PART 1 GENERAL
1.01 SCOPE
A. Furnish all equipment, materials, expertise, labor, tools, paint, and related items
and perform all operations required for fabrication and erection of a single-pedestal
spheroid steel water storage tank and tower, complete, in place, with foundation,
and accessories, in strict accordance with these Specifications and applicable
Drawings and subject to the terms and conditions of the Contract.
1.02 REFERENCES
1.03 SUBMITTALS
B. Upon award of Contract, submit detailed drawings of the tank showing dimensions
and plate thicknesses. Drawings shall be sealed by a professional engineer
registered in the State of North Dakota.
E. Submit to the Engineer, a minimum of fourteen (14) business days prior to the pre-
construction conference for review and approval, the following items:
1. List of sub-contractors.
2. Construction schedule.
3. Shop drawings.
4. Welder certifications.
5. Welding procedures.
6. Certified statement on lead free coatings.
7. Provide product data on all finishing products.
G. Submit a minimum of five (5) copies plus up to four (4) copies, to be returned to
Contractor, of Shop Drawings to the Engineer. Each copy shall contain the
following submissions.
1. Date of submission and dates of any previous submissions.
2. Project title and number.
3. Contract identification.
4. Names of:
a. Contractor
b. Supplier.
c. Manufacturer.
5. Identification of product, with specification section number, equipment
number and/or tag number.
6. Field dimensions, clearly identified as such.
7. Relationship to adjacent or critical features of work or materials.
8. Applicable standards, such as ASTM or other specification numbers.
9. Identification of deviations from Contract Documents.
10. Identification of revisions on resubmittals.
11. Unless the precise color and pattern is specifically described in the
Contract Documents, and whenever a choice of color or pattern as
available in a specified product, submit accurate color pattern charts to
the Engineer for review and selection.
12. A 4" x 4" blank space for Contractor and Engineer Stamps.
13. Indication of Contractor’s approval, dated and signed, with wording similar
to the following:
"Approved to be in conformance with the requirements of the Contract
Documents".
A. The structure shall safely withstand the wind load in accordance with the provisions
of AWWA D100.
B. Tank shall be a 1,000,000 gallon single pedestal spheroidal shaped tank. The
support pedestal shall have a truncated conical base and a gracefully flared top
transition. Tank shall have a maximum head range of 40 feet and the diameter
shall exceed 75 feet. Elevation of high water level shall be as shown on the
drawings.
C. The supporting structure shall be a butt-welded single pedestal. The pedestal shall
be dry. Transition sections between the shaft and tank and between the shaft and
base cone shall be smooth continuous curves. Discontinuous transitions and
intersections through compression rings are not acceptable in these areas.
D. The over-turning moment used in designing the pedestal and foundation shall
include the moment due to eccentricity of the gravity loads caused by deflection of
the structure under wind or seismic conditions. Determine the load conditions for
the system and design the tower and foundation accordingly.
F. All portions of the tank, including the roof, shall be of water-tight construction and
all material in contact with water shall have a minimum thickness of 1/4-inch. Parts
not in contact with water shall have a minimum thickness of 3/16-inch.
G. All welded joints on the tank interior including stiffeners, roof plates, hatch
penetrations, rigging penetrations, and the underside of roof and lap joints shall be
seal welded as a minimum.
A. Design and construct a foundation system capable of providing permanent support for the
design loads as indicated in AWWA D100 and in accordance with the requirements of
these Specifications.
B. The design loads shall be as indicated in AWWA D100 with earthquake loads for
Zone No. 0.
PART 2 PRODUCTS
2.01 EXPERIENCE
A. Contract will be awarded to experienced tank Contractors who have furnished and
erected at least ten single-pedestal elevated tanks of equal or greater capacity. A
letter shall accompany the bid listing ten such tanks including the name of the
Owner, the capacity, location and year completed.
B. Approved Manufactures:
1. Caldwell Tanks, Inc.
2. Chicago Bridge and Iron Company
3. Maguire Iron, Inc.
4. Phoenix Fabricators & Erectors, Inc.
5. Or Approved Equivalent.
A. The materials, design, fabrication and erection of the elevated tank shall conform to
current AWWA D100 of the American Water Works Association Standard and/or
governing Insurance Specifications.
B. The tank and supporting structure shall be of all-welded construction and all parts
shall be of water-tight construction including those portions above the high water
level. The supporting structure shall be a butt-welded single pedestal having a
diameter as required for design loads. The tank shall have a head range between
low water level and overflow level of no more than 40 feet. Transition sections
between the pedestal and tank and between the pedestal and base bell shall be
smooth curves. The pedestal shall be dry.
C. Wrought Steel Pipe shall carry water from the stainless steel expansion joint to the
bottom of the tank. The riser pipe between the expansion joint and the 90 degree
bend shall be flanged DI pipe. The entire length of the riser pipe shall be painted
per Division 09920. The riser pipe shall be insulated and covered with an
aluminum jacket over the entire length of insulation.
F. A freeze proof vent of adequate size to handle pressure differential caused when
filling or draining water at a maximum rate of 6000 gpm shall be provided. The
open area of the overflow shall not be considered as venting area. The vent shall
prevent the entrance of rainwater, exclude birds, animals, insects, and dust as
much as can be made compatible with effective venting. The vent shall be easily
dismantled to remove the screens for cleaning. The vent shall be designed to
prevent freezing. The vent shall be designed to relieve any pressure or vacuum in
the event the screen frosts over or is otherwise clogged.
G. Provide a 36-inch by 80-inch commercial steel door with flush threshold located in
the base cone complete with a handle, and drip cover. The door shall be 1 3/4
inches thick with 4 3/4-inch 16-gauge jambs, door holder and automatic boor
bottom. Door shall be minimum 16-gauge and insulated with pre-formed
polystyrene insulation. Doors shall be thoroughly cleaned, phosphated and
finished with one coat of baked-on rust inhibiting prime paint in accordance with
ASTM B117 and ASTM D1735. Provide three (3) full mortise, 5 knuckle hinges,
4 1/2 inches by 4 1/2 inches minimum. Hinges shall be steel, phosphated and
primed coated for finish painting. Provide a complete and functional door lockset
and tumbler-type lock, keyed to the owner’s existing system. Door painting shall
conform to the tank exterior paint system. A step over threshold is not acceptable.
H. Ladders shall be provided in bell, pedestal, and access tube. All ladders shall be
equipped with 3/8” cable safety climb devices in accordance with OSHA standards.
The owner shall be supplied with two (2) harnesses and two (2) sleeves.
I. Steel condensate ceilings located at the junction of the pedestal cylinder and
truncated cone and 8-feet below the tank wall shall be furnished complete with
drain. A 30-inch diameter hinged hatch shall be provided at each ladder access
point through each platform level. Provide a hatch lid rest for each hatch as
depicted in the Drawings. Each condensate ceiling shall have two (2) - 6”x12”
rectangular openings with 4” curbing to allow for the passage of
electrical/communication conduit/cables.
J. A 24” manway giving access to two painter’s rings located at the top of the
pedestal shall be provided. There shall be a platform inside the pedestal at this
point.
L. Furnish and install 24-inch diameter, pressure style manway in the tower bowl.
The manway should be located 180 degrees from the inlet pipe and include a
ladder from the top platform to the bowl. A chain shall attach the crossbar to the
tower bowl.
M. Two 30-inch diameter hinged rain proof hatches shall be provided on top of the
tank. One shall be at the top of the access tube with an inside handle and a hatch
lid rest as depicted on the Drawings. The other shall be adjacent to the access
tube for entry into the tank and shall have a handle and vertical hasp with a ½”
opening. The hatch openings shall have a curb 4-inches high and the cover shall
overlap the frame opening and extend 2-inches down the frame.
N. One 24-inch diameter flanged roof hatch located adjacent to the access tube shall
be constructed to bolt an exhaust fan over the opening to allow for adequate
ventilation during painting.
O. Provide a 4” freeze-proof drain valve mounted at the lowest point practical on the
bottom of the bowl. Valve shall be screw-mounted to the tank and shall discharge
to the overflow pipe. Provide flexible pipe from valve to overflow pipe.
P. Components welded to the interior of the supporting pedestal shall be seal welded
as a minimum. The underside of the condensate ceiling shall be seal welded as a
minimum.
R. Provide conduit/cable brackets from the base of the tower to the roof as indicated
on the drawings.
PART 3 EXECUTION
A. All welders shall be qualified by ASME Section IX requirements for all positions.
C. Mill Test Reports: Submit indicating structural strength, destructive, and non-
destructive test analysis results.
D. Inspection and testing will be in accordance with Section 11 of AWWA D100. The
radiographic method shall be used to test all welds, and the film shall become the
property of the Owner.
F. Leak Testing: Coordinate the connection of the water main to be installed under
this project with Owner. Upon erection and painting of tank, the Owner shall
furnish sufficient water for testing and sterilization. Contractor is responsible for
any required pumping and disposal of water. Any leaks, which are disclosed by
this test, shall be repaired by gouging out defective areas and rewelding. No repair
work shall be done on any joint unless the water in the tank is at least two feet
below the point being repaired. Any paint damaged by repairs shall be properly
restored.
3.04 PAINTING
3.05 WARRANTY
A. Guarantee Work for a period of two years from the date of final completion. Repair
any defects of which it is notified during that period which may appear because of
faulty design, workmanship or material furnished.
END OF SECTION