Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

]Bi ]LlUt ]E C OMt]EIt' ]t N]I]E]RNI\][ I ONA]L S]E]RV]I C]ES W" ]1.

]L
-(u
E\-

J=J
?r
I F DOHA, QATAR
@ ha.ld lodsg fwlhte

r
ffi et.-Bc-l$ F $T/A{1 I 4S 1?3
*#e,J1h-$eff*S23

auare3laN
To,

M/s ft.atar C*r":s#tr,

D*ha,
Qatar"

Attn: Dear Mr. Moharnqred El Saved

Dear Sir,

This is to inform you that we have attached our quotation with this quotation proposal letter: The
quotation has been framed as per the discussion held with your efforts have been made to rnake it is
comprehensive and inclusive as possible.

Unit Rate
Sl No Description Of ltems Unit Remarks
{Qan1
touare
3" lnstallation of stone paving 400*200*70mm Thick II 1*0.00
fMeter.
.:.

The above Quotation is based as per the scope of works and specifications from Qatar Consol. The works
associated (lnclusions and Exclusions) with Blue Comet are as given below.

O +97470640989 @info@bcis.qa @www.bcis.qa


\N]t:

a ]Bi lLUt]E COMt]E]t' ]INT]E]RN7\1I']I ONA]L S]E]RV]IC]ES W. ]1" ]L


='
,J
J
?r
e F DOHA, QATAR
@ huldt4dagfrqfd/rc

INCLUSIONS:

1. Skilled Manpower for stone paving installation work.


2. Supervision of the works"
3. To Provide the Cutling Machine for the cut pieces.
3. PPE, Transportaficn, Aeeommodation and Faad of the Manpower.
4. Daily Housekeeping of the area of works.

EXCLUSIGilIS:

1. Site Office, Rest Area, Drinking Water and Toilets.


2. All requireei Aneillaries and Materials.
3. Surveying and marking.
4. Materials Shifting Horizontal.
5. All the required Permissions.
6. HSE officer.
7" Work Cornpleted lnspeetians.

PAYMENT TE8M5:

' As per the company Standard,


Please revert back to me for Any Kind of Enquiry or Questions.

Thanks, and Regards

Abdul Raheem Mohammed

Nlanaging Director

Far BIue Comet Internaticnal Services"

@ +97470640989 @info@bcis.qa @www.bcis.qa


a ]E]LIUI]E COMI]E]I ]t Nlt-]E]RN7\1t']t ON?\11 S ]E]R\T]IC]ES W.]l.]L
==
SJ
J
?r
e_
F DOHA, QATAR
@ tusld. todag lhfhwe

fi q{. 8{L$IE$I/4C114$ i33


*#e,*$ep.&S?S

QUOTATICN
T0,

fvl/s Qata r C*nssl,

Dsh fr,
Qatar

Attn: Dear lVIr. Mohatnmed El Saved

Subiect: ln$tallatiqn of Stone Pavinq

Dear Sir,

This is to inform you that we have attached our quotation with this quotation proposal letter. The
quotation has been framed as per the discussion held with your efforts have been made to make it is
comprehensive and inclusive as possible.

Unit Rate
Sl No Description Sf ltems Unit Remarks
{aan1
Sq ua re
1 Installatlon sf 1*0.00
hlleter.

The above Quotation is based as per the scope of work


and specifications from Qatar Consol. The works
associated {lnclusions and Exclusions) with Blue Comet are as given below.

@ +97470640989 @info@bcis.qa @www.bcis.qa

You might also like