Professional Documents
Culture Documents
AMG001-S1-DS-SF-001 - Datasheet For Safety and Fire Fighting Equipment Kerendan Facility - Rev. 0
AMG001-S1-DS-SF-001 - Datasheet For Safety and Fire Fighting Equipment Kerendan Facility - Rev. 0
AMG001-S1-DS-SF-001 - Datasheet For Safety and Fire Fighting Equipment Kerendan Facility - Rev. 0
AMG001-S1-DS-SF-001
COMPANY
CONTRACTOR
TABLE OF CONTENT
1 INTRODUCTION
1.1 OVERVIEW
Kerendan Gas Plant Facility (KGPF) in Bangkanai Block produce condensate with production 300 - 600
bbls/d. Bangkanai Block located onshore far North of Banjarmasin city, upstream Barito River, Central
Kalimantan.
Lifting point at Kerendan Gas Plant Facility (KGPF) located 55 km away from Muara Bakah Refinery (MBR)
Plant Area of Barito River and roughly 470 km distance from mouth of Barito River (near Banjar Masin).
PT.Mirah Ganal Energi (MGE) has get approval from OPHIR / MEDCO to be Condensate Off-taker from
KGPF.
Project is divided into 2 (two) Phase scope of work. Phase 1 is from condensate metering on Kerendan Gas
Plant Facilities (KGPF) to Muara Bakah Oil Refinery Area. Work scope is started from outlet existing
Condensate Metering in KGPF until condensate Off-taking Facilities such as Condensate Tank (T-100 A/B),
Metering and Loading Unit on Jetty in Muara Bakah Oil Refinery. And Phase 2 is Muara Bakah Refinery
Plant. Work scope is started from downstream of Condensate Tank (T-100 A/B) to Main Oil Refinery Plant
include utilities and auxiliary.
1.2 OBJECTIVES
The objective of this document is to provide detail data and requirement for safety and fire fighting
equipment in Kerendan Facility.
2 REFERENCES
In the case of any conflict in the requirements specified in the documents attached to the inquiry/order, the
most stringent of the specified requirements shall govern. CONTRACTOR’s interpretation in this regard
shall be final and binding on the VENDOR.
VENDOR/CONTRACTOR shall submit the discrepancy immediately to COMPANY for final resolution.
The following is the order of precedence of the documents accompanying the inquiry/order:
1. Data Sheets
2. P&ID’s and drawings
3. Project Specification
4. Applicable Codes and Standards
Regulation of the Minister of Manpower and Requirements for the Installation and Maintenance of Portable Fire
Transmigration (PER.04/MEN/1980) Extinguisher
Regulation of the Minister of Manpower and First Aid at Workplace
Transmigration (PER-15/MEN/VIII/2008)
API 2021, 4th Edition, 2001 Fighting Fires in and around Flammable and Combustible Liquid Atmospheric
Storage Tanks
API RP 2030, 4th Edition, 2014 Application of Fixed Water Spray Systems for Fire Protection in the Petroleum and
Petrochemical Industries
ANSI Z358.1, 2014 Edition Standard for Emergency Eyewash and Shower Equipment
NFPA 11, 2016 Edition Standard for Low-, Medium-, and High-Expansion Foam
NFPA 15, 2012 Edition Standard for Water Spray Fixed Systems for Fire Protection
NFPA 17, 2017 Edition Standard for Dry Chemical Extinguishing System
NFPA 20, 2019 Edition Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 22, 2017 Edition Standard for Water Tanks for Private Fire Protection
NFPA 24, 2016 Edition Standard for the Installation of Private Fire Service Mains and Their
Appurtenances
NFPA 30, 2015 Edition Flammable and Combustible Liquids Code
3 ABBREVIATIONS
AFFF : Aqueous Foam Filming Fluoroprotein
ANSI : American National Standard Institute
API : American Petroleum Institute
EPDM : Ethylene Propylene Diene Monomer
EPC : Engineering, Procurement, and Construction
FF : Flat Face
FH : Fire Hydrant
FM : Factory Mutual
KGPF : Kerendan Gas Plant Facility
MBR : Muara Bakah Refinery
MGE : Mirah Ganal Energi
NFPA : National Fire Protection Association
NPT : Nominal Pipe Thread
OD : Outside Diameter
P&ID : Piping and Instrumentation Diagram
UFD : Utility Flow Diagram
UL : Underwriters Laboratories
VTA : Vendor to Advise
4 DATASHEET
Datasheet for safety and fire fighting equipment in Kerendan Facility refer to Appendix 1.
4 Wet Barrel
Type
5 2-way (Two x 2-1/2" hose connection)
6 OPERATING CONDITIONS
10 Fluid Temperature Operating : 86 °F (30 °C) Max. : 104 °F (40 °C) Design : 140 °F (60 °C)
11 Fluid pressure Min. : 100 psig Max. : 175 psig Design : 205 psig
13 DESIGN FEATURES
20 ACCESSORIES
38 NOTES
39 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
40 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
44 6.) Refer to Specification for Surface Preparation and Coating (Doc. No. AMG001-S1-SPC-ME-009).
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
9 Dimension To be enough to contain the equipments described below (see "Item Stored").
10 Type Leg Supported Wall Mounted
11 Cabinet Material Carbon Steel (Min. Thickness: 1.5 mm)
12 Door Single door type with handle and metal hinges
13 Legs Min. 200 mm
14 Material Carbon Steel
(Note 3)
15 Item Stored Specification Quantity Materials
16 Ø 2-1/2 inch x 100 ft fire hose
Completed with 2-1/2 inch storz coupling Hose: Oil and abrasive
17
(female connection at one end and male resistance, sinkable, synthetic
18 connection at other end) rubber extruded through woven
Fire Hose 2 rolls
19 Racks or Shelves Press. (Design/Op.) : 205 psig / 100 psig jacket
37 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
38 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
39 3.) Material shall be suitable for brackish water.
40 4.) Hydrostatic test pressure: 1.5 x Working Pressure for fire hose
41 5.) Refer to Specification for Surface Preparation and Coating (Doc. No. AMG001-S1-SPC-ME-009).
42 6.) The letter both in English and Indonesian shall be written in front of the door.
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 Note : This reference drawing is for illustration only.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 1 EA (Note 2)
4 OPERATING CONDITIONS
8 Fluid Temperature Operating : 86 °F (30 °C) Max. : 104 °F (40 °C) Design : 140 °F (60 °C)
9 Fluid pressure Min. : 100 psig Max. : 175 psig Design : 205 psig
10 DESIGN FEATURES
16 Dimension VTA
17 ACCESSORIES
18 Pick-up tube Red Vinyl Cover (Note 4) Rubber Wheel and Handle
19 MATERIALS (Note 3)
20 Tank Stainless Steel
32 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
33 2.) Refer to Safety and Fire Fighting Equipment Layout Muara Bakah Facility (Doc. No. AMG001-D2-LAY-SF-004).
35 4.) Weather proof red vinyl cover marked with "FOAM UNIT" and "BUSA PEMADAM API" letter in white, both in English and Indonesian.
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 FOAM INDUCTOR
4 HANDLEBAR
5
8
9
10 FOAM TANK
11
12
13
14
CART SUPPORT
CART WHEEL
15
16 FRONT VIEW
SIDE VIEW
17
18
19 Note : This reference drawing is for illustration only.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 3 EA (Note 2)
5 OPERATING CONDITIONS
6 Class A B C D K
10 Water Foam
13 Carbon Dioxide
25 ACCESSORIES
29 MATERIALS
39 NOTES
40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
4
DISCHARGE LEVER
5
DISCHARGE LOCKING PIN AND SEAL CARRYING HANDLE
6
7 DISCHARGE HOSE
8
9
DATA PLATE
10
11
12
15
16
17
18
19 Note : This reference drawing is for illustration only.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
6 Class A B C D K
7 Ambient Temperature 86 °F (30 °C)
10 Water Foam
11 Potassioum Bicarbonate Sodium Bicarbonate
Extinguishing Agent
12 Ammonium Phosphate Potassium Chloride
13 Carbon Dioxide
14 Operation Method Self Expellent Stored Pressure Cartridge
15 Agent Weight 20 lb (9 kg)
16 Rating Min. 20-A; 80-B:C (UL Rating)
17 Working Pressure 160 psig (VTA)
18 Test Pressure 348 psig (VTA)
19 Effective Range 15 ft (4.6 m) (VTA)
20 Discharge Time 15 seconds (VTA)
21 Handle Type Non-slip
22 Hose Length VTA
23 Dimension 9-1/2 inch (OD) x 22-1/2 inch (H) (VTA)
24 Installation Method Bracket Cabinet Pan & Stand
25 ACCESSORIES
40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
42 3.) Metal brackets (wall hanger type of bracket).
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
1 REFERENCE DRAWING (20 LB HANDHELD ABC DRY CHEMICAL POWDER FIRE EXTINGUISHER)
2
3 DISCHARGE LEVER
6
7 DISCHARGE HOSE
8 DATA PLATE
9
10
11
12
13 BODY (SHELL)
14
DISCHARGE NOZZLE
15
16
17
18
19 Note : This reference drawing is for illustration only.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 3 EA (Note 2)
5 OPERATING CONDITIONS
6 Class A B C D K
10 Water Foam
13 Carbon Dioxide
25 ACCESSORIES
39 NOTES
40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
1 REFERENCE DRAWING (20 LB HANDHELD ABC DRY CHEMICAL POWDER FIRE EXTINGUISHER)
8
DATA PLATE
9
10
DISCHARGE HOSE
11
12
13
BODY (SHELL)
14 DISCHARGE NOZZLE
15
16
17
18
19 Note : This reference drawing is for illustration only.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 1 EA (Note 2)
5 OPERATING CONDITIONS
6 Class A B C D K
10 Water Foam
13 Carbon Dioxide
25 ACCESSORIES
39 NOTES
40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
5
HANDLEBAR
6
N2 CARTRIDGE
7
11
DATA PLATE
12
WHEEL
13
14
15 BODY (SHELL)
16
17
18
19 Note : This reference drawing is for illustration only.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 1 EA (Note 2)
4 DESIGN FEATURES
6 Dimension VTA
11 Storage Provided
13 NOTES
14 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
15 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
16
18
19
20
STRETCHER BASE
21
RESTRAINT STRAP
22
CARRYING HANDLES
23
24
FRAME
25
26
27
STRETCHER SUPPORT
28
29
30
31
32
33
34 STORAGE
35
36
37
38
39
40 Note : This reference drawing is for illustration only.
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 1 EA (Note 2)
4 DESIGN FEATURES
9 SPECIFICATION
10 Refer to Peraturan Menteri Tenaga Kerja dan Transmigrasi Republik Indonesia No. 15/2008, each kit (A-type) shall include the following but not limited to:
11
14 2. Bandage (5 cm width) 2
17 5. Adhesive plaster 10
19 7. Triangular bandages 2
20 8. Scissor 1
21 9. Safety pin 12
23 11. Mask 2
24 12. Tweezer 1
25 13. Flashlight 1
34
35 NOTES
36 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
37 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
38
40
41
42
43
44
45
46
47
48
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 1 EA (Note 2)
4 OPERATING CONDITIONS
8 DESIGN FEATURES
9 Type Self-contained
10 Dimension VTA
15 ACCESSORIES
17 NOTES
18 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
19 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
21
23
24
25
26
27
DUST COVER
28
WATER STORAGE
29
30
31
32
33
34
35
36
37
38
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY
3 Quantity 1 EA (Note 2)
4 WINDSOCK SPECIFICATION
5 Type Unlighted
10 SUPPORTING STRUCTURE
14 FRAMEWORK
15 Diameter 18 inch
18 NOTES
19 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
20 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
21
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
47
48
49
50