Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8

KEY PLAN:

0+075

N
A A

6+125
6

6+100
182.50

6+075
0+050

6+050

6+025

6+000
A
206.00

5+975

5+950

5+925
5
02

5+900
0+

5+875

5+850

5+825

5+800

5+775

00
5+750

5+725

5+700

+0
5+675

5+6050

5+625

5+600
LEGEND:

5+575
PLAN
B B
LUP
LANE EDGE
A
ASPHALT EDGE
EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

6+125.65
6+000.00

6+025.00

6+050.00

6+075.00

6+100.00

6+125.00
5+500.00

5+525.00

5+550.00

5+575.00

5+600.00

5+625.00

5+650.00

5+675.00

5+700.00

5+725.00

5+750.00

5+775.00

5+800.00

5+825.00

5+850.00

5+875.00

5+900.00

5+925.00

5+950.00

5+975.00
37.42

37.27

37.01

36.62

36.49

36.33

36.11

36.12

36.03

35.91

35.77

35.22

35.21

34.91

35.12

35.11
37.50

36.90

36.70

35.66

35.58

35.45

34.86

35.10
37.14

35.24
36.90

36.03

34.86
36.33

35.58
36.49
36.70
37.50

35.66

35.45

35.10
36.62

35.24
37.42

35.22

34.91
37.01

35.91

35.77
36.12

35.12
35.21
37.14
37.27

36.11

35.11
E
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Profile
Profilefor Exit Access
for intersection Road
with highway 55 at EMR-01
REV/02

REV/01

ISSUE NO:
ISSUED FOR APPROVAL

ISSUED FOR APPROVAL

DESCRIPTION
21-05-2023

28/01/2023

DATE
M.AGWA

SYED

BY
E

PURPOSE OF ISSUE:

3.65 .50 1.00 FOR APPROVAL


1.00
1.00
.50

.50 3.65

3.65 .50 1.00


3.65
.50 17.50

CARRIAGEWAY 0.82 3.65 .50 1.00


HARD STRIP

SHOULDER

HARD STRIP CLIENT: PROJECT MANAGEMENT CONSULTANT:


HARD STRIP

HARD STRIP
CARRIAGEWAY CARRIAGEWAY
CARRIAGEWAY

HARD STRIP
VERGE

VERGE

VERGE
EXISTING HIGHWAY 55
F
F
BECHTEL ENGINEERING COMPANY
DESIGN CONSULTANT: CONTRACTOR:

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN 21-05-2023 M.AGWA

PIVOT POINT CHECKED 21-05-2023 M.AGWA CHECKED


PIVOT POINT 1.5% 1.5% PIVOT POINT
1.5% 1.5% PIVOT POINT APPROVED 21-05-2023 M.AGWA APPROVED
4:1 PIVOT POINT PROTEZIONE2
PROTEZIONE
1:1

PROTEZIONE2
PROTEZIONE
1:1

1:1
4:1 4:1
4:
1:1

1
1:1

1:1
G 4:1 SCALE NTS SHEET SIZE A0 G
NGL Natural Ground
NGL Natural Ground
Natural Ground
NGL DISCIPLINE NAME:

RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE NGL


NGL
CIVIL
10.00CM THICK ASPHALT CONCRETE BASE COURSE Natural Ground
ROADS PROFILES
RC 2 RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE BP-03- SHEET- 4 OF 4
30.00CM THICK AGGREGATE ROAD BASE COURSE RC 2 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE PROJECT NAME :
TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1 MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE Logistic Facilities in the Connector
CBR≥80% @ 100% COMPACTION WITH MDD TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD
(CH 00+000 to CH 75+000)
25.00 CM SUB BASE - FORMATION SURFACE Work Order No .1100001344/015
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
INITIAL SITE PREPARATION
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
PROPOSED CROSS SECTION "C" PROPOSED CROSS SECTION "B" PROPOSED CROSS SECTION "A" NEOM
KINGDOM SAUDI ARABIA
H
Typical CROSS SECTION REGION
18
ASSET CODE
606000
DRAWING NUMBER
CONTRACT CODE
1100001344
H

ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115024 02

1 2 3 4 5 6 7 8

You might also like