DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR

MUARA BAKAH REFINERY EPC PROJECT

DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT


KERENDAN FACILITY

AMG001-S1-DS-SF-001

COMPANY

PT MIRAH GANAL ENERGI

CONTRACTOR

PT REKA PATRIA EKAGUNA

Job No.: AMG.001 Contract No. : 001/MBR/DED/VI/2020

Rev. Date Description Originated Checked Approved Client

A 28 Aug 2020 Issued for Review SAM ABR IDA

B 21 Sep 2020 Issued for Approval SAM ABR IDA

0 08 Oct 2020 Issued for Construction SAM ABR IDA


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES
FOR MUARA BAKAH REFINERY EPC PROJECT
Datasheet for Safety and Fire Fighting Equipment Kerendan Facility

REVISION LOG REGISTER

Revisions has been performed on the following pages:

No Page Date Revised


1. All 28 Aug 2020 Issued for Review
2. All 21 Sep 2020 Add Introduction, Objectives, References, and Abbreviations.
3. App.1 21 Sep 2020 Add reference drawing for all safety and fire fighting equipment.
4. App.1 21 Sep 2020 Add metric unit for temperature, length, weight, capacity.
Change flange type for hydrant from RF to FF as per Piping
5. App.1 21 Sep 2020
Material Specification.
6. App.1 21 Sep 2020 Delete safety sign datasheet.
7. 5 08 Oct 2020 Update reference.
8. App.1 08 Oct 2020 Update reference drawing as per client’s comment.
9. App.1 08 Oct 2020 Change “portable” to “handheld” for fre extinguisher.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.

AMG001-S1-DS-SF-001 Rev. 0 Page 2 of 7


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES
FOR MUARA BAKAH REFINERY EPC PROJECT
Datasheet for Safety and Fire Fighting Equipment Kerendan Facility

TABLE OF CONTENT

REVISION LOG REGISTER ....................................................................................................................... 2


TABLE OF CONTENT ................................................................................................................................. 3
1 INTRODUCTION ................................................................................................................................... 4
1.1 OVERVIEW ................................................................................................................................. 4
1.2 OBJECTIVES .............................................................................................................................. 4
1.3 DEFINITION OF TERM ............................................................................................................... 4
2 REFERENCES ...................................................................................................................................... 4
2.1 INDONESIAN REGULATIONS ................................................................................................... 4
2.2 INTERNATIONAL CODE AND STANDARDS ............................................................................ 5
2.3 PROJECT DOCUMENTS ........................................................................................................... 5
3 ABBREVIATIONS ................................................................................................................................. 6
4 DATASHEET ......................................................................................................................................... 6
APPENDIX 1 – DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT KERENDAN
FACILITY ..................................................................................................................................................... 7

AMG001-S1-DS-SF-001 Rev. 0 Page 3 of 7


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES
FOR MUARA BAKAH REFINERY EPC PROJECT
Datasheet for Safety and Fire Fighting Equipment Kerendan Facility

1 INTRODUCTION
1.1 OVERVIEW
Kerendan Gas Plant Facility (KGPF) in Bangkanai Block produce condensate with production 300 - 600
bbls/d. Bangkanai Block located onshore far North of Banjarmasin city, upstream Barito River, Central
Kalimantan.
Lifting point at Kerendan Gas Plant Facility (KGPF) located 55 km away from Muara Bakah Refinery (MBR)
Plant Area of Barito River and roughly 470 km distance from mouth of Barito River (near Banjar Masin).
PT.Mirah Ganal Energi (MGE) has get approval from OPHIR / MEDCO to be Condensate Off-taker from
KGPF.
Project is divided into 2 (two) Phase scope of work. Phase 1 is from condensate metering on Kerendan Gas
Plant Facilities (KGPF) to Muara Bakah Oil Refinery Area. Work scope is started from outlet existing
Condensate Metering in KGPF until condensate Off-taking Facilities such as Condensate Tank (T-100 A/B),
Metering and Loading Unit on Jetty in Muara Bakah Oil Refinery. And Phase 2 is Muara Bakah Refinery
Plant. Work scope is started from downstream of Condensate Tank (T-100 A/B) to Main Oil Refinery Plant
include utilities and auxiliary.

1.2 OBJECTIVES
The objective of this document is to provide detail data and requirement for safety and fire fighting
equipment in Kerendan Facility.

1.3 DEFINITION OF TERM


COMPANY : PT MIRAH GANAL ENERGI
CONTRACTOR : PT REKA PATRIA EKAGUNA
PROJECT : Detail Design dan Engineering Support Service untuk Muara Bakah Refinery
EPC Project

2 REFERENCES
In the case of any conflict in the requirements specified in the documents attached to the inquiry/order, the
most stringent of the specified requirements shall govern. CONTRACTOR’s interpretation in this regard
shall be final and binding on the VENDOR.
VENDOR/CONTRACTOR shall submit the discrepancy immediately to COMPANY for final resolution.
The following is the order of precedence of the documents accompanying the inquiry/order:
1. Data Sheets
2. P&ID’s and drawings
3. Project Specification
4. Applicable Codes and Standards

2.1 INDONESIAN REGULATIONS


The following is a list of Indonesian regulations related to safety and fire fighting equipment for Kerendan
Facility:

Table 2.1 List of Indonesian Regulations

Regulation of the Minister of Manpower and Requirements for the Installation and Maintenance of Portable Fire
Transmigration (PER.04/MEN/1980) Extinguisher
Regulation of the Minister of Manpower and First Aid at Workplace
Transmigration (PER-15/MEN/VIII/2008)

AMG001-S1-DS-SF-001 Rev. 0 Page 4 of 7


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES
FOR MUARA BAKAH REFINERY EPC PROJECT
Datasheet for Safety and Fire Fighting Equipment Kerendan Facility

2.2 INTERNATIONAL CODE AND STANDARDS


The following is a list of International Code and Standards related to safety and fire fighting equipment for
Kerendan Facility:

Table 2.2 List of International Code and Standards

API RP 2001, 10th Edition, 2019 Fire Protection in Refineries

API 2021, 4th Edition, 2001 Fighting Fires in and around Flammable and Combustible Liquid Atmospheric
Storage Tanks
API RP 2030, 4th Edition, 2014 Application of Fixed Water Spray Systems for Fire Protection in the Petroleum and
Petrochemical Industries
ANSI Z358.1, 2014 Edition Standard for Emergency Eyewash and Shower Equipment

NFPA 1, 2018 Edition Fire Protection Code

NFPA 10, 2013 Edition Standard for Portable Fire Extinguisher

NFPA 11, 2016 Edition Standard for Low-, Medium-, and High-Expansion Foam

NFPA 12, 2011 Edition Standard on Carbon Dioxide Extinguishing Systems

NFPA 15, 2012 Edition Standard for Water Spray Fixed Systems for Fire Protection

NFPA 17, 2017 Edition Standard for Dry Chemical Extinguishing System

NFPA 20, 2019 Edition Standard for the Installation of Stationary Pumps for Fire Protection

NFPA 22, 2017 Edition Standard for Water Tanks for Private Fire Protection

NFPA 24, 2016 Edition Standard for the Installation of Private Fire Service Mains and Their
Appurtenances
NFPA 30, 2015 Edition Flammable and Combustible Liquids Code

NFPA 1961, 2020 Edition Standard on Fire Hose

2.3 PROJECT DOCUMENTS

Table 2.2 List of Project Documents

AMG001-S1-DSB-SF-003 Fire Protection System Design Basis

AMG001-S1-SPC-SF-001 Specification for Safety & Fire Protection Equipment

AMG001-D1-PFD-PC-005 UFD Fire Water System Kerendan Facility

AMG001-D1-PID-PC-006 P&ID Fire Water System Kerendan Facility

AMG001-D1-LAY-SF-004 Safety and Fire Fighting Equipment Layout Kerendan Facility

AMG001-S1-LST-SF-001 Safety and Fire Fighting Equipment List Kerendan Facility

AMG001-S1-SPC-ME-009 Specification for Surface Preparation & Coating

AMG001-S1-SPC-PI-001 Specification for Piping Material Class

AMG001-S1-DS-SF-001 Rev. 0 Page 5 of 7


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES
FOR MUARA BAKAH REFINERY EPC PROJECT
Datasheet for Safety and Fire Fighting Equipment Kerendan Facility

3 ABBREVIATIONS
AFFF : Aqueous Foam Filming Fluoroprotein
ANSI : American National Standard Institute
API : American Petroleum Institute
EPDM : Ethylene Propylene Diene Monomer
EPC : Engineering, Procurement, and Construction
FF : Flat Face
FH : Fire Hydrant
FM : Factory Mutual
KGPF : Kerendan Gas Plant Facility
MBR : Muara Bakah Refinery
MGE : Mirah Ganal Energi
NFPA : National Fire Protection Association
NPT : Nominal Pipe Thread
OD : Outside Diameter
P&ID : Piping and Instrumentation Diagram
UFD : Utility Flow Diagram
UL : Underwriters Laboratories
VTA : Vendor to Advise

4 DATASHEET
Datasheet for safety and fire fighting equipment in Kerendan Facility refer to Appendix 1.

AMG001-S1-DS-SF-001 Rev. 0 Page 6 of 7


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES
FOR MUARA BAKAH REFINERY EPC PROJECT
Datasheet for Safety and Fire Fighting Equipment Kerendan Facility

APPENDIX 1 – DATASHEET FOR SAFETY AND FIRE FIGHTING


EQUIPMENT KERENDAN FACILITY

AMG001-S1-DS-SF-001 Rev. 0 Page 7 of 7


DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 1 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service 2-WAY FIRE HYDRANT (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 3 EA (Tag. No. 10-FH-001/002/003) (Note 2)

4 Wet Barrel
Type
5 2-way (Two x 2-1/2" hose connection)

6 OPERATING CONDITIONS

7 Ambient Temperature 86 °F (30 °C)

8 Relative Humidity 56% (min.) - 93% (max.)


9 Fluid Handled  Fresh Water  River Water  Foam Solution

10 Fluid Temperature Operating : 86 °F (30 °C) Max. : 104 °F (40 °C) Design : 140 °F (60 °C)

11 Fluid pressure Min. : 100 psig Max. : 175 psig Design : 205 psig

12 Fire Water Main Ring Size : 4 inch

13 DESIGN FEATURES

14 Drainage Non-self drainage

15 Min. Hose Outlet Height 457 mm

16 Connection to Main Ring Flange Size : 4 inch Rating : 150 lb FF

17 Coupling Type : Storz coupling Quantity : 2

18 Hose Connection Valve Size : 2-1/2 inch Rating : 150 lb FF


19 Include Caps and Chains

20 ACCESSORIES

21  Flange Bolt & Nut  Hose Gasket  Companion Flange, if required

22  Anchor Bolt & Nut  Flange Gasket  Hydrant Wrench


23 MATERIALS (Note 3)
24 Hydrant Body Brass or bronze

25 Inlet Flange 4 inch, ANSI B-16.1, 150 lb FF

26 Hose Coupling Brass or bronze

27 Connection Valve Brass or bronze


28 Cap Manufacturer's Standard

29 Chain Manufacturer's Standard

30 Handwheel Manufacturer's Standard (Note 4)


31 TESTS & INSPECTIONS APPROVAL

32 Dimensions & Workmanships  Yes  No


 UL Listed or FM Approved
33 Performance Test  Yes  No
(only for hose connection valve)
34 Hydrostatic Pressure Test (Note 5)  Yes  No

35 PAINTING & INTERNAL COATING UNIT WEIGHT

36 Painting Fire Red (RAL 3020) (Note 6)


Manufacturer's Standard
37 Internal Coating Manufacturer's Standard

38 NOTES

39 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
40 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

41 3.) Material shall be suitable for brackish water.

42 4.) Handwheel shall be marked with "open" and "close" letter.

43 5.) Hydrostatic test pressure: 1.5 x Design Pressure for 2 hours.

44 6.) Refer to Specification for Surface Preparation and Coating (Doc. No. AMG001-S1-SPC-ME-009).

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 2 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (2-WAY FIRE HYDRANT)

8
9

10

11

12

13

14

15

16

17 Note : This reference drawing is for illustration only.

18
19

20

21

22
23

24

25

26

27
28

29

30
31

32

33

34

35

36

37

38

39
40

41

42

43

44

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 3 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service HOSE CABINET (Note 1)


2 Location  Outdoor  Indoor
3 Quantity 2 EA (Note 2)
4 OPERATING CONDITIONS

5 Ambient Temperature 86 °F (30 °C)


6 Relative Humidity 56% (min.) - 93% (max.)
7 Fluid handled  Fresh Water  River Water  Foam Solution
8 DESIGN FEATURES

9 Dimension To be enough to contain the equipments described below (see "Item Stored").
10 Type  Leg Supported  Wall Mounted
11 Cabinet Material Carbon Steel (Min. Thickness: 1.5 mm)
12 Door Single door type with handle and metal hinges
13 Legs Min. 200 mm
14 Material Carbon Steel
(Note 3)
15 Item Stored Specification Quantity Materials
16 Ø 2-1/2 inch x 100 ft fire hose
Completed with 2-1/2 inch storz coupling Hose: Oil and abrasive
17
(female connection at one end and male resistance, sinkable, synthetic
18 connection at other end) rubber extruded through woven
Fire Hose 2 rolls
19 Racks or Shelves Press. (Design/Op.) : 205 psig / 100 psig jacket

20 Temp. (Design/Op.) : 140 °F (60 °C) / Coupling: Brass or bronze


21 86 °F (30 °C)
22
2-1/2 inch combination straight stream and fog
23 Nozzle nozzles c/w storz male connection (min. 2 pcs Brass or bronze
capacity 250 GPM at 100 psig)
24
25 ACCESSORIES

26  Anchor (Bolt & Nut)  Name Plate


27
28 TEST & INSPECTION APPROVAL

29 Dimensions & Workmanships  Yes  No  UL Listed or FM Approved


30 Hydrostatic Pressure Test (Note 4)  Yes  No (only for fire hose and nozzle)

31 PAINTING UNIT WEIGHT

32 Painting Fire Red (RAL 3020) (Note 5)


33 "HOSE CABINET" and (Note 6)
Letters Manufacturer's Standard
34 "KABINET SELANG PEMADAM" in white letter
35 Internal Coating Manufacturer's Standard
36 NOTES

37 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
38 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
39 3.) Material shall be suitable for brackish water.
40 4.) Hydrostatic test pressure: 1.5 x Working Pressure for fire hose
41 5.) Refer to Specification for Surface Preparation and Coating (Doc. No. AMG001-S1-SPC-ME-009).
42 6.) The letter both in English and Indonesian shall be written in front of the door.
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 4 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (HOSE CABINET)

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 Note : This reference drawing is for illustration only.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S2-DS-SF-001 PAGE NO. : 5 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service MOBILE FOAM CART (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 1 EA (Note 2)

4 OPERATING CONDITIONS

5 Ambient Temperature 86 °F (30 °C)

6 Relative Humidity 56% (min.) - 93% (max.)

7 Fluid Handled  Fresh Water  River Water  Foam Solution

8 Fluid Temperature Operating : 86 °F (30 °C) Max. : 104 °F (40 °C) Design : 140 °F (60 °C)

9 Fluid pressure Min. : 100 psig Max. : 175 psig Design : 205 psig

10 DESIGN FEATURES

11 Foam Concentrate Type AFFF (Aqueous Film-Forming Foam) (Note 5)

12 Tank Capacity 220 Liters

13 Handline Nozzle Flowrate 60 gpm

14 & Inductor Pressure 100 psig (Operating), 205 psig (Design)

15 Water Inlet Connection 2.5 inch storz coupling

16 Dimension VTA

17 ACCESSORIES

18  Pick-up tube  Red Vinyl Cover (Note 4)  Rubber Wheel and Handle
19 MATERIALS (Note 3)
20 Tank Stainless Steel

21 Handline Nozzle Bronze or Stainless Steel

22 Inductor Bronze or Stainless Steel


23 Pick-up Tube Stainless Steel

24 TEST & INSPECTION APPROVAL

25 Dimensions & Workmanships  Yes No


 UL Listed or FM Approved
26 Performance Test  Yes No
(Note 6)
27 Hydrostatic Pressure Test  Yes No
28 PAINTING & INTERNAL COATING UNIT WEIGHT

29 Painting Manufacturer's Standard


Manufacturer's Standard
30 Internal Coating Manufacturer's Standard
31 NOTES

32 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

33 2.) Refer to Safety and Fire Fighting Equipment Layout Muara Bakah Facility (Doc. No. AMG001-D2-LAY-SF-004).

34 3.) Material shall be suitable for AFFF solution.

35 4.) Weather proof red vinyl cover marked with "FOAM UNIT" and "BUSA PEMADAM API" letter in white, both in English and Indonesian.

36 5.) Equipment shall include foam concentrate supply.

37 6.) This shall be Manufacture guarantee.

38

39
40

41

42

43

44

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 6 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (MOBILE FOAM CART)

3 FOAM INDUCTOR

4 HANDLEBAR
5

6 WATER INLET FOAM HANDLINE NOZZLE


2‐1/2"
7

8
9

10 FOAM TANK

11

12

13

14
CART SUPPORT
CART WHEEL
15

16 FRONT VIEW
SIDE VIEW
17

18
19 Note : This reference drawing is for illustration only.

20

21

22
23

24

25

26

27
28

29

30
31

32

33

34

35

36

37

38

39
40

41

42

43

44

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 7 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service 10 LB HANDHELD CO2 FIRE EXTINGUISHER (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 3 EA (Note 2)

4 Type  Hand-Held  Wheeled

5 OPERATING CONDITIONS

6 Class  A  B C  D  K

7 Ambient Temperature 86 °F (30 °C)

8 Relative Humidity 56% (min.) - 93% (max.)


9 DESIGN FEATURES

10  Water  Foam

11  Potassioum Bicarbonate  Sodium Bicarbonate


Extinguishing Agent
12 Ammonium Phosphate  Potassium Chloride

13  Carbon Dioxide

14 Operation Method  Self Expellent  Stored Pressure Cartridge

15 Agent Weight 10 lb (4.5 kg)

16 Rating 10-B:C (UL Rating)

17 Working Pressure 798 psig (VTA)

18 Test Pressure 2900 psig (VTA)


19 Effective Range 6 ft (1.8 m) (VTA)

20 Discharge Time 16 seconds (VTA)

21 Nozzle Type Horn

22 Hose Length VTA


23 Dimension 7 inch (OD) x 22-3/4 inch (H) (VTA)

24 Installation Method  Bracket  Cabinet  Pan & Stand

25 ACCESSORIES

26  Bracket (Note 3)  Cabinet  Trolley

27  Hose & Nozzle


28  Red Vinyl Cover  Pressure Gauge  Indicating Cap Relief Device Inspection Tag

29 MATERIALS

30 Shell Carbon Manganese Steel or equivalent


31 Hose Neoprene or EPDM Rubber

32 TEST & INSPECTION APPROVAL

33 Dimensions & Workmanships  Yes  No

34 Performance Test  Yes  No  UL Listed or FM Approved

35 Pressure Test  Yes  No

36 PAINTING UNIT WEIGHT

37 Painting Manufacturer's Standard


39.4 lb (17.9 kg) (VTA)
38 Finish Manufacturer's Standard

39 NOTES

40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

42 3.) Metal brackets (wall hanger type of bracket).

43

44
45

46

47

48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 8 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (10 LB HANDHELD CO2 FIRE EXTINGUISHER)

4
DISCHARGE LEVER
5
DISCHARGE LOCKING PIN AND SEAL CARRYING HANDLE
6

7 DISCHARGE HOSE

8
9
DATA PLATE
10

11

12

13 BODY (SHELL) DISCHARGE NOZZLE


14

15

16

17

18
19 Note : This reference drawing is for illustration only.

20

21

22
23

24

25

26

27
28

29

30
31

32

33

34

35

36

37

38

39
40

41

42

43

44

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 9 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service 20 LB HANDHELD ABC DRY CHEMICAL POWDER FIRE EXTINGUISHER (Note 1)


2 Location  Outdoor  Indoor
3 Quantity 1 EA (Note 2)
4 Type  Hand-Held  Wheeled
5 OPERATING CONDITIONS

6 Class  A  B  C  D  K
7 Ambient Temperature 86 °F (30 °C)

8 Relative Humidity 56% (min.) - 93% (max.)


9 DESIGN FEATURES

10 Water  Foam
11  Potassioum Bicarbonate  Sodium Bicarbonate
Extinguishing Agent
12 Ammonium Phosphate  Potassium Chloride
13  Carbon Dioxide
14 Operation Method  Self Expellent  Stored Pressure  Cartridge
15 Agent Weight 20 lb (9 kg)
16 Rating Min. 20-A; 80-B:C (UL Rating)
17 Working Pressure 160 psig (VTA)
18 Test Pressure 348 psig (VTA)
19 Effective Range 15 ft (4.6 m) (VTA)
20 Discharge Time 15 seconds (VTA)
21 Handle Type Non-slip
22 Hose Length VTA
23 Dimension 9-1/2 inch (OD) x 22-1/2 inch (H) (VTA)
24 Installation Method  Bracket  Cabinet  Pan & Stand
25 ACCESSORIES

26  Bracket (Note 3)  Cabinet  Trolley


27  Hose & Nozzle
28  Red Vinyl Cover  Pressure Gauge Indicating Cap  Relief Device  Inspection Tag
29 MATERIALS

30 Shell Steel with corrosion resistant coating


31 Hose Neoprene or EPDM Rubber
32 TEST & INSPECTION APPROVAL

33 Dimensions & Workmanships  Yes  No


34 Performance Test  Yes  No  UL Listed or FM Approved

35 Pressure Test  Yes  No


36 PAINTING UNIT WEIGHT

37 Painting Manufacturer's Standard


32 lb (14.5 kg) (VTA)
38 Finish Manufacturer's Standard
39 NOTES

40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).
42 3.) Metal brackets (wall hanger type of bracket).
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 10 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (20 LB HANDHELD ABC DRY CHEMICAL POWDER FIRE EXTINGUISHER)

2
3 DISCHARGE LEVER

4 DISCHARGE LOCKING PIN AND SEAL


PRESSURE GAUGE
5 CARRYING HANDLE

6
7 DISCHARGE HOSE
8 DATA PLATE

9
10
11
12
13 BODY (SHELL)
14
DISCHARGE NOZZLE
15
16
17
18
19 Note : This reference drawing is for illustration only.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 11 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service 20 LB HANDHELD BC DRY CHEMICAL POWDER FIRE EXTINGUISHER (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 3 EA (Note 2)

4 Type  Hand-Held  Wheeled

5 OPERATING CONDITIONS

6 Class  A  B  C  D  K

7 Ambient Temperature 86 °F (30 °C)

8 Relative Humidity 56% (min.) - 93% (max.)


9 DESIGN FEATURES

10 Water  Foam

11  Potassioum Bicarbonate  Sodium Bicarbonate


Extinguishing Agent
12 Ammonium Phosphate  Potassium Chloride

13  Carbon Dioxide

14 Operation Method  Self Expellent  Stored Pressure  Cartridge

15 Agent Weight 20 lb (9 kg)

16 Rating Min. 80-B:C (UL Rating)

17 Working Pressure 160 psig (VTA)

18 Test Pressure 348 psig (VTA)


19 Effective Range 15 ft (4.6 m) (VTA)

20 Discharge Time 15 seconds (VTA)

21 Handle Type Non-slip

22 Hose Length VTA


23 Dimension 9-1/2 inch (OD) x 22-1/2 inch (H) (VTA)

24 Installation Method  Bracket  Cabinet  Pan & Stand

25 ACCESSORIES

26  Bracket (Note 3)  Cabinet  Trolley

27  Hose & Nozzle


28  Red Vinyl Cover (Note 4)  Pressure Gauge Indicating Cap  Relief Device  Inspection Tag
29 MATERIALS

30 Shell Steel with corrosion resistant coating


31 Hose Neoprene or EPDM Rubber

32 TEST & INSPECTION APPROVAL

33 Dimensions & Workmanships  Yes  No

34 Performance Test  Yes  No  UL Listed or FM Approved

35 Pressure Test  Yes  No


36 PAINTING UNIT WEIGHT

37 Painting Manufacturer's Standard


32 lb (14.5 kg) (VTA)
38 Finish Manufacturer's Standard

39 NOTES

40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

42 3.) Metal brackets (vehicle type of bracket).


43 4.) Weather proof red vinyl cover completed with clear inspection window and marked with "FIRE EXTINGUISHER" and "ALAT PEMADAM API RINGAN" letter in white,

44 both in English and Indonesian.

45

46

47

48

49
50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 12 OF 15


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (20 LB HANDHELD ABC DRY CHEMICAL POWDER FIRE EXTINGUISHER)

3 Fire Extinguisher Protection Cover


4
DISCHARGE LEVER
5
DISCHARGE LOCKING PIN AND SEAL
6 PRESSURE GAUGE
CARRYING HANDLE
7

8
DATA PLATE
9

10
DISCHARGE HOSE
11

12

13
BODY (SHELL)
14 DISCHARGE NOZZLE

15

16

17

18
19 Note : This reference drawing is for illustration only.

20

21
22

23

24

25

26

27

28
29

30

31

32

33
34

35

36

37

38
39

40

41

42

43

44

45

46

47

48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 13 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service 125 LB WHEELED BC DRY CHEMICAL POWDER FIRE EXTINGUISHER (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 1 EA (Note 2)

4 Type  Hand-Held  Wheeled

5 OPERATING CONDITIONS

6 Class  A  B  C  D  K

7 Ambient Temperature 86 °F (30 °C)

8 Relative Humidity 56% (min.) - 93% (max.)


9 DESIGN FEATURES

10 Water  Foam

11  Potassioum Bicarbonate  Sodium Bicarbonate


Extinguishing Agent
12 Ammonium Phosphate  Potassium Chloride

13  Carbon Dioxide

14 Operation Method  Self Expellent  Stored Pressure  Cartridge

15 Operation Gas  N2  CO2

16 Agent Weight 125 lb (56.7 kg)

17 Rating Min. 80-B:C (UL Rating)

18 Working Pressure 189 psig (VTA)


19 Test Pressure 348 psig (VTA)

20 Effective Range 30 - 40 ft (9 - 12 m) (VTA)

21 Discharge Time 48 seconds (VTA)

22 Hose Length VTA


23 Dimension 29 inch (OD) x 52 inch (H) (VTA)

24 Installation Method  Bracket  Cabinet  Pan & Stand

25 ACCESSORIES

26  Bracket  Cabinet  Trolley (Note 3)

27  Hose & Nozzle


28  Red Vinyl Cover (Note 4)  Pressure Gauge Indicating Cap  Relief Device  Inspection Tag
29 MATERIALS

30 Shell Steel with corrosion resistant coating


31 Hose Non-collapsible, non kinking fire hose

32 TEST & INSPECTION APPROVAL

33 Dimensions & Workmanships  Yes  No

34 Performance Test  Yes  No  UL Listed or FM Approved

35 Pressure Test  Yes  No

36 PAINTING UNIT WEIGHT

37 Painting Manufacturer's Standard


443 lb (200 kg) (VTA)
38 Finish Manufacturer's Standard

39 NOTES

40 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

41 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

42 3.) Extinguisher mounted at trolley with rubber wheel.


43 4.) Weather proof red vinyl cover completed with clear inspection window and marked with "WHEELED FIRE EXTINGUISHER" and "ALAT PEMADAM API BESAR" letter

44 in white, both in English and Indonesian.

45

46

47

48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 14 OF 15


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 REFERENCE DRAWING (125 LB WHEELED BC DRY CHEMICAL POWDER FIRE EXTINGUISHER)

3 Fire Extinguisher Protection Cover


4

5
HANDLEBAR
6
N2 CARTRIDGE
7

10 DISCHARGE HOSE AND NOZZLE

11
DATA PLATE
12
WHEEL
13

14

15 BODY (SHELL)

16

17

18
19 Note : This reference drawing is for illustration only.

20

21
22

23

24

25

26

27

28
29

30

31

32

33
34

35

36

37

38
39

40

41

42

43

44

45

46

47

48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 15 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service STRETCHER (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 1 EA (Note 2)

4 DESIGN FEATURES

5 Type Foldable and portable

6 Dimension VTA

7 Horizontal Lift  Yes  No

8 Restraint Straps  Yes  No


9 Lifting Asembly  Yes  No

10 Carry Handles  Yes  No

11 Storage Provided

12 Material Alluminium Alloy

13 NOTES

14 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

15 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

16

17 REFERENCE DRAWING (STRETCHER)

18
19

20
STRETCHER BASE
21
RESTRAINT STRAP
22
CARRYING HANDLES
23

24
FRAME
25

26

27
STRETCHER SUPPORT
28

29

30
31

32

33

34 STORAGE

35

36

37

38

39
40 Note : This reference drawing is for illustration only.

41

42

43

44

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 16 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service FIRST AID KIT (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 1 EA (Note 2)

4 DESIGN FEATURES

5 Material Sturdy and water proof

6 Design Portable (fitted with carrying handle or strap)

7 Type Box A (for 25 personnel or less)

8 Dimension To be enough to store below items

9 SPECIFICATION

10 Refer to Peraturan Menteri Tenaga Kerja dan Transmigrasi Republik Indonesia No. 15/2008, each kit (A-type) shall include the following but not limited to:

11

12 No. Contents Quantity

13 1. Wrapped steril gauze 20

14 2. Bandage (5 cm width) 2

15 3. Bandage (10 cm width) 2

16 4. Plaster (1.25 cm width) 2

17 5. Adhesive plaster 10

18 6. Absorbent cotton wall 1

19 7. Triangular bandages 2

20 8. Scissor 1

21 9. Safety pin 12

22 10. Disposable gloves (pairs) 2

23 11. Mask 2

24 12. Tweezer 1

25 13. Flashlight 1

26 14. Eyewash glass 1

27 15. Plastic bag 1

28 16. Aquades (100 ml Saline solution) 1

29 17. Povidon iodine (60 ml) 1

30 18. Alcohol 70% 1

31 19. Guide book of first aid in workplace 1

32 20. Note book 1

33 21. List of contents 1

34

35 NOTES

36 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

37 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

38

39 REFERENCE DRAWING (FIRST AID KIT)

40

41

42

43

44

45

46

47

48

49 Note : This reference drawing is for illustration only.

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 17 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service PORTABLE EYE WASH (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 1 EA (Note 2)

4 OPERATING CONDITIONS

5 Ambient Temperature 86 °F (30 °C)

6 Relative Humidity 56% (min.) - 93% (max.)

7 Fluid handled  Fresh Water  River Water

8 DESIGN FEATURES

9 Type Self-contained

10 Dimension VTA

11 Material High density polyethylene

12 Eyewash Flowrate 0.4 GPM (1.5 LPM)

13 Duration for Eyewash 15 mins

14 Capacity 16 Gallon (60.5 Liter)

15 ACCESSORIES

16  Bracket  Eye wash Preservative Additive (Note 3)  Instruction or Diagram of Usage

17 NOTES

18 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).
19 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

20 3.) To permit storage of water for several months.

21

22 REFERENCE DRAWING (PORTABLE EYE WASH)

23

24

25

26

27
DUST COVER
28
WATER STORAGE
29

30
31

32

33

34

35

36

37

38

39 Note : This reference drawing is for illustration only.


40

41

42

43

44

45

46

47
48

49

50
DETAIL DESIGN AND ENGINEERING SUPPORT SERVICES FOR pt. REKA PATRIA EKAGUNA
MUARA BAKAH REFINERY EPC PROJECT ENGINEERING SERVICES COMPANY

PT. MIRAH GANAL ENERGI

DOCUMENT NO. : AMG001-S1-DS-SF-001 PAGE NO. : 18 OF 18


DATASHEET FOR SAFETY AND FIRE FIGHTING EQUIPMENT
KERENDAN FACILITY
PROJECT NO. : AMG.001 DATE : 08-Oct-20

1 Service WINDSOCK (Note 1)

2 Location  Outdoor  Indoor

3 Quantity 1 EA (Note 2)

4 WINDSOCK SPECIFICATION

5 Type Unlighted

6 Opening throat diameter 18 inch

7 Sock Length 8 ft (2.5 m)

8 Colour Orange and white


9 Material Cotton or synthetic material

10 SUPPORTING STRUCTURE

11 Pole Diameter 4 inch and reduce to 2 inch

12 Pole Height 16.4 ft (5 m), above ground to bottom of framework

13 Base type Galvanized Steel Hinged

14 FRAMEWORK

15 Diameter 18 inch

16 Material Metallic or non-metallic

17 Rotation 360 degrees swivel block on concealed stainless bearings

18 NOTES

19 1.) Refer to Specification for Safety and Fire Protection Equipment (Doc. No. AMG001-S1-SPC-SF-001).

20 2.) Refer to Safety and Fire Fighting Equipment Layout Kerendan Facility (Doc. No. AMG001-D1-LAY-SF-004).

21

22 REFERENCE DRAWING (WINDSOCK)

23

24

25

26

27
28

29

30
31

32

33

34

35

36

37

38

39
40

41

42

43

44

45

46 Note : This reference drawing is for illustration only.

47
48

49

50