Method of Statement (MOS)

Grounding Grid / Mesh

Issue Date : 2021-08-04 Issue : 1 Rev. No : 0 Ref. No : MOS-E002

Project :

1. PURPOSE & SCOPE


The purpose and scope of this procedure is to define the sequence of activities for installation of Grounding Mesh. It involves all installation and testing activities.

2. DEFINATION & ABBREVIATION


ITP - Inspection and testing plan
QA / QC - Quality Assurance / Quality Control
RFI - Request for inspection
NCR - Non Conformance Report
PQP - Project Quality Plan
HSE - Health, safety and environment
IFC - Issued for construction
MOS - Method of Statement

3. REFRENCE

Project Quality Plan (PQP)

Inspection and Test Plan (ITP)

Quality control procedure for identification and traceability (QP7.5.5)

Check list or SOP-3 / 14

Approved Grounding Mesh Lay out drawing

TES-P-119.10 Grounding

4. RESPONSIBILITIES

Project Manager

???To arrange required material and resources.


Site Manager

???Responsible to execute activity as per plan /schedule.


QA/QC Engineer

???Responsible for ensuring and monitoring that all cable trays installation activities are executed as per client required SEC procedures, approved ITP’s and MOS.

Forman

???Responsible to execute activity of installation as per IFC drawings and this MOS.
Safety Officer

???Responsible for ensuring best Health& Safety practices across working, storage areas and during equipment operations. He must prepare risk assessment for
effective controls.

5. TOOLS & EQUIPMENT


Method of Statement (MOS)

Grounding Grid / Mesh

Issue Date : 2021-08-04 Issue : 1 Rev. No : 0 Ref. No : MOS-E002

Project :

Steel Wire Brush


Paint Brush
Bituminous Paint
Thermite Weld Mold Set
Weld Powder
Flint Igniter
Resistance Tester

6. PROCEDURE
Installation

Ensure that grounding conductor and rods are as per approved BOQ and drawings for use.
Ensure the depth of excavated trench for buried grounding conductor is as per client specification before laying of grounding mesh.
Obtain PTW (Permit to work) if required.
The spacing of grounding mesh shall be laid as per approved drawing.
Grounding rod shall be driven vertically up to required length.
Thermite weld mold size and powder type shall be same brand for joints connection.
Weld all junctions with thermite weld mold and weld powder properly .
Ensure solid junction and connection as result of thermo-welding.
Apply bituminous paints for additional protection of all joints after cleaning thermite weld connection, with steel brush.
Wrapped the applied bituminous paint with vinyl tape.

Testing
Measure contact resistance of all bolted or thermite welded joints at 100 A DC.
Check and verify all thermite welded joints, securely connected to mesh.
Check electrical resistance of grounding points and main grounding system according to IEEE Standards.
Measure the grounding grid system by “ fall of potential ” method .

7. ADDITIONAL INFORMATION
Attachment

Risk Assessment (See the Attached File)


SEC Standard (See the Attached File)

8. ATTACHEMENTS
1. TES-P-119.10 SEC Standard

2. MOS- GROUNDING GRID MESH

3. MOS- GROUNDING GRID MESH

4. MOS- GROUNDING GRID MESH