This document outlines good safety practices for various construction activities including:
- Hoarding, piling machines, shoring, and excavations must be constructed according to requirements and designs.
- Cranes, hoists, and lifting equipment require certification, inspection, supervision, and designated signal persons.
- Temporary works like scaffolds, formwork, and gondolas must be designed and constructed properly, inspected, and have fall protection.
- Hazardous materials and equipment need to be stored, handled and used correctly with proper signage and protection measures.
- Work areas should be kept clean, hazards protected, and adequate ventilation and lighting provided.
This document outlines good safety practices for various construction activities including:
- Hoarding, piling machines, shoring, and excavations must be constructed according to requirements and designs.
- Cranes, hoists, and lifting equipment require certification, inspection, supervision, and designated signal persons.
- Temporary works like scaffolds, formwork, and gondolas must be designed and constructed properly, inspected, and have fall protection.
- Hazardous materials and equipment need to be stored, handled and used correctly with proper signage and protection measures.
- Work areas should be kept clean, hazards protected, and adequate ventilation and lighting provided.
This document outlines good safety practices for various construction activities including:
- Hoarding, piling machines, shoring, and excavations must be constructed according to requirements and designs.
- Cranes, hoists, and lifting equipment require certification, inspection, supervision, and designated signal persons.
- Temporary works like scaffolds, formwork, and gondolas must be designed and constructed properly, inspected, and have fall protection.
- Hazardous materials and equipment need to be stored, handled and used correctly with proper signage and protection measures.
- Work areas should be kept clean, hazards protected, and adequate ventilation and lighting provided.
This document outlines good safety practices for various construction activities including:
- Hoarding, piling machines, shoring, and excavations must be constructed according to requirements and designs.
- Cranes, hoists, and lifting equipment require certification, inspection, supervision, and designated signal persons.
- Temporary works like scaffolds, formwork, and gondolas must be designed and constructed properly, inspected, and have fall protection.
- Hazardous materials and equipment need to be stored, handled and used correctly with proper signage and protection measures.
- Work areas should be kept clean, hazards protected, and adequate ventilation and lighting provided.
Hoarding constructed accordance with Commissioner of
Building Control requirements. Piling Machine • Inspected by Approved person • Daily inspection by designated person • Warning sign provided • Footing in sound condition Shoring constructed in accordance to P.E. design for excavation of more than 1.5 metre with the use of mechanical digger Shoring constructed in accordance to P.E. design for excavation of more than 4.0 metre. Open side of excavation more than 3 metre depth guarded by adequate barricade Valid LM certificate Daily check by crane operator Lifting Supervisor supervising lifting operation Rigger and signalman appointed for lifting operation Material/passenger hoist
Hoist operated by authorized person
Worksite to be kept clean and free from effluents, nuisances and conditions that can be detrimental to the workers and Public health Materials neatly stacked in safe and orderly manner Temporary material platform constructed and installed in accordance to PE design. Generator With Bund Wall Generator fenced off against unauthorized use. Main distribution board and switch gear Checked and tested monthly by LEW DIESEL STORAGE WITH SIGNAGES AND PROVISION OF BUND WALL. Tower crane base barricaded with warning sign. Free of water and obstructions. Crawler Crane access laid with steel plate Crane access properly constructed and weekly check carried out Scaffold erected in accordance to P.E. design. Working platform at alternate lift. Overlay or screen netting envelope scaffold Base plate secured to sole plate and on solid ground
Scaffold stair provided
access to working platform Working platform closely decked and continuous with toe board and guardrails Signboard showing maximum loads Oxy-acetylene cylinders kept upright in wheeled trolley
Gas cylinder fitted with
regulating valve and flashback arrestor A worker anchored to a safety belt and an independent lifeline when working on a gondola. Materials on gondola are evenly distributed Peripheral overhead shelter erected around the building Overhead shelters erected at every point of entry/exit of buildings Formwork checked before, during and after concreting by formwork supervisor Formwork shall be design by P.E. where the ceiling height exceed 9.14 metres P.E. shall be responsible for the supervision of the construction and stability of the structure. All openings are closed barricaded or effectively protected Lift opening effectively barricaded Lifting operation Large bin at lower end of each chute Storage of material 610 mm away from edge of building Adequate ventilation provided at work area
Exhaust fan provided to
remove dust particle generate from grinding Safety harness