Stack Section Longitudinal Bars Analysis Combination Critical position Ratio Status
2 230x230 4Y16 3D Building Analysis 1 Bottom 0.791
Pass
1 230x230 4Y16 FE Chase Down 1 Top 0.689
Pass
Ties Summary
Stack Section Top support ties Span ties Bottom support ties Analysis Combination Ratio Status
2 230x230 - 1Y8-125 - 3D Building Analysis 1 0.251
Pass
1 230x230 - 1Y8-125 - FE Chase Down 1 0.229
Pass