IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

DIRECT / ENVIRONMENTAL & SOCIAL ASSESSMENT


ACTIVITY / OPERATIONAL ENVIRONMENTAL & SOCIAL ENVIRONMENTAL & POSITIVE/ SIGNIFICANCE
(1) (2) INDIRECT (4)
PHASE SITUATION ASPECT SOCIAL IMPACT (3) NEGATIVE
ACTION CONSEQUENCE LIKELIHOOD TOTAL

CONSTRUCTION PHASE
Current Land Use
1.Land use changes DIRECT NEGATIVE 1 5 5 NS

2.Soil erosion or flooding DIRECT NEGATIVE 3 5 15 S


SC, E, BC Land occupation

3.Landscape changes DIRECT NEGATIVE 1 3 3 NS

NORMAL 4.Constraints of access to


INDIRECT NEGATIVE 3 5 15 S
private homes
Changes in traffic /
5.Constraints of access to
interdiction to circulation in INDIRECT NEGATIVE 3 5 15 S
workplaces
some streets
6.Constraints in internal
SC, E, PLC, BC, DIRECT NEGATIVE 3 5 15 S
circulation
PT, IV, PCR
Preventive and programmed
service and infrastructure
NORMAL
disruption (energy, 7.Disruption of services
telecommunications, roads) DIRECT NEGATIVE 3 5 15 S
and infrastructures
Energy or
NORMAL telecommunication cable
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

8.Loss of property,
SC, E, BC NORMAL Land occupation DIRECT NEGATIVE 3 3 9 S
productive land or assets

Consumption of resources and consequent pollution


Water Consumption
Materials consumption
(social and administrative 9.Waste and wastewater
infrastructures, and INDIRECT NEGATIVE 3 5 15 S
NORMAL generation
construction)
Fuel and lubricants
consumption
Resources consumption
10.Soil and Water
Spill of hazardous chemicals INDIRECT NEGATIVE 3 5 15 S
All ACCIDENTAL contamination
(or fuel)
11.Potential overload of
Water Consumption water resources use in DIRECT NEGATIVE 3 5 15 S
the city
12.Possible overload of
NORMAL Construction materials
raw materials use in the DIRECT NEGATIVE 3 5 15 S
consumption
city
Fuel and lubricants 13. Possible overload of
DIRECT NEGATIVE 3 5 15 S
consumption hydrocarbons use
Air pollution

Fuel and lubricants


SC, E, BC, PCR, 14.Air contamination
NORMAL consumption DIRECT NEGATIVE 3 5 15 S
SA in working sites
Dust emission
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

15. Air contamination


F DIRECT NEGATIVE 3 3 9 S
in the yard

Risk of noise and vibration


16.Local disturbance /
discomfort from noise
All DIRECT NEGATIVE 3 5 15 S
and vibration in
NORMAL Noise and vibration working sites
17.Local disturbance /
F discomfort from noise DIRECT NEGATIVE 3 3 9 S
and vibration in yard
Community welfare and workers, health and safety
Unawareness or disregard of
All ACCIDENTAL the population towards the 18.Accident risks DIRECT NEGATIVE 3 3 9 S
project
19.Dust‐related
SC, E, BC, SC Dust emission DIRECT NEGATIVE 3 3 9 S
health problems
Influx of construction
Subproject 20.Intolerance or
workers to the intervention DIRECT NEGATIVE 3 3 9 S
implementation NORMAL hostility
area
Subproject Hiring of local and influx 21.Work accidents or
DIRECT NEGATIVE 5 3 15 S
implementation workers occupational illnesses
Resources consumption 22.Health risks caused
All DIRECT NEGATIVE 3 3 9 S
ACCIDENTAL Spill of hazardous chemicals by solid waste
Subproject 23.Competition for
DIRECT NEGATIVE 1 3 3 NS
implementation Influx of construction social and health
NORMAL
Subproject workers to the intervention 24.Increased spread
DIRECT NEGATIVE 3 5 15 S
implementation of HIV/AIDS
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

All and
25.Covid‐19 and other
Subproject DIRECT NEGATIVE 3 5 15 S
diseases spread
implementation
Unawareness or disregard of
26.Risk of fall in open
E the population towards the INDIRECT NEGATIVE 3 5 15 S
trenches
project
Hiring of workers among the 27.Employment of
DIRECT NEGATIVE 3 5 15 S
local community child labour
Influx of construction 28.Decrease in school
Subproject workers to the intervention DIRECT NEGATIVE 3 5 15 S
attendance
implementation
Unawareness or disregard of 29.Damages and
the population towards the blockages by local DIRECT NEGATIVE 3 5 15 S
project communities

Employment Opportunities
Subproject 30.New job
DIRECT POSITIVE 5 5 25 S
implementation opportunities
Hiring of local and influx
Subproject workers 31.Unmotivated
implementation DIRECT NEGATIVE 3 5 3 S
NORMAL workers
and SA
Subproject Influx of construction 32.Conflict between
implementation workers to the intervention local workers and DIRECT NEGATIVE 3 1 3 NS
and SA area foreign ones

Business opportunities for local communities

Influx of construction
Subproject 33.Business
NORMAL workers to the intervention DIRECT POSITIVE 3 5 15 S
implementation opportunities
area
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

34.More clients for


DIRECT POSITIVE 5 5 25 S
local businesses
35.Establishment of
more commercial DIRECT POSITIVE 3 5 15 S
businesses
Risk of GBV, SH and SEA

Influx of construction
Subproject 36.Increased gender‐
NORMAL workers to the intervention INDIRECT NEGATIVE 3 5 15 S
implementation based violence
area

OPERATION PHASE

Consumption of resources and consequent pollution


37. Possible
overexploitation of the DIRECT NEGATIVE 5 5 15 S
NORMAL water sources

38. Possible overload


DIRECT NEGATIVE 3 3 9 S
in water consumption
ACCIDENTAL Water supply to new 39.Possible overload in
Operation
communities’ households water resources from DIRECT NEGATIVE 3 3 9 S
leaks of water
40.Increased volume
NORMAL DIRECT NEGATIVE 3 5 15 S
of waste water
41. Soil and water
DIRECT NEGATIVE 3 5 9 S
contamination
Community welfare, health and safety
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

42.More access to
DIRECT NEGATIVE 5 5 25 S
water for more
43.Greater availability
DIRECT NEGATIVE 5 5 25 S
of safe water

44.Health benefits DIRECT NEGATIVE 5 5 25 S

45.Better prevention
DIRECT NEGATIVE 5 5 25 S
of Covid‐19

46.Improved hygiene
DIRECT POSITIVE 5 5 25 S
conditions

47.Increased comfort DIRECT NEGATIVE 5 5 25 S


Water supply to new
OPERATION NORMAL 48.Reduction of time
communities’ households DIRECT NEGATIVE 5 5 25 S
and walking distance
49.Reduced stress of
waking up to fetch DIRECT POSITIVE 3 5 15 S
water

50.Reduction in
DIRECT NEGATIVE 3 3 9 S
neighbours conflicts

51.More free time for


DIRECT NEGATIVE 3 5 15 S
women

52.Household
DIRECT POSITIVE 3 5 15 S
activities made easier
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

53.Entrepreneurship
DIRECT POSITIVE 3 3 9 S
opportunities

54.Income increase
DIRECT POSITIVE 3 3 9 S
for families

55.Reduced
DIRECT POSITIVE 1 3 3 NS
household expenses

56.Increased school
DIRECT POSITIVE 3 3 9 S
attendance

57.Better hygiene and


DIRECT POSITIVE 3 3 9 S
work environment

58.Costs Reduction
DIRECT POSITIVE 3 3 9 S
for public institutions

59.Improved quality
DIRECT POSITIVE 3 5 15 S
of public service

60.Improved quality
of healthcare in DIRECT POSITIVE 3 5 15 S
hospitals

61.Cleaner schools DIRECT POSITIVE 3 5 15 S

Businesses opportunities for local communities


IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

62.Loss of businesses
in water alternative DIRECT NEGATIVE 3 5 15 S
sources
63.Greater availability
of water for DIRECT POSITIVE 3 5 15 S
businesses
Water supply to new
Operation NORMAL 64.Costs reduction for
communities’ households DIRECT POSITIVE 3 3 9 S
businesses
65.Improved
DIRECT POSITIVE 3 3 9 S
hygiene/working
66.Better image of
DIRECT POSITIVE 3 3 9 S
service quality

EASM

67. Larger Network DIRECT POSITIVE 3 5 15 S

68. More clients / DIRECT POSITIVE 5 5 25 S


69. Increased water
INDIRECT POSITIVE 5 5 25 S
supply
Water supply to new 70. Minimised water
communities’ households – INDIRECT POSITIVE 3 5 15 S
Operation NORMAL shortages
Expansion of network
71. Improved financial
INDIRECT POSITIVE 3 5 15 S
self‐sufficiency
72. Empowerment of
EASM INDIRECT POSITIVE 3 3 9 S

73. Illegal connections INDIRECT NEGATIVE 3 3 9 S


IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

74. Theft of water


INDIRECT NEGATIVE 3 3 9 S
supply materials

75. Breakage of water


supply facilities by INDIRECT NEGATIVE 5 3 15 S
vandalism
76. Low number of
home connection INDIRECT NEGATIVE 3 1 3 NS
contracts

77. Low payment


INDIRECT NEGATIVE 3 3 9 S
rates of water tariffs
78. Service
interruption / INDIRECT NEGATIVE 3 5 15 S
cancelation of
79. System
breakdowns / service INDIRECT NEGATIVE 5 3 15 S
interruptions
IDENTIFICATION OF ASPECTS & ASSESSMENT OF ENVIRONMENTAL AND SOCIAL IMPACTS

Employer: Ministry of Energy and Water – National Directorate of Water Supply and Sanitation

Contract: DESIGN AND CONSTRUCTION OF NETWORK AND HOUSE CONNECTIONS IN THE CITY OF MALANJE
Contractor: Jiangsu Geology & Engineering Co., Ltd.

(1)
Activities during construction
SC ‐ Site Clearance
E – Excavation
PLC ‐ Pipe Laying and Connection
BC ‐ Backfilling and Compaction
PT ‐ Pressure Tests
F ‐ Formwork
C – Concrete
I ‐ Installation of Valves
P ‐ Pavement Cut and Repair
SA ‐ Support Activities(Resources transport, back office, workers domestic activities, etc)
All – All the above activities
Subproject implementation – Impact from the project itself, not from specific activity(ies) (eg.influx of new people to community, etc)
(2) Operational Situation - May be under normal operating conditions (Normal) or in emergency or accident situations (Accidental).

(3) Direct impact when it occurs at the place of performance or directly caused by the environmental or social aspect, or Indirect when it occurs elsewhere or as an indirect consequence of the
aspect

(4) Significance - Depends on the outcome of the assessment: Significant (S) or Non-significant (NS) Environmental or Social Impact.