MV CABLE INCOMER FEEDERS

(2 x 100% up to 5MVA @ 0.95 Power feeder


requirement) MV Cables from SEC
Substation to
MRMU Room at Juranah Site MRMU
Juranah Plant Room
Boundary
O&M Scope of
SEC

O&M Scope of
Developer

MV Switchgear at Juranah Site

Notes:-

1. MRMU Room shall be engineered as per SEC


specification SDCS-02.
M M M 2. It is project company responsibility to collect all the
Load-1 Load-2 Load-3 required inputs from SEC/SWCC to design, erection
& commissioning of the complete electrical facility
as per scope requirement.
MV/400V MV/400V
Utility Aux. Utility Aux.
Transformer-1 Transformer-2

400V Utility Switchgear at Juranah Site

Typical Utilities Typical Utilities


Load M M M Load

Load-1 Load-2 Load-3