Profile For Exit Access Road at EMR-01

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 0+125 7 8

B
B
KEY PLAN:

N
0+075
0+100

A A

0+050
206.00 A 0+075
5+825

5+800

5
5+775 02
0+ 50
0+0

5+ 7 50

5+725
A A

5+700

0
00
5+675

0+0

5
5+65

5+625

02
5+600

0+
5+575

5+550

5+100000
00
LEGEND:

5+525

5+500

5+475

5+450

0+0

-0+
5+425

5+400

5+125
A PLAN

5+150
5+375

5+200
5+350

5+175
5+225
5+325

5+300
B B

5+250
5+275
LUP
LANE EDGE
ASPHALT EDGE
A A
EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D
5+000.00

5+025.00

5+050.00

5+075.00

5+100.00

5+125.00

5+150.00

5+175.00

5+200.00

5+225.00

5+250.00

5+275.00

5+300.00

5+325.00

5+350.00

5+375.00

5+400.00

5+425.00

5+450.00

5+475.00

5+500.00
38.19
39.90

39.77

39.62

39.50

39.32

39.15

38.95

38.77

38.61

38.50

38.35

37.90

37.62

37.50
39.34

39.08

38.84

38.06

37.86

37.78
38.50
39.08

38.06
39.90

39.50

38.84

38.35
38.95

37.90
39.34

37.50
37.86
39.32
39.62

38.19
38.61

37.78
39.15

38.77

37.62
39.77

E
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Profile for Exit
Profile Accesswith
for intersection Road at55EMR-01
highway
REV/02

REV/01

ISSUE NO:
ISSUED FOR APPROVAL

ISSUED FOR APPROVAL

DESCRIPTION
21-05-2023

28/01/2023

DATE
M.AGWA

SYED

BY
E

PURPOSE OF ISSUE:

3.65 .50 1.00 FOR APPROVAL


1.00
1.00
.50

.50 3.65

3.65 .50 1.00


3.65
.50 17.50

CARRIAGEWAY 0.82 3.65 .50 1.00


HARD STRIP

SHOULDER

HARD STRIP CLIENT: PROJECT MANAGEMENT CONSULTANT:


HARD STRIP

HARD STRIP
CARRIAGEWAY CARRIAGEWAY
CARRIAGEWAY

HARD STRIP
VERGE

VERGE

VERGE
EXISTING HIGHWAY 55
F
F
BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN 21-05-2023 M.AGWA

PIVOT POINT CHECKED 21-05-2023 M.AGWA CHECKED


PIVOT POINT 1.5% 1.5% PIVOT POINT
1.5% 1.5% PIVOT POINT APPROVED 21-05-2023 M.AGWA APPROVED
4:1 PIVOT POINT PROTEZIONE2
PROTEZIONE
1:1

PROTEZIONE2
PROTEZIONE
1:1

1:1
4:1 4:1
4:
1:1

1
1:1

1:1
G 4:1 SCALE NTS SHEET SIZE A0 G
NGL Natural Ground
NGL Natural Ground
Natural Ground
NGL DISCIPLINE NAME:

RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE NGL


NGL
CIVIL
10.00CM THICK ASPHALT CONCRETE BASE COURSE Natural Ground
ROADS PROFILES
RC 2 RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE BP-03- SHEET- 3OF 3
30.00CM THICK AGGREGATE ROAD BASE COURSE RC 2 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE PROJECT NAME :
TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1 MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE Logistic Facilities in the Connector
CBR≥80% @ 100% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD
(CH 00+000 to CH 75+000)
25.00 CM SUB BASE - FORMATION SURFACE Work Order No .1100001344/015
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
INITIAL SITE PREPARATION
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
PROPOSED CROSS SECTION "C" PROPOSED CROSS SECTION "B" PROPOSED CROSS SECTION "A" NEOM
KINGDOM SAUDI ARABIA
H
Typical CROSS SECTION REGION
18
ASSET CODE
606000
DRAWING NUMBER
CONTRACT CODE
1100001344
H

ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115024 02

1 2 3 4 5 6 7 8