1. OBJECTIVE
Establish an emergency plan for the activity of lifting cargo with cranes, so that the
trained employees of CAO COLOMBIA S.AS. These work instructions must ensure
that the risks to the health of a victim are reduced to a minimum. The emergency
plan minimizes the risk behavior of employees during the development of lifting
activities, and in case of an emergency it is attended in a safe manner.
2. SCOPE
3. RESPONSIBILITIES
SSTA Inspector: Verify the safe application of this plan, as well as verify all
preventive measures for access to the load hoisting area.
4. GENERAL RULES
All elements used for lifting loads must be inspected before being used in the
maneuver.
Overturning.
Sinking.
Fire.
Vehicle ejection.
Explosions or fires.
Falling from a different level.
Particle projection.
Electrical contact.
Thermal contacts.
Temperature changes.
Load drop.
Page 1 of 8
Date of issue:
EMERGENCY PLAN 03/09/2021
Safety helmet.
Hearing protectors (insert or cup type).
Respiratory protection
Gloves against mechanical aggressions.
Safety boots.
Safety goggles (dark or light)
Page 2 of 8
Date of issue:
EMERGENCY PLAN 03/09/2021
5. DEFINITIONS
Load lifting: Operation performed to move large and/or heavy objects that cannot be
transported manually; the equipment used for load lifting is any device that allows lifting or
lowering a load, previously calculated, in a safe and controlled manner.
Rigging: It is any element that participates in the connection of loads to the load lifting
accessory (slings, accessories).
Sling: Cables, chains, metallic meshes and synthetic belts, which allow the load to be
attached to a hoisting device.
Rigging accessories: Such as shackles, eyebolts, hooks, turnbuckles, rods, spreader frames,
lifting eyes, differentials.
Steel wire rope: Set of steel wires grouped and twisted helically, constituting a metallic rope
capable of resisting tensile stresses and with adequate flexibility properties. The cable is
made up of three basic components which, according to their configuration, constitute cables
with different characteristics, useful for different purposes.
Load radius: Horizontal distance from the axis of rotation of the equipment (crane) to the
center of gravity of the load.
Page 3 of 8
13
EMERGENCY PLAN Date of issue: 03/09/2021
Certifications
Everyone involved in the safety for rigger and
management of mechanical lifting must crane operator
have clear roles and responsibilities, personnel.
knowledge, experience, and
Competence of competence for effective supervision of
1. Crane operator.
personnel. the execution of activities. Certificates of
All equipment, rigging, lifting
accessories and others must have crane,
their respective certificates to support rigging,
their use. hoisting
accessories.
13
EMERGENCY PLAN Date of issue: 03/09/2021
(Firefighters,
Ambulance,) brigadistas available in
the area for the attention of an
emergency or urgency.
Go to the pre
operational, check the condition of
hoses, oil levels, fuel level, tire
condition and potential damage to the Pre-operational
machine. inspection of the
crane.
Record the results of the pre-
operational inspection in the format
provided, if you detect anything that Permission
does not allow you to start the pre-
operational inspection. labor, from
report hoisting of loads.
immediately to the supervisor.
Check always
the
height, width and weight
restrictions of the work area and
ensure that your machine does
not exceed these limits.