The Client The Consultant

The Contractor

Tel-971-4-3423342
Fax-971-4-2737268

Project GEMS Founders School (Phase 2)


Location Al Mizhar
Client GEMS
Consultant Al Burj Engineering Consultants
Main Contractor Pepco Engineering Company L.L.C

Document No: Rev.00 Date:


Title Method statement for Lifting operation

Civil Contractor
Approved by: Project
Prepared by: QA/QC Reviewed by: Site Engineer
Manager
CONTENTS
Objective
The Method Statement for Lifting Activity ensures that lifting, moving, and shifting
materials at the project site are covered by a Safe System of Work. This is the best way to
demonstrate that the risk associated has been carefully considered and appropriate
controls have been implemented.

Scope
The acts of “Lifting, Moving, and Shifting Material at Sites” fall under the scope of this
method of statement. This method of the statement shall comply with the local
authority’s regulations.

Responsibilities

The person ultimately responsible for the works’ process implementation is the project
manager, site engineer, or foreman. The Project Manager, Site Engineer, & Foreman will
be accountable for all construction and MEP operations at the job site and will personally
oversee and monitor the activity at the site through an erection supervisor and skilled
workers.

All project activities will be subject to inspection and testing, which will be organized and
overseen by the worksite engineer. Additionally, it is the duty of every employee
assigned to a particular task within the project to use extreme caution to ensure both
their own safety and the safety of their coworker

Health and Safety Risks

Before beginning any work, the team must verify that all involved workers are aware of
the manufacturer’s, client’s, and consultant’s health and safety requirements for
handling and using the materials.

Below are the general safety recommendations:

Make sure the workspace is tidy and safe.