BPC ACT UPGRADE – Case Studies

Case # 1 Crude Oil Refinery - Upgrade Upgrade Objectives:


Outlet
Parameters Inlet Before U/G After U/G
PH 7-9.6 6.5-7.2 6.5-7.5 Perform High & Sustainable
COD 500-1000 70-120 40-60 treatment Quality
BOD 200-500 50-80 20-30
Oil & Gas 50-160 3.0-15.0 less than 5 Meet RO inlet Quality
Ammonia 40-150 20-60 12 --20
Alkalinity 200-630 50-85 40-50 Eliminate raw water use in RO
Sulfides 15-80 less than 4 less than 1
Optimize Chemical usage & Sludge
chlorides 200-400 200-350 100-200
TDS 500-1500 400-1200 400-1100 Disposal
Turbidity 60-80 15-20 below 10
TSS 300-740 100-130 below 20
Phenols 43-68 15-25 less than 1 All Objectives achieved!
RO Raw water 50% 100%
use Site running for last 16 months

Upgrade Objectives: Case # 2 - Centralized WWT - Upgrade


Outlet
Meet EPA regulation to avoid
Parameters Inlet Before U/G After U/G
shutdown of the industrial park
PH 3.2-11.5 6.5-7.5 6.5-6.7
Phase 1 – COD < 500 COD 5000-12000 1000-3000 350-420
Phase 2 (in progress) COD < 200 BOD 800-2400 500-700 < 60
TSS 900-1000 200-300 30-60
Add Automation + monitoring Ammonia 200-600 100-400 < 50
various streams chlorides 6000-8000 7000-8000 4000-6000
Phase one successfully running! TDS 19000-32000 19000-33000 20000-33000

Case # 3 PTA Refinery Upgrade Upgrade Objectives:


Parameters Inlet Outlet Perform High & Sustainable
Before BPC After BPC treatment Quality
PH 7-May 7.3-8.4 6.8 - 8.1
COD 4000-7000 500-800 Below 30 Demonstrate ACT + MBR to
BOD 1300-2100 100-200 below 10 get BEST Quality & RO
Ammonia 40-50 24-36 Below 5 Ready for future options to
Alkalinity 1500-2700 1000-1800 below1000 get Zero Liquid Discharge
Sulfides 90-260 60-130 below 10
TDS 1100-1300 1100 -1400 1100 - 1400
TSS 1700-2000 Below 30 Below 1 Successful upgrade!
turbidity 70-100 50-70 Below 1 Site running since 2011
Phenols 30-40 15-20 Undetected