@ CAMERON PROCESS & COMPRESSION SYSTEMS
ENGINEERING STANDARD E830 Rev 04
ot
SUPERIOR COMPRESSOR START UP CHECKLIST
AND REPORT CONTROL PROCEDURES
cea
‘The purpose of this Engineering Standard Is to identily procedures for distribution and conticl of the Superior
Sar-Up Checklist and Report. This checklist provides packagers, service representalves, and users with a
clear and concise checklist fo follow during inital stating of Superior compressors. It is also the official
notification to Superior that the compressor has been paced in service.
20 SCOPE
The Superior StartUp Checklist and Repott shall be used by all Cameron service personnel, as woll as
packagers, and customers. Iti not intended to include all safety precautions and procedures and the checklist
is to be used in conjunction with the equipment instructon manual,
3.0 REQUIREMENTS
Instruction Manual, customer's regulations/procedures and any applicable safety regulations. ‘The Superior
Sar-Up Checklist and Report should be used as a minimum. More detailed locally developed start-up
checklists may be used if they report all f the data and checks covered in the Superior Start-Up Chackiist and
‘Roport. If the locally developed start-up checklist does not cover all tems listed on the Superior checkist please
complete the Superior lis 2s well asthe locally developed lis.
4.0 RESPONSIBILITY
The attached start-up checklist and report must be filed out for each start-up of new or OEM remanufactured
Ccompressorsioylinders. It is the responsibilty of the customer fo make sure the checklstreport is completely
filed out and returned to Superior in a timely manner. Ifthe packager is doing the start-up the customer must
make sure the packager completes the checklist and gives it to the customer so that the customer can mail a
‘copy of the completed list to Superior.
50 PROCESS
5.1 AMaster (Controlled) Copy ofthe Superior Start-Up Checklist and Report is maintained on SAP.
5.2 A copy of the checklist will be included with every set of Instruction Manuals.
5.3 Afterall applicable sections of the checklist have been completed; the originator will forward to the Warranty
Department atthe folowing address:
Cameron Comprossion Systems
16260 Port Northwest
Houston, Texas 7044
Attention: Superior Warranty Department
5.4 The checklist wil be reviewed and filed in the Warranty Department job file, Compressor warranty coverage
is based on the correct completion and the return ofthis Superior Start-up Checkist to the aforementioned
address,
- This indicates locaton of most current revisions
This document contains proprietary and confidential InfSghallen of Cameron and must be used stiletly In accordance with the limited
for which twas submited. Any uso of his docu expressly pronibited.
‘Submitted & Enginegring Approval: ing pases
conbent— son
7 Patrick Melkus
Original issue Date: | Reissued: Rev. NO: ECO No Engineering Std No:
o2niart999 10/18/2011 _ 04 (2612369 ES 30
EPLEZZOEIEL 4 91ZG/-dVS Wd BT
oars) ze MoZ/i/TL@ CAMERON PROCESS & COMPRESSION SYSTEMS
~ ENGINEERING STANDARD E820 Rev 04
Pago 2 0f9
tee eeCGin las aes key seo
Nae The equpmentopravon ana mlaranca mans stove evi i det fre panna ary posed &
inapestons. Allwarrings, cautions, ard notes shoud a throughly understood & obsoned
[Bate Packager Shiapot
Tse Location
Name of Person (6) fil
tunijob nur
Throw congue
Gylindartvow
| if Tandem CE
if Tandem HE
Cylinder throw 2
WTandom CE
i Tandem HE
| cvinder tow #9 fa :
i Tandem CE
ICTandom HE
Cylinder throw aa i ;
if Tandem CE t
W Tandem HE
ylinder town
ifTandon CE
irandan HE
Cylinder row H6
if tandem CE
It Tandem HE |
SEN es Le
‘Gas Compressed:
‘Compressor application:
Sa Shean, et)
Abin opm -| +c | ste toaton ran ‘ve
ao
SUPERIOR
zee MeZ/i/11@ camMeERON PROCESS & COMPRESSION SYSTEMS
ENGINEERING STANDARD ES30 Rev 04
Pago 3 0f 9
[RRS esa ROOT
‘Type of foundation | Type of cylinder supports
Type grout used Sandicemont Scere
Concrete foundation chipped | yos
All piping property aligned Unit leveled
Piping install
a ptor to pre
outalgnment
All anchor bolts snug ae
| Pre-grout coupling alignment
Compited?
PACKAGING CHECK LIST
Have bottles and scrubbers been cleaned to remove internal debris?
_PACKAGERICONTRACTOR RESPONSIBLILTY i
Piping and bottles properly eupportea? PACKAGERICONTRACTOR
RESPONSIBLILTY :
Has all package and fiid piping been propery desealed and cleaned?
‘Tackacreva backed off and hold down bolts torquod?
‘Coupling bolle torqued to specification? PACKAGERICONTRACTOR
| RESPONSIBLILTY —
Cold coupling alignment checked, adjusted and recorded on page 7 of 7?
sompreesor for soft foot and b-daloction (applicable
record data on page 7 and.
io allows on vents dlachargo ends
nation.
‘All and drain connaetions located at piping low points?
ibe pump serviced? if pnoumate: ar or gas
"around properly connected to ground?
All safety shields/guords and protective devices installed?
ave al piping and instrument lines beon blown clean to remove water, dit slag, |
i Poser sacar e
CCheckod all electrical connectors fr eoseness and proper installation? ‘
Teosened piping to and trom compressor to make sure no misaligment Botwaen
‘pling and compressorfcylinderis present.
‘Does driver rotation match the compressor rotor direction?
SUPERIOR”
s0a'dur-yeercezzObIEL4 91ZGC-a¥S Nd BItEztE 1az7I/11yuu
@ cameRON
fo
40,
"1
2
2B,
4
45,
416.
1m.
18.
19.
ren aCe Sar RU Res en el OULU}
SoC
SShortagos accounted for and installed?
Startup spares, instruction manuals and special fos been received?
“Torque bolts on cylinders, crosshead guides and ange
foundation torque and bottle
sponsibility
Piston end clearance checked, 18 crank end, 2/3 head end or standard?
Compressor valves cleen and Installed coracty? Pull and inspect one v
sacking glands centered on od and torqued?
{All compressor vents and drain lines plumbed per E837
Lube ol high temparature shutdown installed and set to manual's spec?
‘Lube oll ow prossure shutdown installed anc
‘control laval matches proscribed level insight gauge.
responsibilty
All gccubbere' dump valves set and working?
‘Alt enfty role val
teach stage, operational and vented to safe location?
vot?
40 mesh suction eereon Installed at suction scrub
Remote mounted lube ol fiter vented to remove ar trom titer?
Frame lubricating oll meets ES10027 Makelgrade,
coll meets £81002? Makoigrado
yndor and pact
led and working
| Hos brcaton stom noo shutdown ben in
sos durrporrceZzaelels 91260:
£819 and £8917 Frometo
igeextalle gaskot Joint torque valves aro packager
throwstt | Throws2 | Throw#s | Throws | Throw#s | Throw#s
HE He____ | HE He____ | HE, We
ce__ | ce__ ce___ | ce__ | ce__
Packing and crosshead gulde vent tines vented to safo location and open?
Frame claaned (no dit, ust or water) por E$28 and ES32 and filed with tube oll por ES10027
3 to manuals spac? Check to assure that
‘Grankceso olllvel controller set and supply Isolation valve opened? Packager
stalled, of corract pressure rating for ey. piping requirements for
PROCESS & COMPRESSION SYSTEMS
ENGINEERING STANDARD ES30 Rev 04
Page 4 of 9
avo per enh
por €80022
SUPERIOR”
-d¥8 He BHAI NOZ/1/1yuu
@ cameron
PROCESS & COMPRESSION SYSTEMS
fend aren
20
a.
2.
2.
24,
2,
2.
2,
2,
0.
o.
32
33.
ENGINEERING STANDARD ES30 Rev 04
Page 5 of 9
COMPRESSOR START-UP CHECKS-PRIOR TO STARTING
and has correct pressure
Has the FF eystem blowout (rupture diss) 3
rupture dis? Refer to lubrication schematic and service manu
FF lubricator box fled with proper oll? Makolgrada SAE 40,
drive fled with gear ol? Type worm gear Lube - 680
FF Lubricator 90°
FF lube system primed to remove all air rom system?
Have the FF lube pumps’ feed rates beon sot for maximum rate?
Crosshead gu
Sil packayore to use in calculating shimming requlrement fo Insure propor cylinder preload
linders and frame lovel with each other?
Grosshead to guide clearance checked and moots E819 or E8317 Record readings on page 7
of.
Crankshaft thrust clearance checked and meets £819 or £831? Clearanc
Refer to section of the Instruction manu
Connecting rad bump check performed and moots ES19 or ES21? Record readings on page 7
‘cheek torque on plston fod to crosshead nut to make sure Its tht?
‘Alarm and shutdowns set points and operation veritiod?
to section 7 of te Instruction manual
Has the recommends oll iter element boon instakod?
‘Does tubo olf systom have thermostat installod in clverting mode? Thermostat element
tomporatur rating refer to nameplate data on page 7 of 7.
‘Checked cylinder piston rod run out to meot E819 or E831? Record
‘Ave temperature and preseure gauges propery intalld to indicate system conditions? (ol
‘cooling & coolant, process 028)
Does all water cook rate wetor nas using coolest possible water?
packing have se
Checked all gas and alr utilities for correct pressure and loaks?
Js there an init compression gas fter Installed? Rating: ____mileron
Haye all compressor unloadors b
is compressor ube oll pressure being sansad at the dive end ofthe frame's lube oll header?
(Gais2, Wi, WH72, WO72, and WGE2 frames oll sonsad downstream of fie).
Js tore a gas suction control regulator?
Is there a vibration shutdown dovice mounted on compressor per E83016 and calibrated?
Is the frame's crankcase breather () clean?
Have alltines tothe compressor been blown out to remove dittrash from tine?
shimmed to pravent pull down of qulda? Excol sproed sheet has been sent to
$n tested fr proper operation? Do unloaders meet ESB001?
SUPERIOR”
SOs dYPLERLEZZOEIEL B1ZGL-d¥S We BT
re maz /1/tt@camMeERON
Me
ry
ry
Page 6 of
START-UP CHECK LIST
ENGINEERING STANDARD E830 Rev 04
PROCESS & COMPRESSION SYSTEMS
11
48,
19,
20.
n
2.
2.
24.
2.
2.
27.
Barred unit aver one complete revolution?
Prelubed compressor? Prelube pressure.
Purged compressor and piping of ar? (twice)
Checked for gas oaks?
Verified compressor can operate at start-up gas consitione wio failure? (varity start up conditions is
Uwithis safe operating coneltions?)
‘Verified compressor Is unloaded to enable the driver to start-up and come up toile speed?
‘Startad unit per customer's procedure?
Is tubo oll pressure prosent? Pressure: slg
(fator to manus for normal low pressure)
[Any strange nolses or shaking inthe compressor?
Check made forlubricant, coolant,
fs distribution block cycle counter counting?
{Mnot reseive probiom
‘Ave the scrubbers high level shutdowns and dumps functioning?
‘Ave sorubbers removing liquids?
Dump cyete imo:
‘Checked aftr 15 minutes of operation for abnormal temperatures at all bearing housings? (should be
‘done before loading as.)
Hot bearings corrected?
snd gas leaks? Correct any losks?
‘Checked lube ol fiers ctforanta! prossuros? Change iter if necessary per E4027,
/9 compressor rod packing vents blowlngMhot due to packing leakago? (ater toad)
Ff ube pumps food rates sot for broak in rato check manual fr rate?
‘Compressor load curves matching engine load curve and flow mete
Has customerloperator been shown how to load and operat the compressor?
Have star-up instructions forthe other package equipment been followed
CCheckod al control panel functions by tripping or dlsconnecting the proper end devices?
Have the discharge gas tomperature alarms been set at 16 degroe {and shuldowns at 26 degree f above
normal operating temporatsros?
Has the overspeed shutdown boon
51? Speed setting rom.
's gas supply clean and rae of dirt, send, ote?
‘Check coupling alignment - warm
‘check cylinder supports - warm
SUPERIOR?
sds'drpoEPLbZzBBIELA B1ZGL-d¥S. Wd SEZ
re MOZ/1/1@ CAMERON PROCESS & COMPRESSION SYSTEMS
ENGINEERING STANDARD ES30 Rev 04
Page 7 of §
OPERATING CONDITIONS AT STARTUP:
PE)
2ND Sta, RD STG
aTHSTG STHSTC
4sT S16.
LOAD conoiTions:
SUCTION PSIG
DISCHARGE PSIG
SUCTION TEMP F
DISCHARGE TENP F
VW POCKET SETTING (inches)
UNLOADERS HEICE
CYL. INACTIVE END
‘COMMENTS:
COUPLING ALIGNMENT CHECKS
COUPLING COLD ALIGNMENT: Face Rim
(INCHES)
‘COUPLING HOT ALIGNMENT:
(INCHES) =
CLLR CULE Mn OLGA nce mnie siokce!
SUPERIOR®
40d dur-yorrLOzZObIETS 91Z6L-d¥S Ma BI
mez@cameRON
amp SOFT FOOT READINGS
>
PROCESS & COMPRESSION SYSTEMS
ENGINEERING STANDARD ES30 Rev 04
Page 8 of 9
Top
view
CRITICAL BASELINE TEMPERATURE READINGS AFTER 2 HOURS OF CONTINOUS LOADED OPERATION:
oo
Rees)
MAIN BEARING CAP:
‘CONNECTING ROD:
‘CROSSHEAD BUSHINGIPIN:
PISTON Rt
VALVE CAP TEMPERATURES:
Ambient Temp:
Throw 1
Suction
| Discharge
Packing Vent Line
cE:
Crank
End
ene)
RICE MMO
AE: De:
Auxillary Drive
End End
Throw 2
Suction
Discharge
ERIOR”
zie WOZ/I/
SUP!
se'dwYpbEPLEZzOBIELA BIZGL-avS Nd BT@ CAMERON PROCESS & COMPRESSION SYSTEMS
ENGINEERING STANDARD ES30 Rev 04
Page 9 of 9
Throw 3 Throw 4
Suction Suction
Discharge oa Discharge
Packing Vent Line Packing Vent Line
Throw 5 Throw 6
‘Suction
Discharge
Packing Vent Line Packing Vent Line
Signature of Technician Completing Report:
cre ‘Signature = a Date: Hie
Revision History
Letterhead changed to incorporate Cameron logo, contact information was updated
and baseline temperature measurements were added
Update to current Engineering Standard template, Removed (if shimmed) from item 7
of Packing Check list. For Compressor Start-Up Checks - Prior to Starting, per ES19
and ES31 was added to item 3, per ES3 was added to item 7, per ES28 and ES32
‘was added to item 9, KENCO was removed from item 11, per ES1002 was added to
item 17, per ES1002 was added to item 18, per ES1002 was added to item 19, per
ES19 and ES31 was added to item 26, per ES19 and ES31 was added to item 27,
connecting rod bump check was added as item 29, per ES 19 and ES31 was added to
item 33, per ES6001 was added to item 38, per ES3016 was added to item 41. For
Start-Up Check list, per ES 4027 as added to item 16. Removed (if shimmed) from
Criticle Compressor Clearances table. Added connecting rod bump check to Criticle
‘Compressor Clearance table. Added soft foot readings diagrams.
SUPERIOR®