16.0 ENGINEERING CALCULATIONS
Volume:
barrel (bbl) 5.615 cubic feet (ft3)
barrel (bbl) 0.159 cubic meter (m3)
barrel (bbl) 42 gallon, U.S. (gal)
gallon, U.S. (gal) 3.785 liter (l)
cubic meter (m3) 6.289 barrel (bbl)
cubic meter (m3) 1000 liter (l)
Mass or Weight
kilogram (kg) 2.204 pound (lb)
pound (lb) 0.454 kilogram (kg)
ton, U.S. (t) 2000 pound (lb)
metric ton (mt) 1000 kilogram (kg)
metric ton (mt) 2204 pound (lb)
metric ton (mt) 1.102 ton, U.S. (t)
Length
feet (ft) 0.3048 meter (m)
inch (in) 2.54 centimeter (cm)
inch (in) 25.4 millimeter (mm)
meter (m) 3.281 feet (ft)
Pressure
lb/in2 (psi) 6.895 kiloPascal (kPa)
lb/in2 (psi) 0.06895 bar (bar)
lb/in2 (psi) 0.0703 kg/cm2
kiloPascal (kPa) 0.145 lb/in2 (psi)
bar (bar) 100 kiloPascal (kPa)
atmosphere 14.7 lb/in2 (psi)
bar 14.5 lb/in2 (psi)
Density
pound/gallon (ppg) or (lb/gal) 119.83 kg/m3 and g/l
kilogram/cubic meter (kg/m3) 0.008345 ppg or lb/gal
pound/gallon (ppg) or (lb/gal) 0.11983 g/cm3, kg/l, or SG
pound/cubic feet (pcf) or 16.02 kg/m3 and g/l
(lb/ft3)
g/cm3, kg/l, or SG 8.345 ppg or lb/gal
Concentration
pound/gallon (ppb) or (lb/bbl) 2.853 kg/m3 and g/l
Kilogram/cubic meter (kg/m3) 0.3505 ppb or lb/bbl
Temperature
°Centigrade (°C x 1.8) + 32 °Fahrenheit
°Fahrenheit (°F - 32) /1.8 °Centigrade
16.2. SURFACE TANK / PIT CAPACITY
π × radius 2 ( ft ) × Height( ft )
Bbls = π = 3.14159
5.6 cubic foot per bbl .
Bbls. =
(W1 + W2 ) × d × L
(2) 5.6 cubic foot per bbl.
W1 = Longest Width
W2 = Shortest Width
d = Vertical Depth
L = Length
[a]
Drill Pipe / Inside Casing (ft/min) =
Pump Output (bbls / min)
Casing ID (in) − Drill Pipe OD (in)
2 2
1029
[b]
Drill Pipe / Open Hole (ft/min) =
Pump Output (bbls / min)
Hole Diameter (in) − Drill Pipe OD (in)
2 2
1029
[c]
Drill Collars / Open Hole (ft/min) =
Pump Output (bbls / min)
2 2
Hole Diameter (in) − Drill Collars OD (in)
1029
Pressure psi
Mud Weight lb / gal =
True Vertical Depth ft x .052
Pressure psi / ft
Mud Weigthlb / gal =
.052
( )(
Pressure psi = Max. All. M.W.lb/gal − M.W.in uselb/gal x .052 x Csg.TVD ft )
SIDPPpsi
Kill Mud Weight = + Present MWlb/gal
0.052 x True Vertical Depth ft
SICPpsi − SIDPPpsi
Fluid Density lb / gal =
0.052 x length of kick ft
Cutting Volumebbls / hr
[3] % Cutting in Annulus = x 100
Circulating Ratebbls / hr
*Transfer the required volume prior to adding the VBar/Water to maintain a constant volume. Using
this procedure your Drill Solids Content will be slightly less then that calculated.
16.14 SOLIDS ANALYSIS (See Chapter 9, page 9.31 Drilling Fluids Engineering Manual)
Note: For an unweighted system it is more accurate to use the above equation instead of running
a retort.
16.14b.1 NOMENCLATURE
V = Volume %
ρ = Density (ppg or any consistent units)
HGS = High Density Solids -weight materials,
(Barite – 4.2 SG or 35.0 ppg / Hematite 5.0 SG or 41.67 ppg)
LGS = Low Density Solids (drilled & added solids, SG 2.6 or 21.67 ppg)
SW = Salt Water (water form retort + dissolved salt)
H2O = Water from retort ( 8.334 ppg)
OIL/SYN = Oil/Synthetic (diesel or mineral oil 7.0 ppg), or non-water liquids)
MBT = Methylene Blue Test ppb (also referred to as CEC or MBC)
F = Fraction of bentonite in drill solids derived by dividing the MBT of drill solids
by 65 (Assumed MBT of Bentonite) or use the default fraction value of 0.1111
when needed.
V SW = V H 2O + V Salt
1. ( ) ( )
2
SGsw = 1.0 + 1.166 × 10−6 mg / l Cl − − 8.375 × 10−13 mg / l Cl − + 1.338 × 10−18 mg / l Cl − ( )
3
( )
mg / l Cl × 1.65
b.] NaCl Salt ppb = %V H 2O + %V Salt × × (.035)
10,000
5. a.] % V HGS =
( ) ( ) (
ρ Mud (100 ) − ρ LGS 100 − %V H 2 O − %VSalt − %VOil / Syn − ρ SW %V H 2 O + %VSalt − ρ Oil / Syn %VOIL / Sny )
ρ HGS − ρ LGS
%V HGS
b.] HGS ppb = ( ρ HGS ppg × 42)
100
%VLGS
b.] LGS ppb = ( ρ LGS ppg × 42 )
100
(
MBT − F × LGS ppb ) MBTDrill Solids
7. a.] Bentonite ppb = Note: F =
(1 − F ) 65
Bentonite ppb
b.] % V BENTONITE =
9 .1
%V DS DS ppb
9. DS / Bentonite Ratio = OR
%V Bentonite Bentonite ppb