Professional Documents
Culture Documents
LC34-e-DAS GAD-2021 03 05 - 2 LANE-R1
LC34-e-DAS GAD-2021 03 05 - 2 LANE-R1
REWALL
REWALL
START
START
P1 P2
OVERALL LENGTH OF COMPOSITE STEEL GIRDER 36900(SK)
[35954(SQ)] 12300 WIDTH OF BRIDGE 400 TO EXECUTION OF WORK
80
500 500 500 1500 300
C/C OF BEARING 36000(SK) 500 CLEAR CARRIAGE WAY 8500
FOOTPATH 120 120
[35077(SQ)]
PEDESTAL WITH POT FINISHED ROAD LEVEL FINISHED ROAD LEVEL
FINISHED ROAD LEVEL NOTE:-
TO TILAK PUTLA A PTFE BEARING CRASH BARRIER
LVL.+298.486M TO NAGPUR HIGHWAY
LVL.+298.623M LVL.+298.486M
80 80
(@ THE END OF CARRIAGEWAY)
80
SLOPE 1:30 BEARING - 350x750
36
80MM WEARING COAT @ LOWEST GIRDER OF CARRIAGEWAY SLOPE 1:30 2.5% 2.5%
1) ALL DIMENSIONS ARE SHOWN IN MM AND LEVELS ARE IN METER UNLESS OTHERWISE MENTIONED.
PEDESTAL -650x1050 50mm E.J.
2) NO DIMENSION SHALL BE SCALED FROM THE DRAWING. ONLY WRITTEN DIMENSIONS SHALL BE
SOFFIT LVL.+296.525M
FOLLOWED.
1881
PIER CAP TOP 3) THE TYPE AND DIMENSIONS OF FOUNDATION AND SUBSTRUCTURE SHOWN IN THE DRAWING ARE
RDSO DRG.No. RDSO / B -11775 2500 2500 2500 2500 LVL.+296.025M
INDICATIVE AND MAY VARY AS PER ACTUAL DESIGN.
INSPECTION LADDER 12 MACHINE FIT 4) ALL THE DIMENSIONS SHOWN SHOULD BE VERIFIED AS SITE BEFORE TAKING UP DESIGN WORK IN
1200
11500 5) NO WORK SHOULD BE STARTED TILL, DESIGN (PROOF CHECKED). AND DRAWING WITHIN RAILWAY
PIER CAP TOP
1881
INSPECTION PLATFORM LVL.+296.025M PORTION ARE APPROVED BY RAILWAY.
600
8511
RAILWAY BOUNDARY
6) DESIGN CRITERIA IS BASED ON FOLLOWING CODES :
EXISTING NARROW
1581
1500
RAILWAY BOUNDARY
ELASTOMERIC BEARING
C.L.OF FUTURE
C.L.OF FUTURE
C.L.OF FUTURE
TRACK-1 (B.G.)
TRACK-2 (B.G.)
TRACK-3 (B.G.)
230849 238317
PEDESTAL WITH POT 160 160 BOTTOM 80MM NOT a) IRC: 5-2015
6946(SK) 8 TO BE WELDED. NOT
ELASTOMERIC BEARING
6550
6550
1750 [6768(SQ)] 1750 REWALL BEARING - 350x750X149
5000
TO BE WELDED TO FLANGES
b) IRC: 6-2017
738
45
FORMATION LVL. +289.237M FORMATION LVL. +289.237M FORMATION LVL. +289.237M 875 9) EXPOSURE CONDITION IS MODERATE .
EXISTING G.L.+290.267M 10) ANGLE OF SKEW FOR SUPERSTRUCTURE - 13° (PARALLEL TO TRACK.)
FOOTING TOP LEVEL
LVL.+288.737M
FOOTING TOP LEVEL
LVL.+288.737M
SECTION OF COMPOSITE STEEL 11) ANGLE OF SKEW FOR FOUNDATION - 13° (PARALLEL TO TRACK.)
1800
1800
1800
4500 4500 9000
GIRDER 36M SPAN SCALE 1:20 12) MINIMUM VERTICAL CLEARANCE FROM RAIL LEVEL TO BOTTOM OF GIRDER SHOULD NOT BE LESS THAN
LOGITUDINAL SECTIONAL ELEVATION 'A-A' ( AS PER RDSO DRG.No. RDSO / B-11775)
AS PER IRSOD - 2004.
13) FOR INSPECTION AND MAINTENANCE OF BEARINGS, INSPECTION PATHWAY TO BE MADE AT THE LEVEL
SCALE 1:100 FOOTING BOTTOM LEVEL FOOTING BOTTOM LEVEL
LVL.+286.937M LVL.+286.937M OF PIER CAP AS PER RDSO STANDARD GUIDELINES BS-113.
CROSS SECTION OF PIER 14) PROTECTIVE SCREEN ON BOTH SIDE OF CARRIAGEWAY SHOULD BE PROVIDED AS PER RDSO
N
0 7800 CR
CH:5 STATIO
SSIN RER BG
CR DURING EXECUTION OF WORK.
ROW ROW ROW
P1 CR
18) NO CONSTRUCTION JOINTS SHALL BE ALLOWED IN CONCRETE WORK UNLESS IT IS SPECIFIED IN DETAIL
MP
ROW
m
ROW ROW ROW ROW
KM11
CR
SANDHU
87/500
3900
CR
ROW
DRAWINGS AS PER DESIGN CONSIDERATIONS.
CR
UM
G
CR
CR
CR 19) STRIP SEAL EXPANSION JOINTS SHALL BE PROVIDED AS PER LATEST MORTH STANDARDS.
CR
P2
NEW
CR
CR
20) MASTIC ASPHALT WEARING COATS OF THICKNESS 25MM OVER 40MM BITUMINOUS SHALL BE PROVIDED
RLY CR
CRO
.BO CR
CR
AS PER MORTH STANDARDS.
UND
CR
CR
CR
CR
ARY 21) EXCAVATION OF FOUNDATION SHALL BE DONE ONLY IN PRESENCE OF RAILWAY AUTHORIZED
NW
E
N
191 328
OUNDARY
6339 12 14 REPRESENTATIVES TO ENSURE THE SAFETY OF RUNNING TRAINS. PROPER PRECAUTIONS SHALL BE
W E
P
CR
HUM
CH:53 TAKEN DURING EXCAVATION OF FOUNDATION NEAR THE EXISTING RAILWAY TRACK. IF THE DEPTH OF
13° SKE 137 5 00m
02
D
W
SAN
6339
TO ITWARI
SRJ
SE
ALL
ALL
SW EXCAVATION IS MORE THAN 1M, PROPER SHORING AND SHUTTERING TO BE PROVIDED AS PER PARA
00
ANGLE ROW
T
T
/ UMRED
RAILWAY B
S
P1 P2
STAR
STAR
123
NO. 403 OF INDIAN RAILWAY BRIDGE MANUAL.
REW
REW
ROW
ROW
6339 22) FABRICATION WORKS SHOULD BE DONE FROM RDSO APPROVED FIRMS ONLY.
C/C BEARING 36000(SK)
C/C 23) THE LAUNCHING AND SHUTTERING DRAWING SHALL BE APPROVED BY CBE OF S.E.C RAILWAY.
BEA 6339
[35077(SQ)] RIN
TO TILAK PUTLA 1750 1750 [350 G 3 6 24) STRUCTURAL FABRICATION STEEL CONFIRMING TO IS: 2062 -2011,HSFG BOLT CONFIRMING TO
TO NAGPUR HIGHWAY 77(S 000(SK IS:4000-1992 , AND RDSO BS-111 (LATEST REVISION) SHALL BE FOLLOWED.
KM11
500500
CRASH BARRIER Q)] ) 87/400
900
RE WALL
SHY DISTANCE 25) PREFERABLY TWO GIRDERS SHALL BE LAUNCHED AT A TIME BY SUITABLE CRANE. IN CASE SINGLE
GIRDER IS LAUNCH DUE TO SITE CONDITION THEN CLAMPING ARRANGEMENT SURROUNDING THE
C.L.OF GIRDER
13° SKEW
ROW
PEDESTALS FOR LATERAL SUPPORT OF GIRDER TO BE MADE.
5300 7800 7800 ROW
2500
ANGLE RE WALL ROW
26) QAP AND WPSS TO BE PREPARED BY FABRICATING AGENCY AND APPROVED BY THIRD PARTY
(RDSO,RITES WRI OR ANY OTHER EXPERT PUBLIC SECTOR UNDERTAKING e.g. CEIL ETC).
27) S & T STAFF SHOULD BE INFORMED PRIOR TO START OF EARTH WORK.
C.L.OF GIRDER CH:53 28) ADEQUATE CARE SHALL BE TAKEN TO PROTECT EXISTING UNDERGROUND CABLES.
400m
RAILWAY BOUNDARY 32814(SK) 29) PRIOR INTIMATION SHOULD BE GIVEN TO ELECTRICAL , S & T DEPARTMENT BEFORE EXECUTION
2500
[31973(SQ)]
C/L OF CARRIAGEWAY /DISMANTLING WORK AT SITE.
RROW +290.281 M
'A' 1608(SK) 5668(SK)
8500
5439(SK) 8005(SK) 8005(SK) 5697(SK) 1578(SK) 'A' ENLARGE KEY PLAN
RY
30) ANY OVERHEAD WIRE FOR STREET LIGHTING PURPOSE ON POLES OVER THE ROB SHOULD BE
DA
[1566(SQ)] [5522(SQ)] [5300(SQ)] [7800(SQ)] [7800(SQ)] [5551(SQ)] [1538(SQ)]
6946(SK) SCALE 1:600 AVOIDED AND KEPT ASIDE THE CABLE TRAY TO PREVENT OHE BREAKDOWN DUE TO BREAKAGE OF
N
BROA 89.975M
12300
OU
C.L.OF GIRDER [6768(SQ)]
EL
OVERHEAD WIRE IN CASE OF STORM.
Y
URE
C.L.O -1 (B.G.)
B
NDAR
URE
C.L.O -3 (B.G.)
NDRY
EXIST TRACK LEV
AY
KM11 31) THE STRUCTURAL DRAWING AND DESIGN SHOULD BE PROOF CHECKED BY IIT/NIT BEFORE SUBMITTING
D
87/300
F FUT
W
2500
F FUT
+
AIL
AY BOU
.
TO RAILWAY.
L
URE
C.L.O -2 (B.G.)
K
ING NA
AY BOU
LV
K
TRAC
R
TRAC
32) JPO NO. SECR/S&T/POLICY/889, DATED 05.07.2013 FOR JOINT PROCEDURE FOR UNDERTAKING OF WORK
W
C/L P E TRACK
SED
F FUT
NDRY
ROW
NE
E
ROW
RAILW
G
RE WALL RE WALL
O
ROW
U
TRAC
C.L.OF GIRDER
RAILW
A
ROW
33) PROVISION OF S&T SUB ESTIMATE MUST BE KEPT IN MAIN ENGG. ESTIMATE .
RO
G
Y BOU
ROW
GAUG
ROW
I
ROW
34) TVU - 14370 AS ON SEPT -2018 AND CLASS OF LEVEL CROSSING - 'C' CLASS (MANNED).
↓↓↓
TO ITWAR
/ UMRED
ROW
2500
ROW
500500
ROW
↓
SHY DISTANCE ROW 35) NUMBER OF LANE - 02
TO NAGPUR HIGHWAY TO T
A
ROW
RAILW
CRASH BARRIER
ROW
ILAK 6.0 M
ROW
36) RDSO DRAWING NO. RDSO/B-11775 TO BE FOLLOWED FOR 36M SPAN.
ROW
PUTL WID
ROW
CH:5330
↓
ROW
A E SER
V
ROW 0m 37) OPEN FOUNDATION IS SHOWN IN THE DRAWING, HOWEVER TYPE OF FOUNDATION WILL BE DECIDED AT
1500
ROW
FOOTPATH ROW
WID ROA THE TIME OF APPROVAL OF STRUCTURAL DRAWING AND DESIGN.
D ROW
1400
ROW
E SE 2515 ROW
ROW RVIC 69 38) COLLECTOR CONSENT FOR CLOSING OF LC WILL BE TAKEN BEFORE EXECUTION OF WORK.
E RO ROW
5300 7800
↓
CRASH BARRIER ROW
AD ROW 7800
ROW
ROW P1
↓
ROW
00
300
ROW
KM1187/2
266
TO TILAK PUTLA
↓
C/C BEARING 36000(SK)
ROW
ROW
RLY
.BO
UND
P2 00
TEM ARY
↓
[35077(SQ)] P ROW 1911 328
14
ORA 2
TEM
Y
6339
TO BHIVAPUR
ROW
RY R
DAR
13° SKEW 137
02 POR
/NAGHBIR
6339
00
ANGLE
OAD ROW ROW
ARY LEGEND :
123
DIVE ROW 6339 ROW
ROA
OUN
RSIO
C/C
BEA 6339
ROW
D DI
↓
RIN
N [350 G 3600
77(S 0
ROW
VER
Q)] (SK)
SION
B
1. EXISTING WORK SHOWN IN BLACK.
↓
ROW
Y
ROW
WA
6.0 M ROW
↓
ROW
5300 7800 7800
2. PROPOSED ROB SHOWN IN RED.
ROW
00
WID
RAIL
ROW ROW
E SE
DRY
PLAN
258
↓
ROW ROW
Y BOUN
6.0 M
FUTURE TRACK 3
SCALE 1:100 ROW 5
WID 97
ROW
4. RAILWAY BOUNDARY
E SE TO N
FUTURE TRACK 2
ROW
FUTURE TRACK 1
W
RO
RV
ROW
AG 5. EXISTING RAILWAY N.G. TRACK TO BE DISMANTLE.
ROA PUR
ICE
RAILWAY BOUNDRY
W
RO
ROW
HIGH
↓
C/L OF PROPOSED BROAD
D
RAILWA
ROW
6. TEMPORARY WORK SHOWN IN GREEN
W
↓
W
RO
7. PROPOSED TRACK SHOWN IN RED
↓
ROW
↓
W
RO OWR
ROW ROW ROW ROW KM1187/100 8. SERVICE ROAD MOVEMENT SHOWN IN BLUE
PROPOSED CONSTRUCTION OF 2 LANE
W
RO
↓
CR
RO
W
RO
GAUGE
1187/3 (PROJECT CH. 53262M)
81 M
RO
W
RO
TRACK LEVEL+290.2
W
EXISTING NARROW
RO
W
FILLING
291.012M 0.000 M
291.816M 0.801 M
292.483M 1.468 M
293.150M 2.135 M
293.817M 2.802 M
294.484M 3.469 M
295.151M 4.136 M
295.818M 4.803 M
296.485M 5.470 M
297.152M 6.137 M
297.819M 6.910 M
298.486M 8.094 M
298.486M 7.816 M
297.819M 6.636 M
297.152M 5.917 M
296.485M 5.201 M
295.818M 4.486 M
295.151M 3.970 M
294.484M 3.568 M
293.817M 2.930 M
293.150M 2.263 M
292.483M 1.596 M
291.816M 0.929 M
289.955M 0.000 M
C/C OF BEARING 36900(SK)
/NAGHBIR
290.487 298.486M 7.999M
IN M
[35954(SQ)]
REWALL START
REWALL START
298.486M
ROAD TOP
LEVEL
CH:53100m KM1187/000
GROUND
CH. -251.569 291.012
291.015
291.015
290.909
290.392
289.237
290.670
291.183
291.235
291.284
291.332
291.181
290.916
290.887
290.887
290.887
290.887
289.955
LEVEL CR
GOVERNMENT OF SOUTH EAST CENTRAL
MAHARASHTRA RAILWAY / NAGPUR
PROP.TRACK
CH. -22.470
CH. -47.439
CH. -27.439
CH. -20.720
CH.105.627
CH.125.627
CH.145.627
CH.165.627
CH.185.627
CH.205.627
CH.225.627
CH.253.597
CH. -87.439
CH. -67.439
CH.17.030
CH.15.280
CH.25.627
CH.45.627
CH.65.627
CH.85.627
CONSTRUCTION
CH. 0.00
CHAINAGE
CHIEF ENGINEER
PWD / NAGPUR
LONGITUDINAL SECTION OF ROAD
(H.P TRIPATHI)
P1 CE/CON/NGP
8500 KEY PLAN S.E.C.RAILWAY, NAGPUR
6/900
KM118
500 7500 500
SUPERINTENDING ENGINEER
SCALE 1:1500 PWD / NAGPUR
00m
CH:530
300mmTH.APPROACH 2.5% 2.5%
SLAB (M-30) WEARING COAT CR
TITLE - izLrkfor ukxHkhM & bZrokjh czkWMxst ifj;kstuk gsrq Ekkuolfgr leikkj la[;k (LC No.34)
600
(HOWSHIK MANIVANNAN)
J.G.M (CIVIL) dks can dj.ks dh cnys es mijh lMd iqy ds fuekZ.k gsrw lkekU; O;oLFkk dh :ijs[kk-
1.50M TH.RCC WALL
PROPOSED CONSTRUCTION OF 2 LANE ROB SPAN (1x36.0m) AT LC-34/NI-C AT
SECTION AT 'A' ABUTMENT (M-30)
RAILWAY KM-1187/30 ( PROJECT CH. 53262 M) BETWEEN UMRED - BHIWAPUR
SCALE 1:50 (SMITA JADHAV) STATION IN CONNECTION WITH PROPOSED GAUGE CONVERSION (NG TO BG) OF
D.G.M. (STEEL & DESIGN)
NAGBHIR-ITWARI SECTION WITH ELECTRIFICATION.