NAME OF WORK CIVIL , ELECTRICAL AND RCC FRAMED STRUCTURAL WORKS FOR THE PROPOSED FIRST AID CENTRE BUILDING AT PANIPAT REFINERY,IOCL
IS. 456, 1199, 8112, 4925, 4926, IOCL/HKS/QC/003/ Once in three Review of regularization of Non
3 PLAIN CEMENT CONCRETE (PCC) IOCL/HKS/JP/QC/003 REV.0 Site Engineer Lead Civil RCM ITP No.:-IOCL/HKS/QC/ITP-03 Rev-0 As per ITP
2386, 1791, 12119 & 516. Rev.0 months conformance
IS. 516-1959,IS-10262,IS-383-
REINFORCEMENT CEMENT IOCL/HKS/QC/004/ Once in three Review of regularization of Non
4 IOCL/HKS/JP/QC/004 REV.0 1970,IS 2502-1963,IS 456- Site Engineer Lead Civil RCM ITP No.:-IOCL/HKS/QC/ITP-04 Rev-0 As per ITP
CONCRETE (RCC) (SUB STRUCTURE) Rev.0 months conformance
2000,IS-269,IS-8112.
IS. 516-1959,IS-10262,IS-383-
REINFORCEMENT CEMENT
1970,IS 2502-1963,IS 456- IOCL/HKS/QC/005/ Once in three Review of regularization of Non
5 CONCRETE (RCC) (SUPER IOCL/HKS/JP/QC/005 REV.0 Site Engineer Lead Civil RCM ITP No.:-IOCL/HKS/QC/ITP-05 Rev-0 As per ITP
2000,IS-269,IS-8112. Rev.0 months conformance
STRUCTURE)
As Per IS : 2386,IS- 1542, IS- IOCL/HKS/QC/009/ Once in three Review of regularization of Non
9 PLASTERING IOCL/HKS/JP/QC/009 REV.0 Site Engineer Lead Civil RCM ITP No.:-IOCL/HKS/QC/ITP-09 Rev-0 As per ITP
2645 Rev.0 months conformance