Current Land Use
1.Land use changes DIRECT NEGATIVE 1 5 5 NS
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
8.Loss of property,
SC, E, BC NORMAL Land occupation DIRECT NEGATIVE 3 3 9 S
productive land or assets
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
All and
25.Covid‐19 and other
Subproject DIRECT NEGATIVE 3 5 15 S
diseases spread
implementation
Unawareness or disregard of
26.Risk of fall in open
E the population towards the INDIRECT NEGATIVE 3 5 15 S
trenches
project
Hiring of workers among the 27.Employment of
DIRECT NEGATIVE 3 5 15 S
local community child labour
Influx of construction 28.Decrease in school
Subproject workers to the intervention DIRECT NEGATIVE 3 5 15 S
attendance
implementation
Unawareness or disregard of 29.Damages and
the population towards the blockages by local DIRECT NEGATIVE 3 5 15 S
project communities
Employment Opportunities
Subproject 30.New job
DIRECT POSITIVE 5 5 25 S
implementation opportunities
Hiring of local and influx
Subproject workers 31.Unmotivated
implementation DIRECT NEGATIVE 3 5 3 S
NORMAL workers
and SA
Subproject Influx of construction 32.Conflict between
implementation workers to the intervention local workers and DIRECT NEGATIVE 3 1 3 NS
and SA area foreign ones
Influx of construction
Subproject 33.Business
NORMAL workers to the intervention DIRECT POSITIVE 3 5 15 S
implementation opportunities
area
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
Influx of construction
Subproject 36.Increased gender‐
NORMAL workers to the intervention INDIRECT NEGATIVE 3 5 15 S
implementation based violence
area
OPERATION PHASE
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
42.More access to
DIRECT NEGATIVE 5 5 25 S
water for more
43.Greater availability
DIRECT NEGATIVE 5 5 25 S
of safe water
45.Better prevention
DIRECT NEGATIVE 5 5 25 S
of Covid‐19
46.Improved hygiene
DIRECT POSITIVE 5 5 25 S
conditions
50.Reduction in
DIRECT NEGATIVE 3 3 9 S
neighbours conflicts
52.Household
DIRECT POSITIVE 3 5 15 S
activities made easier
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
53.Entrepreneurship
DIRECT POSITIVE 3 3 9 S
opportunities
54.Income increase
DIRECT POSITIVE 3 3 9 S
for families
55.Reduced
DIRECT POSITIVE 1 3 3 NS
household expenses
56.Increased school
DIRECT POSITIVE 3 3 9 S
attendance
58.Costs Reduction
DIRECT POSITIVE 3 3 9 S
for public institutions
59.Improved quality
DIRECT POSITIVE 3 5 15 S
of public service
60.Improved quality
of healthcare in DIRECT POSITIVE 3 5 15 S
hospitals
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
62.Loss of businesses
in water alternative DIRECT NEGATIVE 3 5 15 S
sources
63.Greater availability
of water for DIRECT POSITIVE 3 5 15 S
businesses
Water supply to new
Operation NORMAL 64.Costs reduction for
communities’ households DIRECT POSITIVE 3 3 9 S
businesses
65.Improved
DIRECT POSITIVE 3 3 9 S
hygiene/working
66.Better image of
DIRECT POSITIVE 3 3 9 S
service quality
EASM
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation
Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.
(1)
Activities during construction
SC ‐ Site Clearance
E – Excavation
PLC ‐ Pipe Laying and Connection
BC ‐ Backfilling and Compaction
PT ‐ Pressure Tests
F ‐ Formwork
C – Concrete
I ‐ Installation of Valves
P ‐ Pavement Cut and Repair
SA ‐ Support Activities(Resources transport, back office, workers domestic activities, etc)
All – All the above activities
Subproject implementation – Impact from the project itself, not from specific activity(ies) (eg.influx of new people to community, etc)
(2) Operational Situation - May be under normal operating conditions (Normal) or in emergency or accident situations (Accidental).
(3) Direct impact when it occurs at the place of performance or directly caused by the environmental or social aspect, or Indirect when it occurs elsewhere or as an indirect consequence of the
aspect
(4) Significance - Depends on the outcome of the assessment: Significant (S) or Non-significant (NS) Environmental or Social Impact.