I. Project Overview
II. Project Features
2.1. Main Alignment
2.2. Typical Road Cross Sections
III. Technical Discussion
3.1. Geotechnical Investigation
3.2. Soft Soil Treatment Design
3.3. Seismic Design
IV. Conclusion
CTI Engineering International Co., Ltd. In association with
Joint venture with Chodai Co., Ltd.
Oriental Consultants Global Co., Ltd.
Nippon Engineering Consultants Co., Ltd. 2
LAGUNA LAKESHORE ROAD NETWORK (LLRN) PROJECT
Development Outline Masterplan for the Laguna Lakeshore High Standard Highway
Network Development
Masterplan
Proposed Overall High Standard Highway Network from JICA Master Plan 2021 1. LLRN Project Phase 1 is
considered in the JICA-Study
HSH Master Plan (2021) and
ADB-funded Development
Outline Master Plan (2020)
2. The Project increases Road
Transport Resiliency to Metro
Manila and neighboring
Regions
3. The LLRN Project supports
the integrated spatial
development concepts for
Greater Capital Region
4. The project supports
planned developments
introduced by various LGUs
CTI Engineering International Co., Ltd. In association with
Joint venture with Chodai Co., Ltd.
Oriental Consultants Global Co., Ltd.
Sources: JICA Study on High Standard
Nippon Engineering Consultants Co., Ltd. Highway Network Development 7
LAGUNA LAKESHORE ROAD NETWORK (LLRN) PROJECT
Project Objectives
The LLRN Project is primarily intended to provide a safer and faster alternative to
motorists traveling from north to south and vice versa, with the end-goal of vitalizing
the economies of the surrounding areas including Laguna, Rizal, Cavite and Batangas,
by providing the following:
• A resilient, reliable transportation network for commuters and residents;
• Faster journey travel times;
• Ease of access to tourism destinations and activities; and
• Enhanced internal circulation, mobility and external linkages to support the growth
potential of the region and its surrounding areas.
Project Features
Phase I
(Western Side)
Phase II
(Eastern Side)
Main Alignment
Embankment Viaduct/Bridge
Contract Package
Length (km) Length (km)
1 Lower Bicutan to Alabang 1.1 6.8
2 Alabang to San Pedro/Binan 1.2 6.5
3 San Pedro/Binan to Cabuyao 7.4 4.7
4 Cabuyao to Calamba 6.2 3.5
Subtotal 15.9 21.5
Total 37.4km
Countermeasure Schemes
Countermeasure for General Road Section
Countermeasure Schemes
Countermeasure against Consolidation Settlement
For relatively deep weak strata (thickness: 5-10m) Against deep weak strata (thickness: 15-16m)
Prefabricated Vertical Drain (PVD) Method Column type deep mixing Method
with Geotextile Reinforcement
CTI Engineering International Co., Ltd. In association with
Joint venture with Chodai Co., Ltd.
Oriental Consultants Global Co., Ltd.
Nippon Engineering Consultants Co., Ltd. 22
LAGUNA LAKESHORE ROAD NETWORK (LLRN) PROJECT
Countermeasure Schemes
Countermeasure against Liquefaction
Against relatively deep liquefiable layers Against deep and severely liquefiable layers
(thickness: up to 10m, PL-value<20.0) (thickness: over 10m, PL-value>20.0)
Deformation Control Method Grid Type Deep-Mixing Method
Reference: DPWH-BSDS 2018 Interim Revisions (Sucat Road Segment referenced above)
CTI Engineering International Co., Ltd. In association with
Joint venture with Chodai Co., Ltd.
Oriental Consultants Global Co., Ltd.
Nippon Engineering Consultants Co., Ltd. 25
LAGUNA LAKESHORE ROAD NETWORK (LLRN) PROJECT
Conclusion
The Detailed Engineering Design (DED) for Phase I of the Laguna Lakeshore Road
Network Project is currently ongoing and is now in its final stages. When realized, it
is expected to provide a safe, reliable and resilient transport network for the benefit
of residents and commuters traversing the National Capital Region and Region IV-A.
In this regard, several methods were studied to ensure that the LLRN Project will be
able to withstand the most pressing risks and hazards identified in the project
location. Highlighted in this presentation is a comprehensive soft soil treatment
design to prevent consolidation settlement and liquefaction in its embankment
section and a responsive seismic design for its viaduct section that can withstand
major earthquakes.