Project Name: LPS01 - 2B+G+6 RESIDENTIAL BUILDINGS

Document Title Inspection and Test Plan for Light Fixtures Date 22-OCT-22

Document No LPS-01-HTI-ITP-ELE-009 Rev. No. 0

Project : LPS-01 - 2B+G+6 RESIDENTIAL BUILDINGS

Employer : ALI HAMAD K ALTHANI

Project Design & Construction Qatar Design Consortium


Supervision Service Consultant: Neo-Spectrum

Main Contractor : HBK Contracting Company W.L.L.

Revision History

Issued for
LPS-01-HTI-ITP-EL-009 0 Review and
Approval
Rev. Purpose of Rev. by Appr. By Project
Doc. no. no. Date Submission Prep. By QA/QC Manager Manager
Project Name: LPS01 - 2B+G+6 RESIDENTIAL BUILDINGS

Document Title Inspection and Test Plan for Light Fixtures Date
22-OCT-22
Document No LPS-01-HTI-ITP-EL-009 Rev. No. 0

Legend: H=Hold Point, WIR to be issued and work shall not proceed without acceptance from the responsible party; W=Witness Point- WIR to be issued and work may proceed if the
responsible party does not attend; S=random surveillance, no signature or IRW required; R=“Record/ Document Review”(submitted separately as necessary);TRR=Test Report Review
Checks Intervention Points Verification
Documents
Control Documents Acceptance Criteria/

Contract
Contract

3rd Party
QDC/NE
# Works Checking Vol. Clause Tolerances (if applicable) Responsible Required

Sub-

or
or
O
Activity to be Job Function Frequency
Performed
1.0 Preliminary Activities of Documents & Approval
1.1 Project QCS-2014 & - Permit should be signed from Site Engineer / Initial H H W N/A Signed/Approv
Permits Project
Engineer/ all Safety Departments Safety Engineer ed Permits
Safety Specification
Engineer
1.2 Project QCS-2014 & QCS, - All materials shall be Electrical Prior Material H H W N/A Approved later
Approval of Project Section 21 Purchase and
Engineer/ QC submitted for approval in Engineer, Site Material
Material Specification Part 07 Delivery.
Engineer QCS 2014 ‐ accordance with the Engineer QC Submittals
Submittal light
Section 21 Part specifications and tender Inspector,
Fixtures 10 drawings. Accessories and
fittings as per approved
drawing

1.3 Project QCS-2014 & - As per Document latest Initial H H W N/A Shop Drawings
Shop Drawings Project
Engineer revision Approval status from Site Engineer Submittal
Approval Specification Engineer Documents

25 | 29
1.4 Project QCS-2014 & - As per Document latest Project Initial H H W N/A Approved
Method Project
Engineer/ QC revision Approval status from Engineer/ QC Latest Method
Statement Specification
Engineer Engineer Engineer Statement
Submittal
2.0 Pre-Installation Activities
2.1 Delivery Notes The QC will Section Visual Inspection/ Delivery Store-in- Upon Material H H W N/A Material
Material
& Batch check the 26 storage and handling as per Charge / Delivery Inspection
Delivery
Certificates material Manufacturer’s Instructions QC Engineer Request (MIR)
Inspection
according to
project
specification
3.0 Installation and Inspection Activities
3.1 Project QCS-2014 & Satisfactory mock‐up Project After Installation H H W N/A WIR shall be
Installation of Project
Engineer/ QC completion as per approved Engineer /QA- raised.
light fixtures in Specification
Engineer specification, dwg and WMS. QC Subcontractor
Hanger area Approved Shop
Drawing
Inspection
3.2 Project QCS-2014 & - Accessories and fittings as per Project After Installation H H W N/A Approved
Marking of Project
Engineer/ QC approved drawing Engineer /QA- Method
locations for Specification
Engineer QC statement &
light fixtures to Approved Shop
Inspection
be installed Drawing
Request
3.3 Project QCS-2014 & - Accessories and fittings as per Project After Installation H H W N/A Approved
Installation of Project
Engineer/ QC approved drawing Engineer /QA- Method
the light Specification
Engineer QC statement &
fixtures Approved Shop
Drawing
Inspection
Request
3.4 Final Inspection Project QCS-2014 & - No Defects Project After Installation H H W N/A Approved
Engineer/ QC Project Engineer /QA- Method
Engineer Specification QC statement &
Approved Inspection
Shop Request
Drawing

26 | 29
Appendix 2
10.3. Checklist for Light Fixtures

27 | 29
Project Name: LPS01 - 2B+G+6 RESIDENTIAL BUILDINGS

Document Title Checklist for Light Fixtures Date 22-oct-22

Document No LPS-01-HTI-ITP-EL-009 Rev. No. 0


Location/Area MST Ref. ITP Ref. WIR Ref. Date

LPS-01-HTI-MST-EL-009 LPS-01-HTI-ITP-EL-009
Confirm Y/N Inspected By
S. No Activities/Items to be inspected (Tick Mark) (Tick Mark) Remarks
Yes No Site Engineer&/ QC Inspector Others
Sub Cont.
Check whether the material is
1.
inspected and approved
Check whether the location of light
2. fixtures is as per the
approved co-ordination/RCP drawing
Check whether flexible conduit with
3. adapters is provided(wherever
applicable) as per approved drawings
Check whether wires are terminated
properly as per thespecifications,
4.
regulations and manufacturer
recommendations
Check whether the light fixtures are
5.
secured properly as required
Check whether the light fixtures are
6.
cleaned well
Check whether wattage and color of
lamp (day light & warmlight) are
7.
verified against the approved
material submittal
Check whether the light fixtures are
8.
free from damage
Check whether earth wires are
9. terminated in the earth respective
earth terminals
Check whether emergency battery
10.
pack is installed
Check whether the Installation of
11 Light fixtures is inspected
and approved
Check whether the Installation of
12 wiring accessories is
inspected and approved
13 Check for any damages or defects
Check whether the light fixtures are
14
not obstructed
Comments and Discrepancies (If any)
1

HexaTech Site Engineer HBK Inspector CSC (QDC) NEO/Others

28 | 29
Name Name Name Name

Position Position Position Position

Signature Signature Signature Signature

29 | 29