Tunnel Format 1 - Merged
Tunnel Format 1 - Merged
Tunnel Format 1 - Merged
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to
Km 146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT.
INDEPENDENT ENGINEER
LTD. IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
EPC CONTRACTOR : M/s. S.P.SINGLA CONSTRUCTION PVT. LTD.
Type of Aggregate : Date of Sampling :
Source of Aggregate : Date of Testing :
Sample Weight :
SILT CONTENT OF SAND(AS PER IS:2386 Part - 2 - 1963)
Sl.No. DESCRIPTION TRIAL - 1 TRIAL - 2 TRIAL - 3 AVERAGE
Volume of Sand - B
Remarks :
SIEVE ANALYSIS REPORT
(AS PER IS:383 & IS:2386-Part-1-1963 & MORTH 5th REVISION)
Sample Weight :
Remarks:
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to
Km 146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT.
INDEPENDENT ENGINEER
LTD. IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
GRADATION Total Wt :-
40MM 100
20MM 85-100
10MM 0-20
4.75 MM 0-5
PAN
Remarks:-
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to Km
146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
Chainage:-
Location: Tunnel -
10
8
6
4
2
0
0 5 10 15 20 25 30 35 40
Displacement(mm)
TEST RESULTS : Maximum Pull Force :-
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km
128.835 to Km 146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT. LTD. IN ASSOCIATION
INDEPENDENT ENGINEER
WITH NOKANG INFRA PVT LTD.
Measurement 1
Measurement 2
Measurement 3
Measurement 4
Measurement 5
Measurement 6
Measurement 7
Measurement 8
Measurement 9
Measurement 10
Average
Strength MPa
Temperature
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to
Km 146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT.
INDEPENDENT ENGINEER
LTD. IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
EPC CONTRACTOR : M/s. S.P.SINGLA CONSTRUCTION PVT. LTD.
Type of Aggregate : Date of Sampling :
Source of Aggregate : Date of Testing :
Sample Weight :
Prepared
Moisture Content
by
Tunnel Date
SAMPLING DATE: LAB REF. NO. : ……………………
TESTING DATE: SAMPLED BY: ………………………
MATERIAL SOURCE : SAMPLING LOCATION :…………
AGGREGATE SIZE:
1 2 Average
Wt. of Wet Agg. + Container W1, (gm)
Wt. of Oven Dry Agg. + Container W2, (gm)
Wt. of Container W3, (gm)
Wt. of Dry Aggregate W4 = W2 - W3, (gm)
Total M.C. TMC = (W1 - W2)/W4 x100, (%)
Absorption Ab, (%)
Free M.C. =TMC - Ab, (%)
AGGREGATE SIZE:
1 2 Average
Wt. of Wet Agg. + Container W1, (gm)
Wt. of Oven Dry Agg. + Container W2, (gm)
Wt. of Container W3, (gm)
Wt. of Dry Aggregate W4 = W2 - W3, (gm)
Total M.C. TMC = (W1 - W2)/W4 x100, (%)
Absorption Ab, (%)
Free M.C. =TMC - Ab, (%)
AGGREGATE SIZE:
1 2 Average
Wt. of Wet Agg. + Container W1, (gm)
Wt. of Oven Dry Agg. + Container W2, (gm)
Wt. of Container W3, (gm)
Wt. of Dry Aggregate W4 = W2 - W3, (gm)
Total M.C. TMC = (W1 - W2)/W4 x100, (%)
Absorption Ab, (%)
Free M.C. =TMC - Ab, (%)
Remarks:
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to Km
146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT. LTD.
INDEPENDENT ENGINEER
IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
EPC CONTRACTOR : M/s. S.P.SINGLA CONSTRUCTION PVT. LTD.
CHECKLIST FOR SHOTCRETE THICKNESS
REPORT NO DATE
SITE & LOCATION CH/ROUND NO
TYPE OF SUPPORT REQUIRED THICKNESS
LAYER GRADE
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to Km
146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT.
INDEPENDENT ENGINEER
LTD. IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
EPC CONTRACTOR : M/s. S.P.SINGLA CONSTRUCTION PVT. LTD.
Concrete / Shotcrete (Pour Card) Prepared by
Date:
Tunnel SBTP T-1
Grade :…………………………………….. Site / Location: ………………………………………….
Shift :……………………………………
Volume / Concrete
Challan Cumuli. Arrival time on Slump Ambient Start time of
Truck No. Mix. No. truck Temp.
No. volume (m3) site (mm ) Temp. (C) placing
(m3) (C)
Remarks:
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to Km 146.300 for Design Length = 17.465 Km) in Himachal
Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT PVT. LTD. IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
INDEPENDENT ENGINEER
Chainage Slump(mm)
Avg. core
Area Corrected Equivalen Strength
Length of
Date of Dia of Core Wt. of Volume Density Load Correctio Core t Core
Sl. No. Age in Days Core L/D Ratio Remarks
Testing (mm) Core (Kg) (m³) (Kg/m³) (KN) n Factor strength Strength
(mm) (mm²) (N/mm²)
(N/mm²) (N/mm²)
Remarks:
Construction of 4 laning of NH 5 from Kaithlighat to Shakral Village (Shimla Bypass Package I: from Km 128.835 to
Km 146.300 for Design Length = 17.465 Km) in Himachal Pradesh on Hybrid Annuity Mode
: M/s HEXA CO. IN JOINT VENTURE WITH M/s L.N MALVIYA INFRA PROJECT
INDEPENDENT ENGINEER
PVT. LTD. IN ASSOCIATION WITH NOKANG INFRA PVT LTD.
EPC CONTRACTOR : M/s. S.P.SINGLA CONSTRUCTION PVT. LTD.
COMPRESSIVE STRENGTH OF GROUT CUBES
Test Method : ( IS 516 )
Grade of Grout Date of Casting
Grade of Cement Size of Cube (cm) 10 x 10 x 10 cm
Age in Cube
Failure Average
Date of Identifica Weight of Density of Cube Strength
SI NO Load Strength Remarks
Testing tion Cube (g) (g) (N/mm²)
Days (KN) (N/mm²)
Number
Remarks:-