Professional Documents
Culture Documents
Refrigeration and Air-Conditioning
Refrigeration and Air-Conditioning
UNDER
2017
BY
GOVERNMENT OF INDIA
MINISTRY OF SKILL DEVELOPMENT & ENTREPRENEURSHIP
DIRECTORATE GENERAL OF TRAINING
1
PROPOSED TIME DISTRIBUTION FOR REFRIGERATION AND AIR
CONDITIONING TRADE UNDER DUAL TRAINING SCHEME
2
GENERAL INFORMATION FOR INSTITUTE (ITI)
1. Name of the Trade : REFRIGERATION AND AIR-CONDITIONING
(Dual mode)
2. N.C.O. Code No. : 3132.0900
3. Duration of Craftsmen Training : Two years (Three Blocks).
4. Power norms : 6.82 KW
5. Space norms : Workshop: 80 Sq. meters.
OR
NTC NTC/NAC in Mechanic Refrigeration &
Air-conditioning trade with 3 years' post
qualification experience
8b. Desirable qualification : Preference will be given to a candidate with
CITS. (If not done CITS must be trained with
in 2 yrs of joining)
Note:
(i) Out of two Instructors required for the unit of 2(1+1), one must have
Degree/Diploma and other must have NTC/NAC qualifications.
(ii) Instructor qualification for WCS and E.D, as per the training manual.
3
SYLLABUS CONTENT WITH TIME STRUCTURE FOR REFRIGERATION
AND AIR-CONDITIONING TRADE
Block – I
Duration- 12 Months (52 weeks)
Institute Level Training: -
4
resistance. Insulation and continuity test
4. COMPRESSOR COMPRESSOR
Dismantling of Hermetic compressors, Function, construction, working,
Identification of components, Servicing, cutting application of compressor like,
gaskets, lapping and assembling of compressors Reciprocating, rotary, scroll type.
used in refrigerators, window & split A.C, and
assembling.
5. Dismantling & assembling of Hermetic Study the construction & working of
compressors like, reciprocating, rotary, wobble, centrifugal compressor, wobble & swash
swash plate & scroll type compressors. Identify plate compressor. Compressor efficiency
the parts and rectify the defects factors, wet compression, oil, properties,
lubrication methods.
6. CONDENSER CONDENSER
Familiarization with condensers used in Function of condenser, types,
Refrigerators, Bottle coolers, visible coolers, Construction of air cooled condenser.
Deep freezer, window and Split A.C, Cleaning, Effect of chocked condenser. Advantages,
Flushing and servicing of air cooled condenser, de scaling of air cooled condenser.
leak testing of condenser
7. DRIER DRIER
Replacing drier & capillary tube, in refrigerator Function of drier, types, application and
and window AC. its advantage.
8. EXPANSION VALVE EXPANSION VALVE
Install capillary tube, Test and adjust expansion Expansion valve used in domestic
valves. refrigeration and air conditioning
systems. Capillaries, Automatic and
Thermostatic Ex. Valves.
9. EVAPORATOR EVAPORATOR
Servicing of evaporators in refrigerators, bottle Working principle, Function, types of
cooler, water coolers, window and split A.C, evaporators used in refrigerator, water
Installation, Leak test, remove oil from coolers, bottle coolers, window and split
evaporator, Flushing, Defrosting. A.C, Super heating in evaporators,
Function of accumulator and types.
Methods of defrosting, heat exchanger.
10. REFRIGERANT REFRIGERANT
Identification of refrigerant cylinders, Classification of refrigerants, Properties,
Identification of unknown refrigerants, Chemical name and formulas, HFC, CFC.
Recovery & Transfer of refrigerant, Ozone rule, substitute of CFC, Montreal
protocol &India's CFC/HCFC phase out
schedules. Ozone rules 2000.
11. RETROFITTING RETROFITTING
Retrofitting of a CFC filled Domestic Refrigerator Changes of components & practices while
with retrofitting CFC appliances with HC
Hydrocarbons (HC) using sealed components. refrigerants. Properties of HCs
12. THERMAL INSULATION THERMAL INSULATION
Filling insulation materials in refrigeration Function, types, thermodynamic
systems. properties of heat insulation materials
used in refrigeration and Air
Conditioning systems.
13. WINDOW AIR CONDITIONER WINDOW Air conditioner.
Identify the electrical and mechanical Their types, applications. Construction
5
components, servicing and maintenance, trouble and working, care and maintenance,
shooting, installation, tracing wiring circuit,
evacuation, leak testing, and gas charging in
window Air conditioner.
14. SPLIT A.C SPLIT A.C
Identifying various components, electrical Construction and working principle,
circuits, testing components, fault detection, types, trouble shooting & care and
leak testing, evacuation, gas charging, maintenance.
Installation, trouble shooting in split A.C.
15. SPLIT A.C (Wall Mounted) SPLIT A.C (Wall mounted)
Identifying various components, electrical Construction and working principle,
circuits, testing components, fault detection, types, trouble shooting. Description of
install gauge manifold in the system, leak electrical components used in split A.C.
testing, evacuation, gas charging, Installation, Study the wiring circuit .
trouble shooting.
16. SPLIT A.C SPLIT A.C (floor & Ceiling mounted)
(Floor & Ceiling Mounted ) Construction and working principle,
Identifying various components, electrical types, trouble shooting. Description of
circuits, testing components, fault detection, electrical components used in split A.C.
leak testing, evacuation, gas charging, Study the wiring circuit.
Installation, trouble shooting.
17. SPLIT A.C ( Duct ) SPLIT A.C ( Duct )
Identifying various components, electrical Study of the Duct able split AC, its
circuits, testing components, fault detection, Construction and working principle,
leak testing, evacuation, gas charging, types, trouble shooting.
Installation, trouble shooting. Description of electrical components
used in split A.C. Study the wiring circuit .
18. MULTI SPLIT A.C MULTI SPLIT A.C
Identifying various components, electrical Study the construction and working,
circuits, testing components, fault detection, various components, electrical circuits,
leak testing, evacuation, gas charging, testing components, fault detection, leak
Installation, trouble shooting. testing, evacuation, gas charging,
Installation, trouble shooting.
19. CAR AIR CONDITIONING CAR AIR CONDITIONING
Identifying various components, electrical Study various components, electrical
circuits, testing components, fault detection, circuits, testing components, fault
install gauge manifold in the system, leak detection, leak testing, evacuation, gas
testing, evacuation, gas charging, Installation, charging, Installation, trouble shooting,
trouble shooting, testing magnetic clutch, Magnetic clutch operation, free wheeling ,
regular maintenance, compressor overhauling, care and maintenance.
condenser de scaling, add refrigerant.
20. COMMERCIAL COMPRESSOR COMMERCIAL COMPRESSOR
Dismantling of Commercial type reciprocating Function, types, Construction & working,
compressor, centrifugal compressor, checking of applications of compressors used in
components & accessories. Checking & servicing commercial refrigeration.
valve plate and piston assembly, lapping valve Volumetric efficiency, Capacity control,
plate etc. Preparing gasket, check belt tension factor influencing volumetric efficiency.
and replacing.
21. Checking lubricating system, servicing oil pump, Compressor oil, types, properties, types
6
Checking and servicing of capacity control of the of lubrication methods such as splash,
compressor forced feed.
22. EXPANSION VALVE EXPANSION VALVE
Testing & Installation of thermostatic Ex. Valve. Expansion valve types and function,
Internal & external equalizer connection, super construction, working principle, & their
heat adjustment in TXV. advantage & disadvantages..TXV, AXV,
Float valves, fixed and modulating orifice
controls & electronic Ex. Valves.
23. EVAPORATOR EVAPORATOR
Servicing of extended surface forced air cooled Function, types, Plate & Tube forced air
evaporators. Servicing of Water/ brine chillers, DX evaporators. Types of Defrost system
check De- Frost system, Oil removing. .Water/ Brine chillers. Types of brine
used as secondary refrigerant.
Accumulator, its function.
24. DEEP FREEZER DEEP FREEZER
Deep freezer Checking & servicing , preventive Deep freezer description, Construction,
maintenance & trouble shooting Checking working, specifications, function, care
wiring circuit, test components, replacing and maintenance, faults and remedies.
components, install gauge manifold in the
system, evacuation, gas charging, Installation,
testing performance.
25. ICE PLANT ICE CREAM PLANT
Identify parts, Controls & Specification of Ice Details about components of Ice plant
plant temperature maintaining., trouble their functioning, working principle,
shooting, servicing, Checking wiring circuit, test Circuit diagram, capacity & types of
components, replacing components, evacuation, compressor used, temperature
gas charging, Installation, testing performance, maintaining.
plant operation.
26. COLD STORAGE COLD STORAGE
Identify parts, Controls & accessories Study of cold storage plant, parts,
Specification, Construction, applications, controls &
Servicing of Cold storage plant. Operation of electrical diagram used in cold storage
cold storage. Testing electrical controls, cooling plant. Food preservation spoiling agents-
system, mechanical components, add oil, add controlling of spoiling agents,
refrigerant, test leak, evacuation, gas charging, preservation by refrigeration system,
periodic maintenance. maintaining temperature in different
places. Types of cold storage and its
details.
27. PSYCHROMETRY. Fundamentals of Central Air
Find DBT, WBT, RH & other properties by using Conditioning, requirements of comfort
psychometric chart. Use of psycho meter. A.C, study of psychometric terms, DBT,
WBT, RH, enthalpy, dew point, and
specific humidity.
28. Use of Anemometers for measuring Air flow, use Types of Central air conditioning (Direct
7
of monometers, measuring air flow, pivot tube and indirect system) Construction,
for air flow measurement. working, components, faults, care and
maintenance,
29. Servicing of Fans & blowers, motors, used in Air Description of blowers& fans, function
conditioning system. and types, static and velocity pressure
measurements.
30. DUCT DUCT
Installation of ducts, construction of ducts, Function, types, materials, duct
understanding Duct lay out drawings, selection designing, duct insulation, air
of ducts, and insulation in ducts. Longitudinal distribution methods, air flow, AHU, fan,
and transverse joints. blower.
31. AIR FILTERS AIR FILTERS
Servicing and maintenance of different filters, Function of air filters, types, construction,
Installation of filter maintenance, effect of chocked Air filter.
32. SPLIT A.C ( Duct ) SPLIT A.C ( Duct )
Identifying various components, electrical Study the Duct able split AC, its
circuits, testing components, fault detection, Construction and working principle,
leak testing, evacuation, gas charging, types, trouble shooting.
Installation, Trouble shooting.
33. MULTI SPLIT A.C ( Duct ) MULTI SPLIT A.C ( Duct)
Identifying various components, electrical Study various mechanical and electrical
circuits, testing components, fault detection, components construction and working,,
leak testing, evacuation, gas charging, electrical circuits, testing components,
Installation, Trouble shooting. fault detection, trouble shooting.
34. PACKAGE A.C PACKAGE A.C
Identifying various components, electrical Study Package AC, types, construction
circuits, testing components, fault detection, and working principle, trouble shooting,
install gauge manifold in the system, leak and various applications. Duct system,
testing, evacuation, gas charging, Installation, AHU.
Trouble shooting.
35. Identifying various components, electrical Care and maintenance, installation
circuits, testing components, fault detection, method, capacity calculation.
install gauge manifold in the system, leak
testing, evacuation, gas charging, Installation,
Trouble shooting.
36. SPLIT PACKAGE Identifying various SPLIT PACKAGE
components, electrical circuits, testing Construction and working principle,
components fault detection, leak testing, types, Study various electrical and
evacuation, gas charging, Installation, Trouble mechanical components, trouble
shooting. shooting.
37. CENTRALISED/INDUSTRIAL CENTRALISED/INDUSTRIAL
AIRCONDITIONING. Identifying AIRCONDITIONING.
various components, electrical circuits, testing Construction and working principle,
components, fault detection, leak testing, types, maintenance of Industrial Air-
evacuation, gas charging, Trouble shooting, conditioning plant. Humidification and
Servicing AHU. Check air flow, Check dehumidification methods. AHU.
temperature & pressure, operation of plant,
Decaling condenser and cooling tower.
38. Pump down of gas, add oil to compressor, add Temperature and pressure controls used
gas in the system, trouble shoot and repair air in AC plant, its construction, working,
8
conditioner. Check temperature and pressure safety devices, cooling towers, chilled
controls. piping lines,
39. DIRECT EX.SYSTEM DIRECT EX.SYSTEM
Identifying various components, electrical Understanding Direct expansion system.
circuits, testing components, fault detection, Operation & Preventive Maintenance
leak testing, evacuation, gas charging, Schedule of central AC plant.
Installation, Trouble shooting. Operation
&Maintenance of Central AC plant.
40. Check and test VRF system. Details of VRF system.
41. INDIRECT/CHILLER SYSTEM INDIRECT/CHILLER SYSTEM
Identifying various components, electrical Understanding central station AHU and
circuits, testing components, fault detection, FCU, Air washers used in chilled water
install gauge manifold in the system, leak system, understanding lay out,
testing, evacuation, gas charging, Installation, modulating valves for temperature
Trouble shooting.. control. Expansion tanks.
42. Revision & Examination
9
Syllabus for
EMPLOYABILITY SKILLS
10
GENERAL INFORMATION
(Employability Skill)
1. Name of the subject : EMPLOYABILITY SKILLS
4. Instructor Qualification :
MBA OR BBA with two years experience OR Graduate in Sociology/ Social Welfare/
Economics with Two years experience OR Graduate/ Diploma with Two years
experience and trained in Employability Skills from DGET institutes
AND
Must have studied English/ Communication Skills and Basic Computer at 12th / Diploma
level and above
OR
Existing Social Studies Instructors duly trained in Employability Skills from DGET
institutes
5. Instructor :
One full time regular instructor shall be engaged on every 240 numbers of trainees for
teaching the subject “Employability Skills”. One additional full time regular instructor
would be required on increase in every 240 trainees. Wherever the trainees are less
than 240 or part thereof, a part-time instructor may be engaged to teach the subject.
11
ALLOTMENT OF TIME AND MARKS AMONG THE TOPICS
Sl. No. Topics Allotted Hours Marks To be
Allotted covered in
1. English Literacy 20 hrs. 9
2. I.T. Literacy 20 hrs. 9
3. Communication Skills 15 hrs. 7
SUB TOTAL: 55 25
4. Entrepreneurship Skills 15 hrs. 6
5. Productivity 10 hrs. 5
6. 15 hrs. 6 Block – I
Occupational safety , health
and Environment Education
7. Labour Welfare Legislation 05 hrs. 3
8. Quality Tools 10 hrs. 5
Sub Total: 55 25
TOTAL 110 hrs. 50
12
Detail of Syllabus
1. English Literacy
Hours of Instruction: 20 Hrs. Marks Allotted: 09
Pronunciation Accentuation (mode of pronunciation) on simple
words, Diction (use of word and speech)
Functional Grammar Transformation of sentences, Voice change,
Change of tense, Spellings.
Reading Reading and understanding simple sentences
about self, work and environment
Writing Construction of simple sentences Writing simple
English
Speaking / Spoken English Speaking with preparation on self, on family, on
friends/ classmates, on know, picture reading gain
confidence through role-playing and discussions
on current happening job description, asking
about someone's job habitual actions. Cardinal
(fundamental) numbers ordinal numbers. Taking
messages, passing messages on and filling in
message forms Greeting and introductions office
hospitality, Resumes or curriculum vita essential
parts, letters of application reference to previous
communication.
2. I.T. Literacy
Hours of Instruction: 20 Hrs. Marks Allotted: 09
Basics of Computer Introduction, Computer and its applications,
Hardware and peripherals, Switching on-Starting
and shutting down of computer.
Computer Operating System Basics of Operating System, WINDOWS, The user
interface of Windows OS, Create, Copy, Move and
delete Files and Folders, Use of External memory
like pen drive, CD, DVD etc, Use of Common
applications.
Word processing and Basic operating of Word Processing, Creating,
Worksheet opening and closing Documents, use of shortcuts,
Creating and Editing of Text, Formatting the Text,
Insertion & creation of Tables. Printing document.
Basics of Excel worksheet, understanding basic
commands, creating simple worksheets,
understanding sample worksheets, use of simple
formulas and functions, Printing of simple excel
sheets
Computer Networking and Basic of computer Networks (using real life
INTERNET examples), Definitions of Local Area Network
(LAN), Wide Area Network (WAN), Internet,
Concept of Internet (Network of Networks),
Meaning of World Wide Web (WWW), Web
Browser, Web Site, Web page and Search Engines.
Accessing the Internet using Web Browser,
Downloading and Printing Web Pages, Opening an
email account and use of email. Social media sites
13
and its implication.
Information Security and antivirus tools, Do's and
Don'ts in Information Security, Awareness of IT -
ACT, types of cyber crimes.
Self awareness
Importance of Commitment
14
Attitude
4. Entrepreneurship Skills Hour of Instruction: 15 Hrs.
Marks Allotted: 06
Concept of Entrepreneur - Entrepreneurship -
Entrepreneurship Enterprises:-Conceptual issue
Entrepreneurship vs. management,
Entrepreneurial motivation. Performance &
Record, Role & Function of
entrepreneurs in relation to the enterprise &
relation to the economy, Source of business ideas,
Entrepreneurial opportunities, The process of
setting up a business.
Project Preparation & Qualities of a good Entrepreneur, SWOT and Risk
Marketing analysis Analysis. Concept & application of PLC, Sales &
distribution Management. Different Between Small
Scale & Large Scale Business, Market Survey,
Method of marketing, Publicity and advertisement,
Marketing Mix.
Institutions Support Preparation of Project. Role of Various Schemes
and Institutes for self-employment i.e. DIC, SIDA,
SISI, NSIC, SIDO, Idea for financing/ non financing
support agencies to familiarizes with the Policies
/Programmes & procedure & the available
scheme.
Investment Procurement Project formation, Feasibility, Legal formalities i.e.,
Shop Act, Estimation & Costing, Investment
procedure - Loan procurement - Banking
Processes.
5. Productivity
Hour of Instruction: 10 Hrs. Marks Allotted: 05
Benefits Personal / Workman - Incentive, Production
linked Bonus,
Improvement in living standard.
Industry
Nation.
Affecting Factors Skills, Working Aids, Automation, Environment,
Motivation How improves or slows down.
Comparison with developed Comparative productivity in developed
countries countries (viz. Germany, Japan and Australia) in
selected industries e.g. Manufacturing, Steel,
Mining, Construction etc. Living standards of those
countries, wages.
Personal Finance Banking processes, Handling ATM, KYC
Management registration, safe cash handling, Personal risk and
Insurance.
15
Occupational Hazards Basic Hazards, Chemical Hazards, Vibroacoustic
Hazards, Mechanical Hazards, Electrical Hazards,
Thermal Hazards. Occupational health,
Occupational hygienic, Occupational Diseases/
Disorders & its prevention.
Accident & safety Basic principles for protective equipment.
Accident Prevention techniques - control of
accidents and
safety measures.
First Aid Care of injured & Sick at the workplaces, First-Aid
& Transportation of sick person
Basic Provisions Idea of basic provision of safety, health, welfare
under legislative of India.
16
Introduction to Environment. Relationship between
Ecosystem Society and Environment, Ecosystem and Factors
causing imbalance.
Pollution Pollution and pollutants including liquid, gaseous, solid
and hazardous waste.
Energy Conservation Conservation of Energy, re-use and recycle.
Global warming Global warming, climate change and Ozone layer
depletion.
Ground Water Hydrological cycle, ground and surface water,
Conservation and Harvesting of water
Environment Right attitude towards environment, Maintenance of in
-house environment
7. Labour Welfare Legislation Hour of Instruction: 05 Hrs.
Marks Allotted: 03
Welfare Acts Benefits guaranteed under various acts- Factories Act,
Apprenticeship Act, Employees State Insurance Act
(ESI), Payment Wages Act, Employees Provident Fund
Act, The Workmen's compensation Act.
Hour of Instruction: 10 Hrs.
8. Quality Tools Marks Allotted: 05
Quality Consciousness Meaning of quality, Quality characteristic.
Quality Circles Definition, Advantage of small group activity,
objectives of quality Circle, Roles and function of
Quality Circles in Organization, Operation of Quality
circle. Approaches to starting Quality Circles, Steps for
continuation Quality Circles.
Quality Management System Idea of ISO 9000 and BIS systems and its importance in
maintaining qualities.
House Keeping Purpose of House keeping, Practice of good
Housekeeping.
Quality Tools Basic quality tools with a few examples
17
Tools & Equipments for Employability Skills:
Sl. Name of the Equipment Quantity
No.
1 Computer (PC) with latest configurations and Internet 10 nos.
connection with standard operating system and
standard word processor and worksheet software
2 UPS - 500Va 10 nos.
3 Scanner cum Printer 1 no.
4 Computer Tables 10 nos.
5 Computer Chairs 20 nos.
6 LCD Projector 1 no.
7 White Board 1200mm x 900mm 1 no.
* Note: Above Tools & Equipments not required, if Computer LAB is available in the
institute.
18
Syllabus for
ENGINEERING DRAWING
19
GENERAL INFORMATION
(Engineering Drawing)
5. Instructor:
• One full time instructor is required for 144 Engineering seats sanctioned in
the institute. Additional instructor will be required on increase in every
144 students.
• For seats less than 144, the instructor may be out sourced/ hired on
contract basis.
20
Details of syllabus
Sl. Topics
No. (Total duration – 310 hrs.)
1. Engineering Drawing: Introduction and its importance
- Relationship to other technical drawing types
- Conventions
- Viewing of engineering drawing sheets.
- Method of Folding of printed Drawing Sheet as per BIS SP:46-2003
2. Drawing Instruments : their Standard and uses
- Drawing board, T-Square, Drafter (Drafting M/c), Set Squares,
Protractor, Drawing Instrument Box (Compass, Dividers, Scale, Diagonal
Scales etc.), Pencils of different Grades, Drawing pins / Clips.
3. Lines :
- Definition, types and applications in Drawing as per BIS SP:46-2003
- Classification of lines (Hidden, centre, construction, Extension,
Dimension, Section)
- Drawing lines of given length (Straight, curved)
- Drawing of parallel lines, perpendicular line
- Methods of Division of line segment
4. Drawing of Geometrical Figures: Definition, nomenclature and practice of - Angle:
Measurement and its types, method of bisecting.
- Triangle -different types
- Rectangle, Square, Rhombus, Parallelogram.
- Circle and its elements.
5. Lettering and Numbering as per BIS SP46-2003: - Single Stroke, Double Stroke,
inclined, Upper case and Lower case.
6. Dimensioning:
- Definition, types and methods of dimensioning (functional, nonfunctional and
auxiliary)
- Types of arrowhead
- Leader Line with text
7. Free hand drawing of
- Lines, polygons, ellipse, etc.
- geometrical figures and blocks with dimension
- Transferring measurement from the given object to the free hand sketches.
8. Sizes and Layout of Drawing Sheets
- Basic principle of Sheet Size
- Designation of sizes
- Selection of sizes
- Title Block, its position and content
- Borders and Frames (Orientation marks and graduations)
- Grid Reference
- Item Reference on Drawing Sheet (Item List)
9. Method of presentation of Engineering Drawing
- Pictorial View
- Orthogonal View
- Isometric view
10. Symbolic Representation (as per BIS SP:46-2003) of :
Fastener (Rivets, Bolts and Nuts) - Bars and profile sections
21
- Weld, brazed and soldered joints.
- Electrical and electronics element
- Piping joints and fittings
11. Construction of Scales and diagonal scale
12. Practice of Lettering and Title Block
13. Dimensioning practice:
- Position of dimensioning (unidirectional, aligned, oblique as per BIS SP:46-
2003)
- Symbols preceding the value of dimension and dimensional tolerance.
- Text of dimension of repeated features, equidistance elements,
circumferential objects.
14. Construction of Geometrical Drawing Figures:
- Different Polygons and their values of included angles. Inscribed and
Circumscribed polygons.
- Conic Sections (Ellipse & Parabola)
15. Drawing of Solid figures (Cube, Cuboids, Cone, Prism, Pyramid, Frustum of Cone and
Pyramid.) with dimensions.
16. Free Hand sketch of hand tools and measuring tools used in respective trades.
17. Projections:
- Concept of axes plane and quadrant.
- Orthographic projections
- Method of first angle and third angle projections (definition and difference)
- Symbol of 1st angle and 3rd angle projection as per IS specification.
18. Drawing of Orthographic projection from isometric/3D view of blocks
19. Orthographic Drawing of simple fastener (Rivet, Bolts, Nuts & Screw)
20. Drawing details of two simple mating blocks and assembled view.
21. - Machined components; concept of fillet & chamfer; surface finish symbols.
22. - Screw thread, their standard forms as per BIS, external and internal thread,
conventions on the features for drawing as per BIS.
23. - Free hand Sketches for bolts, nuts, screws and other screwed members.
24. - Free hand Sketching of foundation bolts and types of washers.
25. - Standard rivet forms as per BIS (Six types).
26. - Riveted joints-Butt & Lap (Drawing one for each type).
27. - Orthogonal views of keys of different types
28. - Free hand Sketches for simple pipe, unions with simple pipe line drawings.
29. - Concept of preparation of assembly drawing and detailing. Preparation of simple
assemblies & their details of trade related tools/job/exercises with the dimensions
from the given sample or models.
30. -Free hand sketch of trade related components / parts (viz., single tool post for the
lathe, etc.)
31. - Study of assembled views of Vee-blocks with clamps.
32. - Study of assembled views of shaft and pulley.
33. - Study of assembled views of bush bearing.
34. - Study of assembled views of a simple coupling.
35. - Free hand Sketching of different gear wheels and nomenclature.
36. - Free hand Details and assembly of simple bench vice.
37. - Reading of drawing. Simple exercises related to missing lines, dimensions. How to
make queries.
22
38. - Simple exercises relating missing symbols.
- Missing views
39. - Simple exercises related to missing section.
40. -Free hand sketching of different types of bearings and its conventional
representation.
41. - Free hand sketching of different gear wheels and nomenclature/ Simple duct (for
RAC).
Free hand sketch of Reciprocating compressor - open type (for RAC)
42. - Solution of NCVT test.
- Simple exercises related to trade related symbols.
- Basic electrical and electronic symbols
43. - Study of drawing & Estimation of materials.
44. - Solution of NCVT test papers.
45. Revision
46. Examination
23
LIST OF TOOLS & EQUIPMENTS
24
Syllabus for
25
GENERAL INFORMATION
(Workshop Calculation & Science)
26
SYLLABUS FOR WORKSHOP CALCULATION AND SCIENCE
(Total duration – 220 hrs.)
27
and right angled triangle. -Stress, strain, ultimate strength, factor of
safety.
-Basic study of stress-strain curve for MS.
10. - Area of cut-out regular surfaces: circle and - Temperature measuring instruments.
segment and sector of circle. Specific heats of solids & liquids.
11. - Area of irregular surfaces. - Thermal Conductivity, Heat loss and heat
- Application related to shop problems. gain.
12. - Volume of cut-out solids: hollow cylinders, - Average Velocity, Acceleration &
frustum of cone, block section. Retardation.
- Volume of simple machine blocks. - Related problems.
13. - Material weight and cost problems related - Circular Motion: Relation between circular
to trade. motion and Linear motion, Centrifugal force,
Centripetal force
14. - Finding the value of unknown sides and
angles of a triangle by Trigonometrical
method.
15. - Finding height and distance by
trigonometry.
16. - Application of trigonometry in shop
problems. (viz. taper angle calculation).
17. Graph: - Friction- co-efficient of friction, application
- Read images, graphs, diagrams and effects of friction in Workshop practice.
- Bar chart, pie chart. Centre of gravity and its practical
- Graphs: abscissa and ordinates, graphs of application.
straight line, related to two sets of varying
quantities.
18. Simple problem on Statistics: - Magnetic substances- natural and artificial
- Frequency distribution table magnets.
- Calculation of Mean value. - Method of magnetization. Use of magnets.
- Examples on mass scale productions. -
Cumulative frequency -Arithmetic mean
19. Acceptance of lot by sampling method - Electrical insulating materials.
(within specified limit size) with simple - Basic concept of earthing.
examples (not more than 20 samples).
20. - Transmission of power by belt, pulleys &
gear drive.
- Calculation of Transmission of power by
belt pulley and gear drive.
21. - Heat treatment and advantages.
22. Concept of pressure - units of pressure,
atmospheric pressure, absolute pressure,
gauge pressure -gauges used for measuring
pressure
23. Introduction to pneumatics & hydraulics
systems.
28
BLOCK – II
DURATION: 09 MONTHS (39 weeks)
Industry level training
BROAD LEARNING TO BE COVERED IN INDUSTRY FOR
REFRIGERATION AND AIR CONDITIONING TRADE:
1. Safety and best practices /Basic Industrial Culture (5S, KAIZEN,
etc.)
2. Record keeping and documentation
3. Basic machining operations
4. Preparing components
5. Assembling
6. Repair & Maintenance work
7. Inspection & testing
NOTE: -
1. All the operations suggested in Block-II should be covered during Industrial Training.
2. In addition to above mentioned skills/ operations industry may impart training on any other
skills/ operations related to trade
30
BLOCK – III
DURATION: 3 months (13 weeks)
Institute level training
Note:-
1. The training may be conducted in Block mode i.e. few months in ITI & few
in Industry.
2. The training may be conducted in flexible mode i.e. few days of a week in
ITI & few days in Industry.
3. Nine months industrial training is mandatory.
4. Last three months of training in ITI is mandatory.
5. No admission of trainees without signing MOU with industry by the
Institute (ITI).
6. At the time of signing MOU with ITI, Industry must ensure that training
facility is available for operations covered under Block-II.
7. Minimum 75% of total skill set of Block- II must be covered in Industry
who is signing MOU. However Industry must ensure 100% skill training in
Block-II & necessary arrangement to be made to cover training on rest skill
sets (beyond the percentage indicated in sl-6) in collaboration with any
other related industries. (The same will be part of guidelines in MOU)
31
TRADE: REFRIGERATION AND AIR-CONDITIONING
(Dual mode)
20 nos
2. File, half round, fine double length 150mm
cut, 20 nos
14. Cold Chisel flat and cross cut length 150mm 20 nos
20 nos
16. Tape measuring 10m graduation in mm
20 nos
32
22. Surface plate 45 x45 cms 1no.
23. Oil can 500 ml 5 nos.
24. Surface Gauge universal 150 mm 5 nos.
25. Bench vice 300mm jaw 10 nos.
26. Hack saw tubular metal frame 300mm 10 nos.
adjustable
27. Snip sheet metal straight nose 200 mm 10 nos.
28. Snip sheet metal curved nose 200 mm 10 nos.
29. Anvil 100X200mm 1no.
30. Stakes [ different Types] 100mm 1 no each
31. Tin smith 400mm 1 No.
32. Wooden mallet /Nylon mallet 500 gm good finish 5 Nos.
33. Round Punch 3mm,4mm,6mm 5 Nos. each
34. Grover set 4mm forming 1 set
35. Electrical drill portable drill capacity 6.4mm 5 nos.
with chuck and key,
36. Tape measuring graduation in 2m 5nos.
mm
37. Screw driver, plastic handle, 6mm TIP length 100mm to 6nos.
150mm
38. Screw driver, plastic handle, Flat 10mm TIP length 200mm &
6 nos. each
tip 250mm
39. Philips screw driver - complete set in leather case 5 nos.
40. Screw driver, plastic handle, Flat handle 3mm TIP length 5 nos.
tip 100mm to 150mm
insulated
41. Soldering iron exchangeable 65 watts 10 nos.
copper tip
42. Knife folded stainless steel - 150mm 10 nos.
43. Tong tester (clamp on multi 0-10-30 amps 0-500 v 5 nos.
meter)
44. Voltmeter, AC/DC portable 0 to 500 volt 5nos.
precision grade Digital Panel
board type
45. Ammeter, AC/DC portable 0 to 30 amp 5nos.
precision grade Digital Panel
board type
46. Megger 1000v 5nos.
47. Wattmeter multi-range upto 1 KW 1no.
33
60. C.R.O Dual trace/ Double beam 60 MHZ 2 nos.
61. A.F.O Oscillators 2 nos.
62. Tong Close mouth and pick 1 no.
63. Welding table for gas/Arc 1200x760 1each
64. Flaring tool set, single type for 4.7mm to 16mm O.D 5 nos.
tube.
65. Swaging tool, punch type, set of 4.7mm to 16mm O.D 5sets
size for tube.
66. Swaging tool, screw type with 4.7mm to 16mm O.D. 5sets
adaptor set of size for tube
67. Bending spring external type, 3mm to 16mm DIA 5sets
for copper tube
68. Pipe cutter miniature for copper 3mm to 16mm DIA 5sets
tube
69. Pinch of tool, for copper tube, 6mm to 18mm DIA 5sets
70. Ratchet spanner of 6.4 sq.mm reversible 5sets
71. Capillary plug gauge 5sets
72. Piercing pliers & reversing valve 6-18mm 5sets
with access fitting
73. Spanner double ended 4.7mm to 16mm 5sets
74. Ring spanner off set 4.7mm to 16mm 5sets
75. Wrench adjustable length 150mm 5sets
76. Wrench adjustable length 200mm 5sets
77. Wrench adjustable length 250mm 5sets
78. Valve key handle[Treated as - 4.7mm & 6.4mm sq. 5sets
consumable]
79. Pressure gauge Digital type diameter 63mm with 5sets
recalibration set
80. Compound gauge, Digital type diameter 63mm, with 5sets
recalibration set screw,
scale vacuum 76mm.
Pressure 15 Kg/sq.cm
81. Service man thermometer in - 30 C to +30 C 5sets
metal case
82. Scissor, gasket cutting stainless length 25mm 5sets
steel
83. L-Allen key set size 1.5mm to 6.4mm 5 sets
84. T-Allen key set size 5/32" to 1/8" 5sets
85. Pipe cutter with built in reamer 3mm to 32mm 5nos.
and space cutter, for copper
tube
86. Pipe /Tube bender lever type 3-16 mm 1 no each
87. Spanner double ended 19mm to 31.8 mm 5nos.
88. Pipe wrench size 50mm to 150mm 5nos.
89. Gas leak detector for halogen 5nos.
gas
90. Sling psychro meter mounted on scale 50 C to +50 C 5nos.
aluminum back,
91. Lapping plate 250mm x 200mm 2nos.
92. Hammer ball peen 450 gms 5nos.
93. Puller 3 legged with flexible arm 300mm 5nos.
94. Hand blower portable complete 1/10 HP 2nos.
95. Spirit level precision metallic 200mm 2nos.
34
96. Stop watch 2nos.
97. Tap set with matching drills 3 mm to 16mm 3nos.
98. Tap set with matching drills V to 5/8" 3nos.
99. Refrigerant cylinder 2.5 Kg 3nos.
100. Vernier caliper length 250mm 2nos.
101. Micrometer outside 0 to 25mm 2nos.
measurement
102. Heating kit with infrared bulb (200 w capacity) 2nos.
103. Plumbing hammer weight 200 gm 2nos.
104. Multi meter analogue type 5nos.
105. Tachometer digital, multi range 0 r m p to 3000 r m p. 2nos.
Portable small size in
leather case
106. Micron vacuum gauge capable of reading up to 20 2nos.
microns
107. Sensor thermometer -50 degree Celsius
(digital) to150 degree 23Celsius 2nos.
108. Fin straightened/fin comb. With strong steel wire 3nos.
based combing on wood
109. Filler gauge 0.05 mm - 1 mm 3nos.
110. Wire gauge metric and Steel plate embossing
with worth converse of British & Metric 2nos.
111. Dial thermometer remote 75mm - 50C to +50 C 3nos.
control, armored capillary dial
112. Anemometer Digital type 1no.
113. Compressors testers for Fixed with electrical
114 Small hermetic compressors input/ output indicating 2nos.
facilities
115 Engineers square 150mm with 5' tolerance 5nos.
116 Digital thermometer Graduated disc analogy 1no.
[Treated as consumable] type
117 Temperature &Humidity Capacity to record 24 1no.
recorder hrs record
118 Instrumentation screw 100mm 5nos.
driver set
119 Digital weighing machine 100 kg 1no.
120 Cylinder 134 a 5 kg 1 no.
35
B. General Machinery Shop Outfit:
37
C. WORKSHOP FURNITURE
UPS 650 VA 1 no
15.
39
D. LIST OF CONSUMABLES.
40
43. Freon gas 12
44. Freon gas 22
45. HFC 134 a
46. Match box
47. Washing soap
48. Incandescent lamp 500 W
49. Cell 12 V
50. L.M.S relay ¼, 1/6, 1/8 HP
51. Sand paper
52. Stove pin
53. Epoxy compound/ M seal
54. Gloves for welding[Treated as consumable]
55. Leather Apron [Treated as consumable]
Note: -
1. Consumables may procure according to skills requirements.
2. Specification may change depends upon availability of market.
3. Quantity depends up on number of trainees
41
Format for Internal Assessment
Operation/Skill:
assessment Marks
Skills to handle tools &
Safety consciousness
Total internal
Workplace hygiene
Result (Y/N)
Economical use of
Manuals/ Written
Ability to follow
Application of
workmanship
Attendance/
instructions
Punctuality
Knowledge
equipment
Sl. No
Quality in
materials
Father's/
VIVA
Candidate Name
Mother’s Name
42
LIST OF TRADE COMMITTEE MEMBERS
43