Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DD 0+285.

00

DD 0+295.66

DD 0+300.76
(Weight of water)

EL.452.00 EL.452.00 Retained structural fill Mechanically woven double twisted hexagonal wire mesh

(Q = 3230m³/s) Existing material

Fr
DD 0+280.00

EL.440.00

C
Non - woven geotextile
C2 concrete

Insitu soil

GB Width
CONTROL POINT COORDINATES
POINT NORTH (m) EAST(m)

C 8245082.1851 663593.6880
CLIENT

D 8245130.7530 663615.5188

Notes: KAFUE GORGE LOWER HYDROPOWER PROJECT


1. The elevations are in mm. CONTRACTOR
SINOHYDRO CORPORATION LIMITED
2. Detailed notes on sheet 3 of 3.
3. Gabion unit structure to be tilted at 6° towards the heel for more stability. Section 1-1 DWG NAME

GABION BOXES SUPPORT DRAWINGS OF PLUNGE POOL


SCALE 1:100
REV. :
A JC HM SHI YAN For Approval 2023-09-29 DWG No. KGL-DD-CI-05-04-003(A)-A SHEET 3 OF 3 A
Rev. Prep. Check Appro. Modification Date

You might also like