Part 3: Equipment’s / Tools to be used: Winch machine, Rigging accessories & Hand Tools
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location
Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard identified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Lifting, Shifting & Installation and storage of Pipes Inside Tower 2 all floors
Step# Describe Job Step Potential Hazards Hazard Controls
1 Mobilization of equipment & Involvement of unskilled personnel Trained & skilled staff to be authorized for
Materials job
Unauthorized/
Obtain relevant permit before
uninspected
vehicle/equipment entry in the area
equipment/tools at site
Ensure use of appropriate PPE’s on site
Personnel/Structures hit by
Equipment/Heavy Vehicle JSA Briefing to all of workforce involved
Damaging to drains/culverts beside Deliver tool box talk to all of vehicles
roads drivers & operators
Striking of vehicles with Banks man should be available at site
structure/overhead live lines Be careful about nearby drains/culverts
Personnel injury / property damage while vehicle movement on roads
Keep away all unauthorized people during
movement of heavy vehicle/equipment
Do not left un attendant any of
equipment/tool in the area
Ensure Close HSE monitoring
/Supervision
Flame arrestor to be installed in vehicles
2 Lifting, Shifting and storage of Pipes Uncertified Operator, operator should be certified
Inside Tower 2 All floors. Unauthorized personnel involvement Banks man/signal man should be available
at site to control the movement of heavy
vehicles/equipment
Place Winch machine at levelled &
compacted ground surface
Keep away all unauthorized people during
movement of heavy vehicle/equipment
Ensure Close HSE monitoring
/Supervision
JSA No: JOB TITLE: Lifting, Shifting & Installation and storage of Pipes Inside Tower 2 all floors
Step# Describe Job Step Potential Hazards Hazard Controls
Sling broken, load drop Ensure proper & inspected
Miscommunication/signal error accessories being used for lifting
operation
Ensure that load is properly placed &
lifted
Ensure proper communication
between rigger/signal man & operator
Keep away during Winch machine
operation
Swing area should properly barricaded
Slip, Trip & fall Ensure proper stacking of all materials
at site
Keep access/walk ways always clear from
any obstruction
Ensure proper housekeeping of workplace
all the time
Inclement weather condition Stop Winch machine work in case of
any inclement weather conditions (Rain,
storm, fog etc.)
Restrict movement of heavy
vehicles/equipment’s in
rain/fog
Fire & explosion Ensure availability of inspected fire
extinguishers at site
Flame arrestor to be installed in all
vehicles/equipment’s
3 Storage of Pipes Inside Tower 2 all Personnel hand injury while handling Ensure Involvement of skilled labour
floors with units, Ensure use of proper PPE’s
People under suspended load, Deliver TBT before commencing work
Unbalancing of load while holding it Ensure use of inspected & colour coded
hand tools & rigging accessories
Area should be properly barricaded during
lifting operations
Restrict unauthorized movement
JSA No: JOB TITLE: Lifting, Shifting & Installation and storage of Pipes Inside Tower 2 all floors
Step# Describe Job Step Potential Hazards Hazard Controls
Improper signalling during lowering of Ensure proper communication between
units. rigger/signal man & operator
Rigger/signal man should wear vest
Inappropriate PPE’s/Tools Use of appropriate PPE’s during unloading
Ensure use of inspected tools for the right
job
Use tag line to control the load
Personnel impact injury
Availability of fresh water at site
First aid box should be in place at site
4 Working at night shift hours Poor visibility at night hours Ensure proper lighting arrangement for
late night working hours
Vehicles/equipments hit with people, Careful movement of vehicles in night
equipment or structure hours
Place refection tapes at hard barriers,
structures
Banks men should worn high visibility
reflection vests
Slip , trip & fall No working should be allowed in poor
lighting conditions
Ensure proper housekeeping to avoid
tripping