The document describes the medium voltage cable feeders from the SEC substation to the MRMU room at the Juranah plant boundary. It includes two 100% power feeders up to 5MVA at 0.95 power factor requirement. The MV cables and switchgear at the Juranah site are under the O&M scope of the developer, while the SEC substation and cables are under the O&M scope of SEC. It also notes the engineering requirements for the MRMU room and responsibilities of collecting inputs from SEC/SWCC to design, erect, and commission the electrical facilities.
The document describes the medium voltage cable feeders from the SEC substation to the MRMU room at the Juranah plant boundary. It includes two 100% power feeders up to 5MVA at 0.95 power factor requirement. The MV cables and switchgear at the Juranah site are under the O&M scope of the developer, while the SEC substation and cables are under the O&M scope of SEC. It also notes the engineering requirements for the MRMU room and responsibilities of collecting inputs from SEC/SWCC to design, erect, and commission the electrical facilities.
The document describes the medium voltage cable feeders from the SEC substation to the MRMU room at the Juranah plant boundary. It includes two 100% power feeders up to 5MVA at 0.95 power factor requirement. The MV cables and switchgear at the Juranah site are under the O&M scope of the developer, while the SEC substation and cables are under the O&M scope of SEC. It also notes the engineering requirements for the MRMU room and responsibilities of collecting inputs from SEC/SWCC to design, erect, and commission the electrical facilities.
requirement) MV Cables from SEC Substation to MRMU Room at Juranah Site MRMU Juranah Plant Room Boundary O&M Scope of SEC
O&M Scope of Developer
MV Switchgear at Juranah Site
Notes:-
1. MRMU Room shall be engineered as per SEC
specification SDCS-02. M M M 2. It is project company responsibility to collect all the Load-1 Load-2 Load-3 required inputs from SEC/SWCC to design, erection & commissioning of the complete electrical facility as per scope requirement. MV/400V MV/400V Utility Aux. Utility Aux. Transformer-1 Transformer-2