Summary of Required Reinforcement

Culvert with Lifting Lug of


Reinforcement Weir (kg) Culvert & Concrete Block for
Sr.No. Outfall (kg)
(mm)
A B
1 8mm
2 10mm
3 12mm 2,886.21
4 16mm 63,657.23
5 25mm 437.70
Weigh Bridge, Tent Foundation, Total Quantity Total With Order Quantity (kg) through
Wastage 5%
Site Entrance Precast Slab (kg) Wastage (kg) (SHAFA/NPS/ADV/MRF-0058)

C D=A+B+C E F=D+E G
240.31 240.31 12.02 252.32 500
339.84 339.84 16.99 356.84 500
714.26 3,600.47 180.02 3,780.50 1000
659.50 64,316.73 3,215.84 67,532.57 1000
437.70 21.89 459.59 0
TOTAL QUANTITY (KG) 72,381.80
Balance
Quantity To
order (kg)
H=F-G
0
0
2,780.50
66,532.57
459.59
69,772.65