0+125

0+100 0+225
0+125 0+175
0+100

0+100

EXIT

EXIT

ENTRY
0+075

ENTRY
0+200
0+100 0+150
0+075

0+075

EXIT
0+050 0+175
0+075 0+125
0+050

C
B
0+050

C
B

ENTRY
B
C

B
0+025
D 0+150
0+050
0+025 0+100
D
0+025

0+000
0+000

1+775

1+750
1+800

1+725

1+700
1+825

1+675
1+850

1+650
1+875

1+625
D

175.00

1+900

1+600
1+925

1+575
1+950

1+550
1+975

1+525

0+000
2+000
D 0+125

1+500
2+025
0+025 0+075

1+475
2+050
D

1+450
2+075
D

1+425
2+100
D

C
1+400
92.00

2+125

C
1+375
2+150
-0+000

1+350
2+175

1+325
2+200

1+300

1+275
2+225
0+100

1+250
0+050

2+250
D

1+225
2+275

1+200
2+300
D

1+175
2+325

1+150

0+025
1+125
2+350

-0+000
1+100
2+375

1+075
2+400

1+050
2+425
0+075

1+025
2+450
D

1+000
2+475

0+975
2+478

410
0+950

0+925

B
0+900

0+875

B
00

0+850

0+825
0+050

0+800

0+775

0+750

0+725
D

0+700

0+675

0+025

.00

182
0+650

0+625

0+600

-0+000

0+575

0+550

0+525

0+500
D

0+475

0+450

0+425

0+400

0+375

.00
0+350

0+325

0+300

0+275

0+250

0+225

0+200

0+175

0+150

0+125

0+100

0+075

0+050

0+025

0+000
+0

2+175
-0
2+200
2+225
2+250
2+275
LEGEND:

2+300
D
PLAN

2+325
B B

2+350
LUP

2+375
LANE EDGE

2+400
ASPHALT EDGE

2+425
2+450 EDGE OF VERGE
2+475
2+478

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

24.32 24.32
24.39 24.39
24.60 24.60

24.48 24.48
24.53 24.53
24.92

24.85 24.85

24.71
25.22

25.02

24.94

24.90
25.28
25.28

25.12
25.19

25.10

E N.G.L

24.71
24.92
25.22

25.02

24.94

24.90
25.28
25.28

25.12
25.19

25.10

FINISH LEVEL
REV/02 ISSUED FOR APPROVAL 29/05/2023 AGWA

REV/01 ISSUED FOR APPROVAL 29/01/2023 AGWA E

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
CUT+ FILL ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:
FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:
PROFILE FOR INTERSECTION ACCESS ROAD WITH MAIN ROAD

F F
BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

0.925 3.65 .50 1.00 1.00


1.00
.50

.50 3.65 .50 1.00 1.00


1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


HARD STRIP

HARD STRIP
HARD STRIP

HARD STRIP
VERGE
HARD STRIP

HARD STRIP
HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
CARRIAGEWAY
VERGE

VERGE

VERGE
VERGE
VERGE
EXISTING HIGHWAY 55

CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
PLAN / PROFILE / CROSS SECTION ( INTERSECTION )
1.5% PIVOT POINT PIVOT POINT
PIVOT POINT
PIVOT POINT
1.5% PIVOT POINT PIVOT POINT
1.5% 1.5%
PIVOT POINT
1.5% 4:1
1:1

4:1
PROTEZIONE
PROTEZIONE2

BP-05 -SHEET-4 OF 5
1:1

PROTEZIONE
PROTEZIONE2
1:1
1:1

1:1
4:1
4:1

1:1
4:1
4:1
4:1
1:1
1:1

1:1
PROJECT NAME :

Natural Ground Natural Ground


NGL NGL Natural Ground
NGL
NGL
NGL NGL Natural Ground Natural Ground NGL Logistic Facilities in the Connector
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
RC 2 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1 INITIAL SITE PREPARATION
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD NEOM
25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE KINGDOM SAUDI ARABIA
25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED H
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. REGION ASSET CODE CONTRACT CODE
PROPOSED CROSS SECTION "B" 18 606000 1100001344
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115071 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2+478
2+475

2+450
92.00
KEY PLAN: 2+425

2+400

2+375
Emergen
cy Gate

2+350

175.00
2+325

2+300

2+275

2+250

0+190
0+175
0+150
2+225

0+125
D

0+100
2+200

BP-5
C

0+075
-0+000
EXIT

0+050
0+025
C
2+175

2+150

N
2+125

2+100

2+075

2+050

2+025

2+000

0+167
1+975

0+150
0+125
D

0+100
1+950
cy Gate

0+075
Emergen

0+050
B
1+925

B
0+025 ENTRY
1+900

0+000

1+875

A A
1+850

1+825

0+162
0+150
D
D

0+125
1+800

0+100
EMR-3

0+000
FINISH LEVEL

0+075
C

0+025
1+775

0+050
C
EXIT

5
CUT+ FILL
1+750

1+725

1+700

1+675

1+650

1+625

1+600

1+575 Emergen

Emergency Gate
cy Gate

0+172
0+150
1+550

0+125
0+100
D

0+075
D
1+525
B

0+050
0+025
ENTRY
1+500
B

0+000
1+475

1+450

Emergency Gate
1+425

1+400

1+375

1+350

1+325

BP-
1+300

1+275

y Gate
1+250 Emergenc

1+225

1+200

1+175

1+150

0+261
1+125

0+250
0+225
D

0+200
D
-0+000

0+175
1+100

0+150
0+125
0+025

0+100
C
1+075
EXIT

0+050

0+075
C

1+050

1+025

1+000

0+975

0+950
EMS-3
0+925

0+900

0+875

0+850

0+825

0+800

0+775

0+750

0+725

LEGEND:
PLAN
B B
LUP
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

0+190 0+167

0+175
0+150

D D

0+150
0+125

0+125
0+100

EXIT

ENTRY
0+100
0+075

0+075 0
E 0+05

C
B

B
5
02

C
0+
5
02 D
0+
0+050
D REV/02 ISSUED FOR APPROVAL 29/05/2023 AGWA
AGWA E

00
REV/01 ISSUED FOR APPROVAL 29/01/2023

0+0
00

1+775
1+800
1+825
0+0
DESCRIPTION DATE BY

1+850
ISSUE NO:

1+875
175.00

1+900
1+925
1+950
PURPOSE OF ISSUE:

1+975
5

2+000
02
0+ D
FOR APPROVAL

2+025
2+050
2+075
D

2+100
D
CLIENT: PROJECT MANAGEMENT CONSULTANT:

92.00 2+125
2+150
00
+0

2+175
-0
2+200
2+225
2+250
2+275
2+300

F
D
2+325

F
2+350
2+375

BECHTEL ENGINEERING COMPANY


2+400
2+425

DESIGN CONSULTANT: CONTRACTOR:


2+450
2+475
2+478

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
General Plan

EMR-03 -SHEET-5 OF 5
PROJECT NAME :
Logistic Facilities in the Connector
(CH 00+000 to CH 75+000)
Work Order No .1100001344/015
INITIAL SITE PREPARATION
NEOM
KINGDOM SAUDI ARABIA
H REGION ASSET CODE CONTRACT CODE H
18 606000 1100001344
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115071 01

1 2 3 4 5 6 7 8

You might also like