Preparation and Tack Up
Preparation and Tack Up: Use of Electrode Core Wire and Backing Plate
Assessment Criteria:
REFERENCES:
Welding Technology
2nd Edition
Gower A. Kennedy
Welding Guide
Fabrication Shop
Ismael V. Palabrica
Metal Works 1
SEDP Series
Industrial Technology
2. Perform step-by-step
procedure with caution.
Try to pass the self-check
3. Rate the quality of your weld for preparation and tack
using the marking schedule. up of carbon steel pipe.
ACTIVITY 1.1
Single-V Butt Joint Flat Position (1G)
Plan/Illustration
MARKING TABLE
15 - ______________________
FINAL POINTS = ______________________
MARKING SCHEDULE
Subtract 5 mark if the student did not use tools and materials properly.
2. Safety
Subtract 5 marks for each if the student did not observe his safety upon
doing his practical task
3. Pipe alignment