WELDING TRACEABILITY RECORD

Document No : DUTA/P23-0022/WTR/2023

Revision No :0

CONNECT TO WELDER WELDING VISUAL NON DESTRUCTION EXAMINATION


LOWERING
JOINT SPOOL JOINT THICK SIZE STAMP WPS INSPECTION PENETRANT TEST RADIOGRAPHY TEST
NO TAG DWG NO. REV SHEET F/S MAT'L FIT UP WELD FILM REPORT REMARKS
NO. NO. TYPE MATERIAL 1 MATERIAL 2 (SCH) (Æ) No HOLIDAY TEST
DATE DATE REPORT DATE PT No. RESULT FILM R0 FILM R1 FILM R2 QTY NO
0 DATE RESULT DATE DATE DATE DATE
NO ACC REP ACC REP ACC REP

1 PIPING DT-BIG-PIP1-23-III-01 0 1/23 1 5/5 F BW Pipe Flange CS 40 8 05-Oct-2023 05-Oct-2023 WD-01 06-DT-WD-07 05-Oct-23 39 ACC 6-Oct 3 3 69 N/A 08-Sep-2023

2 PIPING DT-BIG-PIP1-23-III-01 0 1/23 2 4/5 F BW Flange Pipe CS 40 8 05-Oct-2023 05-Oct-2023 WD-02 06-DT-WD-07 05-Oct-23 39 ACC 6-Oct 3 3 69 N/A 08-Sep-2023

3 PIPING DT-BIG-PIP1-23-III-01 0 1/23 3 1/5 F BW Flange Pipe CS 80 8 14-Sep-2023 15-Sep-2023 WD-01 06-DT-WD-07 15-Sep-23 35 ACC 19-Sep 3 3 65 N/A 08-Sep-2023

4 PIPING DT-BIG-PIP1-23-III-01 0 1/23 4 1/5 S BW Pipe Red Tee 8 x 6 CS 80 8 21-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun 3 3 43 N/A 08-Sep-2023

5 PIPING DT-BIG-PIP1-23-III-01 0 1/23 5 1/5 S BW Red Tee 8 x 6 Pipe CS 80 8 21-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun 3 3 43 N/A 08-Sep-2023

6 PIPING DT-BIG-PIP1-23-III-01 0 1/23 6 1/5 S BW Pipe Flange WN CS 80 8 21-Jun-2023 22-Jun-2023 WD-01 06-DT-WD-07 22-Jun-23 26 ACC 30-Jun 3 3 43 N/A 08-Sep-2023

7 PIPING DT-BIG-PIP1-23-III-01 0 1/23 7 2/5 S BW Red Tee 8 x 6 Flange CS 80 6 26-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun 3 3 43 N/A 08-Sep-2023

8 PIPING DT-BIG-PIP1-23-III-01 0 1/23 8 2/5 S BW Flange WN Pipe CS 80 6 22-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun 3 3 44 N/A 08-Sep-2023

9 PIPING DT-BIG-PIP1-23-III-01 0 1/23 9 2/5 S SW Pipe Weldolet 6 x 1/2 CS 80 0.5 22-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun-23 1 ACC n/a N/A 08-Sep-2023

10 PIPING DT-BIG-PIP1-23-III-01 0 1/23 10 2/5 F SW Weldolet 6 x 1/2 Pipe CS 80 0.5 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep-23 1 ACC n/a N/A 08-Sep-2023

11 PIPING DT-BIG-PIP1-23-III-01 0 1/23 10A 2/5 F SW Pipe Valve CS 80 0.5 18-Aug-2023 18-Aug-2023 WD-01 06-DT-WD-07 18-Aug-23 31 ACC 22-Aug-23 1 ACC n/a N/A 08-Sep-2023

12 PIPING DT-BIG-PIP1-23-III-01 0 1/23 11 2/5 F BW Pipe Flange CS 80 6 20-Sep-2023 20-Sep-2023 WD-01 06-DT-WD-07 20-Sep-23 36 ACC 25-Sep 3 3 67 N/A 08-Sep-2023

13 PIPING DT-BIG-PIP1-23-III-01 0 1/23 12 3/5 S BW Flange WN Pipe CS 80 6 21-Jun-2023 22-Jun-2023 WD-02 06-DT-WD-07 22-Jun-23 26 ACC 30-Jun 3 3 44 N/A 08-Sep-2023

14 PIPING DT-BIG-PIP1-23-III-01 0 1/23 13 3/5 S SW Pipe Weldolet 6 x 1/2 CS 80 6 26-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun-23 1 ACC n/a N/A 08-Sep-2023

15 PIPING DT-BIG-PIP1-23-III-01 0 1/23 13A 3/5 F SW Weldolet 6 x 1/2 Pipe CS 80 0.5 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep-23 1 ACC n/a N/A 08-Sep-2023

16 PIPING DT-BIG-PIP1-23-III-01 0 1/23 14 3/5 F SW Pipe Valve CS 80 0.5 18-Aug-2023 18-Aug-2023 WD-01 06-DT-WD-07 18-Aug-23 31 ACC 22-Aug-23 1 ACC n/a N/A 08-Sep-2023

17 PIPING DT-BIG-PIP1-23-III-01 0 1/23 15 3/5 S BW Pipe Elbow 90 CS 80 6 21-Jun-2023 22-Jun-2023 WD-02 06-DT-WD-07 22-Jun-23 26 ACC 30-Jun 3 3 44 N/A 08-Sep-2023

18 PIPING DT-BIG-PIP1-23-III-01 0 1/23 16 3/5 S BW Elbow 90 Pipe CS 80 6 21-Jun-2023 27-Jun-2023 WD-01 06-DT-WD-07 27-Jun-23 27 ACC 30-Jun 3 3 44 N/A 08-Sep-2023

19 PIPING DT-BIG-PIP1-23-III-01 0 1/23 17 3/5 F BW Pipe IJ CS 80 6 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 67 N/A 08-Sep-2023 Golden Joint

20 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 18 1/4 F BW IJ Pipe CS 80 6 23-Sep-2023 23-Sep-2023 WD-02 06-DT-WD-07 23-Sep-23 37 ACC 24-Sep 3 3 66 N/A 08-Sep-2023 Golden Joint

21 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 19 1/4 F BW Pipe Elbow 45 CS 80 6 23-Sep-2023 23-Sep-2023 WD-02 06-DT-WD-07 23-Sep-23 37 ACC 24-Sep 3 3 66 N/A 08-Sep-2023

22 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 20 2/4 F BW Elbow 45 Pipe CS 80 6 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 67 N/A 08-Sep-2023

23 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 21 2/4 F BW Pipe Elbow 45 CS 80 6 07-Sep-2023 07-Sep-2023 WD-02 06-DT-WD-07 07-Sep-23 34 ACC 7-Sep 3 3 62 08-Sep-2023 08-Sep-2023

24 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 22 3/4 F BW Elbow 45 Pipe CS 80 6 30-Aug-2023 30-Aug-2023 WD-01 06-DT-WD-07 30-Aug-23 33 ACC 4-Sep 3 3 59 08-Sep-2023 08-Sep-2023

25 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 23 3/4 F BW Pipe Pipe CS 80 6 28-Aug-2023 06-Sep-2023 WD-02 06-DT-WD-07 06-Sep-23 33 ACC 4-Sep 2 1 7-Sep 1 4 59/59R 08-Sep-2023 08-Sep-2023

26 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 24 3/4 F BW Pipe Pipe CS 80 6 28-Aug-2023 06-Sep-2023 WD-02 06-DT-WD-07 06-Sep-23 33 ACC 4-Sep 1 2 7-Sep 2 5 59/59R 08-Sep-2023 08-Sep-2023

27 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 25 4/4 F BW Pipe Pipe CS 80 6 28-Aug-2023 06-Sep-2023 WD-02 06-DT-WD-07 06-Sep-23 33 ACC 4-Sep 2 1 7-Sep 1 4 59/59R 08-Sep-2023 08-Sep-2023

28 PIPE LINE DT-BIG-PIPL1-23-III-01 0 2/23 26 4/4 F BW Pipe Pipe CS 80 6 28-Aug-2023 07-Sep-2023 WD-02 06-DT-WD-07 07-Sep-23 34 ACC 4-Sep 1 2 7-Sep 2 5 59/59R 08-Sep-2023 08-Sep-2023

29 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 27 1/5 F BW Pipe Pipe CS 80 6 18-Sep-2023 18-Sep-2023 WD-02 06-DT-WD-07 18-Sep-23 36 ACC 19-Sep 3 3 65 08-Sep-2023 08-Sep-2023

30 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 28 1/5 F BW Pipe Pipe CS 80 6 30-Aug-2023 30-Aug-2023 WD-01 06-DT-WD-07 30-Aug-23 33 ACC 4-Sep 3 3 60 08-Sep-2023 08-Sep-2023

31 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 29 1/5 F BW Pipe Elbow 45 CS 80 6 23-Sep-2023 23-Sep-2023 WD-02 06-DT-WD-07 23-Sep-23 37 ACC 24-Sep 3 3 66 08-Sep-2023 08-Sep-2023

32 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 30 2/5 F BW Elbow 45 Pipe CS 80 6 09-Sep-2023 11-Sep-2023 WD-02 06-DT-WD-07 11-Sep-23 34 ACC 15-Sep 3 3 64 17-Sep-2023 08-Sep-2023

33 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 31 2/5 F BW Pipe Elbow 45 CS 80 6 23-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 68 N/A 08-Sep-2023

34 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 32 2/5 F BW Pipe Elbow 45 CS 80 6 18-Aug-2023 19-Aug-2023 WD-01 06-DT-WD-07 19-Aug-23 31 ACC 19-Aug 3 3 54 N/A 08-Sep-2023

35 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 33 2/5 F BW Pipe Pipe CS 80 6 15-Sep-2023 15-Sep-2023 WD-01 06-DT-WD-07 15-Sep-23 35 ACC 19-Sep 3 3 65 N/A 08-Sep-2023

36 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 33A 3/5 F BW Pipe Pipe CS 80 6 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 68 N/A 08-Sep-2023

37 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 34 3/5 F BW Pipe Elbow 45 CS 80 6 18-Aug-2023 18-Aug-2023 WD-01 06-DT-WD-07 18-Aug-23 31 ACC 19-Aug 3 3 54 N/A 08-Sep-2023

38 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 35 4/5 F BW Elbow 45 Pipe CS 80 6 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 68 N/A 08-Sep-2023

39 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 35A 4/5 F BW Pipe Pipe CS 80 6 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 68 N/A 08-Sep-2023

40 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 36 4/5 F BW Pipe Elbow 45 CS 80 6 02-Sep-2023 02-Sep-2023 WD-01 06-DT-WD-07 02-Sep-23 33 ACC 4-Sep 2 1 15-Sep 1 4 61/61R 17-Sep-2023 17-Sep-2023

41 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 37 4/5 F BW Elbow 45 Pipe CS 80 6 25-Sep-2023 25-Sep-2023 WD-01 06-DT-WD-07 25-Sep-23 38 ACC 25-Sep 3 3 68 17-Sep-2023 17-Sep-2023

42 PIPE LINE DT-BIG-PIPL1-23-III-02 0 3/23 38 5/5 F BW Pipe Pipe CS 80 6 30-Aug-2023 30-Aug-2023 WD-01 06-DT-WD-07 30-Aug-23 33 ACC 4-Sep 3 3 60 08-Sep-2023 17-Sep-2023

43 PIPE LINE DT-BIG-PIPL1-23-III-03 0 3/23 39 5/5 F BW Pipe Pipe CS 80 6 16-Sep-2023 15-Sep-2023 WD-01 06-DT-WD-07 15-Sep-23 35 ACC 19-Sep 3 3 65 08-Sep-2023 17-Sep-2023

44 PIPE LINE DT-BIG-PIPL1-23-III-03 0 4/23 40 1/3 F BW Pipe Pipe CS 80 6 07-Jun-2023 07-Jun-2023 WD-01 06-DT-WD-07 07-Jun-23 25 ACC 10-Jun 3 3 40 15-Jun-2023 15-Jun-2023

45 PIPE LINE DT-BIG-PIPL1-23-III-03 0 4/23 42 2/3 F BW Pipe Pipe CS 80 6 25-Aug-2023 26-Aug-2023 WD-01 06-DT-WD-07 26-Aug-23 32 ACC 28-Aug 3 3 57 31-Aug-2023 31-Aug-2023

46 PIPE LINE DT-BIG-PIPL1-23-III-03 0 4/23 43 2/3 F BW Pipe Pipe CS 80 6 25-Aug-2023 26-Aug-2023 WD-01 06-DT-WD-07 26-Aug-23 32 ACC 28-Aug 3 3 57 31-Aug-2023 31-Aug-2023

47 PIPE LINE DT-BIG-PIPL1-23-III-03 0 4/23 44 3/3 F BW Pipe Pipe CS 80 6 25-Aug-2023 26-Aug-2023 WD-01 06-DT-WD-07 26-Aug-23 32 ACC 28-Aug 3 3 57 31-Aug-2023 31-Aug-2023

48 PIPE LINE DT-BIG-PIPL1-23-III-03 0 4/23 45 3/3 F BW Pipe Pipe CS 80 6 31-Aug-2023 02-Sep-2023 WD-01 06-DT-WD-07 02-Sep-23 33 ACC 4-Sep 2 1 15-Sep 1 4 60/60R 31-Aug-2023 31-Aug-2023

49 PIPE LINE DT-BIG-PIPL1-23-III-03 0 4/23 47 2/3 F BW Pipe Pipe CS 80 6 02-Sep-2023 02-Sep-2023 WD-01 06-DT-WD-07 02-Sep-23 33 ACC 4-Sep 1 1 15-Sep 1 3 60/60R 17-Sep-2023 17-Sep-2023

50 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 48 2/4 F BW Pipe Pipe CS 80 6 02-Sep-2023 02-Sep-2023 WD-01 06-DT-WD-07 02-Sep-23 33 ACC 4-Sep 1 1 15-Sep 1 3 61/61R 17-Sep-2023 17-Sep-2023

51 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 49 2/4 F BW Pipe Pipe CS 80 6 24-Aug-2023 25-Aug-2023 WD-01 06-DT-WD-07 25-Aug-23 32 ACC 28-Aug 3 3 58 31-Aug-2023 31-Aug-2023

52 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 50 2/4 F BW Pipe Pipe CS 80 6 24-Aug-2023 24-Aug-2023 WD-01 06-DT-WD-07 24-Aug-23 32 ACC 28-Aug 3 3 58 31-Aug-2023 31-Aug-2023

10/6/2023 - 13:34 - Welding Traceability Report - Page : 1 of 5


WELDING TRACEABILITY RECORD
Document No : DUTA/P23-0022/WTR/2023

Revision No :0

CONNECT TO WELDER WELDING VISUAL NON DESTRUCTION EXAMINATION


LOWERING
JOINT SPOOL JOINT THICK SIZE STAMP WPS INSPECTION PENETRANT TEST RADIOGRAPHY TEST
NO TAG DWG NO. REV SHEET F/S MAT'L FIT UP WELD FILM REPORT REMARKS
NO. NO. TYPE MATERIAL 1 MATERIAL 2 (SCH) (Æ) No HOLIDAY TEST
DATE DATE REPORT DATE PT No. RESULT FILM R0 FILM R1 FILM R2 QTY NO
0 DATE RESULT DATE DATE DATE DATE
NO ACC REP ACC REP ACC REP

53 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 51 3/4 F BW Pipe Pipe CS 80 6 22-Aug-2023 24-Aug-2023 WD-01 06-DT-WD-07 24-Aug-23 32 ACC 28-Aug 3 3 58 31-Aug-2023 31-Aug-2023

54 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 52 3/4 F BW Pipe Elbow 90 CS 80 6 22-Aug-2023 22-Aug-2023 WD-02 06-DT-WD-07 22-Aug-23 31 ACC 28-Aug 3 3 58 17-Sep-2023 17-Sep-2023

55 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 53 3/4 F BW Elbow 90 Pipe CS 80 6 22-Aug-2023 22-Aug-2023 WD-02 06-DT-WD-07 22-Aug-23 31 ACC 4-Sep 1 2 15-Sep 1 24-Sep 1 5 61/61R 17-Sep-2023 17-Sep-2023

56 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 54 4/4 F BW Pipe Pipe CS 80 6 07-Jun-2023 07-Jun-2023 WD-02 06-DT-WD-07 07-Jun-23 25 ACC 10-Jun 3 3 40 15-Jun-2023 05-Aug-2023

57 PIPE LINE DT-BIG-PIPL1-23-III-04 0 5/23 55 4/4 F BW Pipe Pipe CS 80 6 04-Jul-2023 04-Jul-2023 WD-02 06-DT-WD-07 04-Jul-23 27 ACC 8-Jul 2 1 12-Jul 1 4 45/45R 11-Jul-2023 05-Aug-2023

58 PIPING DT-BIG-PIP2-23-III-01 0 6/23 56 2/4 F BW Pipe Pipe CS 80 6 31-Aug-2023 31-Aug-2023 WD-01 06-DT-WD-07 31-Aug-23 33 ACC 4-Sep 2 1 15-Sep 1 4 61/61R 17-Sep-2023 31-Aug-2023

59 PIPING DT-BIG-PIP2-23-III-01 0 6/23 56A 1/3 F BW Pipe Pipe CS 80 6 16-Aug-2023 16-Aug-2023 WD-01 06-DT-WD-07 16-Aug-23 31 ACC 19-Aug 3 3 55 31-Aug-2023 31-Aug-2023

60 PIPING DT-BIG-PIP2-23-III-01 0 6/23 57 1/3 F BW Pipe Elbow 45 CS 80 6 16-Aug-2023 16-Aug-2023 WD-01 06-DT-WD-07 16-Aug-23 31 ACC 19-Aug 3 3 55 31-Aug-2023 31-Aug-2023

61 PIPING DT-BIG-PIP2-23-III-01 0 6/23 58 2/3 F BW Elbow 45 Pipe CS 80 6 25-Aug-2023 25-Aug-2023 WD-01 06-DT-WD-07 25-Aug-23 32 ACC 28-Aug 3 3 58 31-Aug-2023 31-Aug-2023

62 PIPING DT-BIG-PIP2-23-III-01 0 6/23 59 2/3 F BW Pipe Elbow 45 CS 80 6 06-Sep-2023 07-Sep-2023 WD-01 06-DT-WD-07 07-Sep-23 34 ACC 15-Sep 3 3 64 N/A 31-Aug-2023

63 PIPING DT-BIG-PIP2-23-III-01 0 6/23 60 2/3 F BW Elbow 45 Pipe CS 80 6 06-Sep-2023 07-Sep-2023 WD-01 06-DT-WD-07 07-Sep-23 34 ACC 15-Sep 3 3 64 N/A 31-Aug-2023

64 PIPING DT-BIG-PIP2-23-III-01 0 6/23 62 2/3 F BW Pipe IJ CS 80 6 14-Sep-2023 15-Sep-2023 WD-01 06-DT-WD-07 15-Sep-23 35 ACC 19-Sep 3 3 65 N/A 31-Aug-2023

65 PIPING DT-BIG-PIP2-23-III-01 0 6/23 63 2/3 F BW IJ Pipe CS 80 6 14-Sep-2023 15-Sep-2023 WD-01 06-DT-WD-07 15-Sep-23 35 ACC 19-Sep 3 3 65 N/A 31-Aug-2023

66 PIPING DT-BIG-PIP2-23-III-01 0 6/23 64 2/3 F BW Pipe Con. Red 6 x 4 CS 80 6 02-Oct-2023 02-Oct-2023 WD-01 06-DT-WD-07 02-Oct-23 39 ACC 02-Oct-23 1 ACC 6-Oct 3 3 69 N/A 31-Aug-2023 Golden Joint

67 PIPING DT-BIG-PIP2-23-III-01 0 6/23 65 3/3 F BW Con. Red 6 x 4 Pipe CS 80 4 04-Sep-2023 04-Sep-2023 WD-01 06-DT-WD-07 04-Sep-23 33 ACC 7-Sep 3 3 62 N/A 31-Aug-2023

68 PIPING DT-BIG-PIP2-23-III-01 0 6/23 66 3/3 F BW Pipe Flange WN CS 80 4 04-Sep-2023 04-Sep-2023 WD-01 06-DT-WD-07 04-Sep-23 33 ACC 7-Sep 3 3 62 N/A 31-Aug-2023

69 PIPING DT-BIG-PIP3-23-III-01 0 7/23 67 1/4 S BW Flange WN Pipe CS 40 4 26-Apr-2023 04-May-2023 WD-02 06-DT-WD-07 04-May-23 12 ACC 4-May 3 3 12 N/A 31-Aug-2023

70 PIPING DT-BIG-PIP3-23-III-01 0 7/23 68 1/4 S BW Pipe Elbow 90 CS 40 4 26-Apr-2023 04-May-2023 WD-02 06-DT-WD-07 04-May-23 12 ACC 9-May 3 3 14 N/A 31-Aug-2023

71 PIPING DT-BIG-PIP3-23-III-01 0 7/23 69 1/4 S BW Elbow 90 Pipe CS 40 4 26-Apr-2023 05-May-2023 WD-02 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 14 N/A 31-Aug-2023

72 PIPING DT-BIG-PIP3-23-III-01 0 7/23 70 2/4 F BW Pipe Elbow 90 CS 40 4 04-Sep-2023 05-Sep-2023 WD-01 06-DT-WD-07 05-Sep-23 33 ACC 7-Sep 3 3 62 N/A 31-Aug-2023

73 PIPING DT-BIG-PIP3-23-III-01 0 7/23 71 2/4 S BW Elbow 90 Pipe CS 40 4 26-Apr-2023 04-May-2023 WD-01 06-DT-WD-07 04-May-23 12 ACC 9-May 3 3 14 N/A 31-Aug-2023

74 PIPING DT-BIG-PIP3-23-III-01 0 7/23 72 2/4 S BW Pipe Con Red 6 x 4 CS 40 4 26-Apr-2023 05-May-2023 WD-01 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 14 N/A 31-Aug-2023

75 PIPING DT-BIG-PIP3-23-III-01 0 7/23 73 2/4 S BW Con Red 6 x 4 Pipe CS 40 6 02-Oct-2023 02-Oct-2023 WD-01 06-DT-WD-07 02-Oct-23 39 ACC 02-Oct-23 1 ACC 6-Oct 3 3 69 N/A 31-Aug-2023 Golden Joint

76 PIPING DT-BIG-PIP3-23-III-01 0 7/23 73A 2/4 F BW Pipe IJ CS 40 6 14-Sep-2023 14-Sep-2023 WD-01 06-DT-WD-07 14-Sep-23 34 ACC 15-Sep 3 3 64 N/A 31-Aug-2023 IJ

77 PIPING DT-BIG-PIP3-23-III-01 0 7/23 73B 2/4 F BW IJ Pipe CS 40 6 14-Sep-2023 14-Sep-2023 WD-01 06-DT-WD-07 14-Sep-23 34 ACC 15-Sep 3 3 64 N/A 31-Aug-2023 IJ

78 PIPING DT-BIG-PIP3-23-III-01 0 7/23 74 3/4 F BW Pipe Elbow 45 CS 40 6 04-Sep-2023 04-Sep-2023 WD-01 06-DT-WD-07 04-Sep-23 33 ACC 7-Sep 3 3 62 N/A 31-Aug-2023 IJ

79 PIPING DT-BIG-PIP3-23-III-01 0 7/23 75 3/4 S BW Elbow 45 Pipe CS 40 6 28-Apr-2023 06-May-2023 WD-02 06-DT-WD-07 06-May-23 14 ACC 9-May 3 3 15 N/A 31-Aug-2023

80 PIPING DT-BIG-PIP3-23-III-01 0 7/23 76 3/4 F BW Elbow 45 Pipe CS 40 6 07-Jun-2023 07-Jun-2023 WD-02 06-DT-WD-07 07-Jun-23 25 ACC 10-Jun 3 3 40 15-Jun-2023 19-Jun-2023

81 PIPING DT-BIG-PIP3-23-III-01 0 7/23 77 4/4 S BW Elbow 45 Pipe CS 40 6 28-Apr-2023 08-May-2023 WD-01 06-DT-WD-07 08-May-23 15 ACC 9-May 3 3 15 15-Jun-2023 19-Jun-2023

82 PIPING DT-BIG-PIP3-23-III-01 0 7/23 78 4/4 S BW Pipe Pipe CS 40 6 28-Apr-2023 05-May-2023 WD-01 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 15 15-Jun-2023 19-Jun-2023

83 PIPING DT-BIG-PIP3-23-III-01 0 7/23 79 4/4 F BW Pipe Pipe CS 40 6 07-Jul-2023 07-Jul-2023 WD-02 06-DT-WD-07 07-Jul-23 28 ACC 8-Jul 3 3 46 11-Jul-2023 07-Jul-2023

84 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 80 1/6 S BW Pipe Pipe CS 40 6 14-Apr-2023 15-Apr-2023 WD-01 06-DT-WD-07 15-Apr-23 1 ACC 26-Apr 3 3 2 11-Jul-2023 07-Jul-2023

85 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 81 1/6 F BW Pipe Pipe CS 40 6 07-Jul-2023 07-Jul-2023 WD-02 06-DT-WD-07 07-Jul-23 28 ACC 8-Jul 3 3 46 11-Jul-2023 07-Jul-2023

86 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 82 2/6 S BW Pipe Pipe CS 40 6 17-Apr-2023 25-Apr-2023 WD-01 06-DT-WD-07 25-Apr-23 6 ACC 26-Apr 3 3 7 11-Jul-2023 04-Jul-2023

87 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 83 2/6 S BW Pipe Elbow 90 CS 40 6 25-Apr-2023 03-May-2023 WD-01 06-DT-WD-07 03-May-23 11 ACC 4-May 3 3 9 11-Jul-2023 04-Jul-2023

88 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 84 2/6 F BW Elbow 90 Pipe CS 40 6 05-Jul-2023 05-Jul-2023 WD-02 06-DT-WD-07 05-Jul-23 27 ACC 8-Jul 3 3 46 11-Jul-2023 04-Jul-2023

89 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 85 3/6 S BW Pipe Pipe CS 40 6 14-Apr-2023 15-Apr-2023 WD-01 06-DT-WD-07 15-Apr-23 1 ACC 26-Apr 3 3 2 03-Jun-2023 12-Jun-2023

90 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 86 4/6 F BW Pipe Pipe CS 40 6 10-May-2023 10-May-2023 WD-02 06-DT-WD-07 10-May-23 18 ACC 20-May 1 2 1-Jun 2 5 22/35 03-Jun-2023 12-Jun-2023

91 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 87 4/6 S BW Pipe Pipe CS 40 6 14-Apr-2023 15-Apr-2023 WD-01 06-DT-WD-07 15-Apr-23 1 ACC 26-Apr 3 3 2 03-Jun-2023 12-Jun-2023

92 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 88 4/6 F BW Pipe Pipe CS 40 6 12-May-2023 12-May-2023 WD-02 06-DT-WD-07 12-May-23 18 ACC 20-May 1 2 1-Jun 2 5 22/35 03-Jun-2023 12-Jun-2023

93 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 89 5/6 S BW Pipe Pipe CS 40 6 14-Apr-2023 15-Apr-2023 WD-01 06-DT-WD-07 15-Apr-23 1 ACC 26-Apr 3 3 7 03-Jun-2023 12-Jun-2023

94 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 90 5/6 F BW Pipe Pipe CS 40 6 12-May-2023 12-May-2023 WD-02 06-DT-WD-07 12-May-23 18 ACC 20-May 3 3 22 03-Jun-2023 12-Jun-2023

95 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 91 6/6 S BW Pipe Pipe CS 40 6 14-Apr-2023 15-Apr-2023 WD-01 06-DT-WD-07 15-Apr-23 1 ACC 26-Apr 3 3 2 03-Jun-2023 12-Jun-2023

96 PIPE LINE DT-BIG-PIPL2-23-III-01 0 8/23 92 6/6 F BW Pipe Pipe CS 40 6 11-May-2023 11-May-2023 WD-02 06-DT-WD-07 11-May-23 18 ACC 20-May 3 3 22 03-Jun-2023 12-Jun-2023

97 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 93 1/4 S BW Pipe Pipe CS 40 6 14-Apr-2023 17-Apr-2023 WD-01 06-DT-WD-07 17-Apr-23 2 ACC 26-Apr 3 3 3 03-Jun-2023 12-Jun-2023

98 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 94 1/4 F BW Pipe Pipe CS 40 6 13-May-2023 13-May-2023 WD-02 06-DT-WD-07 13-May-23 18 ACC 20-May 3 3 23 03-Jun-2023 12-Jun-2023

99 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 95 2/4 S BW Pipe Pipe CS 40 6 15-Apr-2023 19-Apr-2023 WD-01 06-DT-WD-07 19-Apr-23 4 ACC 26-Apr 3 3 3 03-Jun-2023 12-Jun-2023

100 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 96 2/4 F BW Pipe Pipe CS 40 6 13-May-2023 13-May-2023 WD-02 06-DT-WD-07 13-May-23 18 ACC 20-May 3 3 23 03-Jun-2023 12-Jun-2023

101 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 97 3/4 S BW Pipe Pipe CS 40 6 15-Apr-2023 19-Apr-2023 WD-01 06-DT-WD-07 19-Apr-23 4 ACC 26-Apr 3 3 7 03-Jun-2023 12-Jun-2023

102 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 98 3/4 F BW Pipe Pipe CS 40 6 13-May-2023 13-May-2023 WD-02 06-DT-WD-07 15-May-23 18 ACC 20-May 3 3 23 03-Jun-2023 12-Jun-2023

103 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 99 4/4 F BW Pipe Pipe CS 40 6 22-Jun-2023 22-Jun-2023 WD-02 06-DT-WD-07 22-Jun-23 26 ACC 24-Jun 3 3 42 03-Jun-2023 12-Jun-2023

104 PIPE LINE DT-BIG-PIPL2-23-III-02 0 9/23 100 4/4 F BW Pipe Pipe CS 40 6 13-May-2023 13-May-2023 WD-02 06-DT-WD-07 15-May-23 18 ACC 20-May 3 3 23 03-Jun-2023 12-Jun-2023

10/6/2023 - 13:34 - Welding Traceability Report - Page : 2 of 5


WELDING TRACEABILITY RECORD
Document No : DUTA/P23-0022/WTR/2023

Revision No :0

CONNECT TO WELDER WELDING VISUAL NON DESTRUCTION EXAMINATION


LOWERING
JOINT SPOOL JOINT THICK SIZE STAMP WPS INSPECTION PENETRANT TEST RADIOGRAPHY TEST
NO TAG DWG NO. REV SHEET F/S MAT'L FIT UP WELD FILM REPORT REMARKS
NO. NO. TYPE MATERIAL 1 MATERIAL 2 (SCH) (Æ) No HOLIDAY TEST
DATE DATE REPORT DATE PT No. RESULT FILM R0 FILM R1 FILM R2 QTY NO
0 DATE RESULT DATE DATE DATE DATE
NO ACC REP ACC REP ACC REP

105 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 101 1/4 S BW Pipe Pipe CS 40 6 15-Apr-2023 18-Apr-2023 WD-01 06-DT-WD-07 18-Apr-23 3 ACC 26-Apr 3 3 8 03-Jun-2023 12-Jun-2023

106 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 102 1/4 F BW Pipe Pipe CS 40 6 15-May-2023 15-May-2023 WD-01 06-DT-WD-07 15-May-23 18 ACC 20-May 3 3 24 03-Jun-2023 12-Jun-2023

107 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 103 2/4 S BW Pipe Pipe CS 40 6 15-Apr-2023 18-Apr-2023 WD-01 06-DT-WD-07 18-Apr-23 3 ACC 26-Apr 3 3 4 03-Jun-2023 12-Jun-2023

108 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 104 2/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-01 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 35 03-Jun-2023 12-Jun-2023

109 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 105 3/4 S BW Pipe Pipe CS 40 6 15-Apr-2023 18-Apr-2023 WD-01 06-DT-WD-07 18-Apr-23 3 ACC 26-Apr 3 3 4 03-Jun-2023 12-Jun-2023

110 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 106 3/4 F BW Pipe Pipe CS 40 6 16-May-2023 16-May-2023 WD-01 06-DT-WD-07 16-May-23 18 ACC 20-May 3 3 24 03-Jun-2023 12-Jun-2023

111 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 107 4/4 S BW Pipe Pipe CS 40 6 15-Apr-2023 17-Apr-2023 WD-01 06-DT-WD-07 17-Apr-23 2 ACC 26-Apr 3 3 4 03-Jun-2023 12-Jun-2023

112 PIPE LINE DT-BIG-PIPL2-23-III-03 0 10/23 108 4/4 F BW Pipe Pipe CS 40 6 16-May-2023 16-May-2023 WD-02 06-DT-WD-07 16-May-23 18 ACC 20-May 3 3 24 03-Jun-2023 12-Jun-2023

113 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 109 1/4 S BW Pipe Pipe CS 40 6 17-Apr-2023 18-Apr-2023 WD-01 06-DT-WD-07 18-Apr-23 3 ACC 26-Apr 3 3 5 03-Jun-2023 12-Jun-2023

114 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 110 1/4 F BW Pipe Pipe CS 40 6 16-May-2023 16-May-2023 WD-02 06-DT-WD-07 16-May-23 18 ACC 20-May 3 3 25 03-Jun-2023 12-Jun-2023

115 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 111 2/4 S BW Pipe Pipe CS 40 6 17-Apr-2023 25-Apr-2023 WD-01 06-DT-WD-07 25-Apr-23 6 ACC 26-Apr 3 3 5 03-Jun-2023 12-Jun-2023

116 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 112 2/4 F BW Pipe Pipe CS 40 6 16-May-2023 17-May-2023 WD-01 06-DT-WD-07 17-May-23 18 ACC 20-May 3 3 25 03-Jun-2023 12-Jun-2023

117 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 113 3/4 S BW Pipe Pipe CS 40 6 18-Apr-2023 20-Apr-2023 WD-01 06-DT-WD-07 20-Apr-23 5 ACC 26-Apr 3 3 8 03-Jun-2023 12-Jun-2023

118 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 114 3/4 F BW Pipe Pipe CS 40 6 17-May-2023 17-May-2023 WD-02 06-DT-WD-07 17-May-23 18 ACC 20-May 3 3 25 03-Jun-2023 12-Jun-2023

119 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 115 4/4 S BW Pipe Pipe CS 40 6 18-Apr-2023 20-Apr-2023 WD-01 06-DT-WD-07 20-Apr-23 5 ACC 26-Apr 3 3 8 03-Jun-2023 12-Jun-2023

120 PIPE LINE DT-BIG-PIPL2-23-III-04 0 11/23 116 4/4 F BW Pipe Pipe CS 40 6 17-May-2023 19-May-2023 WD-01 06-DT-WD-07 19-May-23 19 ACC 20-May 3 3 25 03-Jun-2023 12-Jun-2023

121 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 117 1/4 S BW Pipe Pipe CS 40 6 18-Apr-2023 04-May-2023 WD-02 06-DT-WD-07 04-May-23 12 ACC 9-May 3 3 13 12-Jun-2023 12-Jun-2023

122 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 118 1/4 F BW Pipe Pipe CS 40 6 17-May-2023 19-May-2023 WD-02 06-DT-WD-07 19-May-23 19 ACC 20-May 1 2 1-Jun 2 5 26/35 12-Jun-2023 12-Jun-2023

123 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 119 2/4 S BW Pipe Pipe CS 40 6 18-Apr-2023 03-May-2023 WD-02 06-DT-WD-07 03-May-23 11 ACC 4-May 3 3 9 12-Jun-2023 12-Jun-2023

124 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 120 2/4 F BW Pipe Pipe CS 40 6 28-Jun-2023 28-Jun-2023 WD-02 06-DT-WD-07 28-Jun-23 27 ACC 26-Jul 2 1 5-Aug 1 4 51/51R N/A 28-Jun-2023

125 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 121 3/4 S BW Pipe Pipe CS 40 6 19-Apr-2023 20-Apr-2023 WD-01 06-DT-WD-07 20-Apr-23 5 ACC 26-Apr 3 3 6 15-Jun-2023 28-Jun-2023

126 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 122 3/4 F BW Pipe Pipe CS 40 6 19-May-2023 19-May-2023 WD-01 06-DT-WD-07 19-May-23 19 ACC 20-May 3 3 26 15-Jun-2023 28-Jun-2023

127 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 123 4/4 S BW Pipe Pipe CS 40 6 19-Apr-2023 27-Apr-2023 WD-01 06-DT-WD-07 27-Apr-23 7 ACC 4-May 3 3 9 15-Jun-2023 28-Jun-2023

128 PIPE LINE DT-BIG-PIPL2-23-III-05 0 12/23 124 4/4 F BW Pipe Pipe CS 40 6 19-May-2023 19-May-2023 WD-01 06-DT-WD-07 19-May-23 19 ACC 20-May 3 3 26 15-Jun-2023 28-Jun-2023

129 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 124A 4/4 F BW Pipe Pipe CS 40 6 24-Jul-2023 25-Jul-2023 WD-02 06-DT-WD-07 25-Jul-23 29 ACC 26-Jul 3 50 15-Jun-2023 28-Jun-2023

130 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 125 1/4 S BW Pipe Pipe CS 40 6 19-Apr-2023 28-Apr-2023 WD-01 06-DT-WD-07 28-Apr-23 8 ACC 4-May 3 3 10 15-Jun-2023 24-Jul-2023

131 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 126 1/4 F BW Pipe Pipe CS 40 6 19-May-2023 19-May-2023 WD-01 06-DT-WD-07 19-May-23 19 ACC 1-Jun 2 1 10-Jun 1 4 31/39 15-Jun-2023 24-Jul-2023

132 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 127 2/4 S BW Pipe Pipe CS 40 6 19-Apr-2023 28-Apr-2023 WD-01 06-DT-WD-07 28-Apr-23 8 ACC 4-May 3 3 10 15-Jun-2023 24-Jul-2023

133 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 128 2/4 F BW Pipe Pipe CS 40 6 20-May-2023 20-May-2023 WD-01 06-DT-WD-07 20-May-23 19 ACC 1-Jun 3 3 31 15-Jun-2023 24-Jul-2023

134 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 129 3/4 S BW Pipe Pipe CS 40 6 20-Apr-2023 02-May-2023 WD-02 06-DT-WD-07 02-May-23 9 ACC 4-May 3 3 10 15-Jun-2023 24-Jul-2023

135 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 130 3/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-02 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 31 15-Jun-2023 24-Jul-2023

136 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 131 4/4 S BW Pipe Pipe CS 40 6 20-Apr-2023 02-May-2023 WD-02 06-DT-WD-07 02-May-23 9 ACC 4-May 3 3 10 15-Jun-2023 24-Jul-2023

137 PIPE LINE DT-BIG-PIPL2-23-III-06 0 13/23 132 4/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-02 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 31 15-Jun-2023 24-Jul-2023

138 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 133 1/4 S BW Pipe Pipe CS 40 6 20-Apr-2023 02-May-2023 WD-02 06-DT-WD-07 02-May-23 10 ACC 4-May 3 3 11 15-Jun-2023 24-Jul-2023

139 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 134 1/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-02 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 32 15-Jun-2023 24-Jul-2023

140 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 135 2/4 S BW Pipe Pipe CS 40 6 20-Apr-2023 02-May-2023 WD-02 06-DT-WD-07 02-May-23 10 ACC 4-May 3 3 11 15-Jun-2023 24-Jul-2023

141 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 136 2/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-01 06-DT-WD-07 30-May-23 23 ACC 1-Jun 2 1 10-Jun 1 4 32/39 15-Jun-2023 24-Jul-2023

142 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 137 3/4 S BW Pipe Pipe CS 40 6 25-Apr-2023 04-May-2023 WD-01 06-DT-WD-07 04-May-23 12 ACC 4-May 3 3 11 15-Jun-2023 24-Jul-2023

143 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 138 3/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-01 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 32 15-Jun-2023 24-Jul-2023

144 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 139 4/4 S BW Pipe Pipe CS 40 6 25-Apr-2023 04-May-2023 WD-02 06-DT-WD-07 04-May-23 12 ACC 9-May 3 3 13 15-Jun-2023 24-Jul-2023

145 PIPE LINE DT-BIG-PIPL2-23-III-07 0 14/23 140 4/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-01 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 32 15-Jun-2023 24-Jul-2023

146 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 141 1/5 S BW Pipe Pipe CS 40 6 25-Apr-2023 03-May-2023 WD-02 06-DT-WD-07 03-May-23 11 ACC 4-May 3 3 11 15-Jun-2023 24-Jul-2023

147 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 142 1/5 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-02 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 35 15-Jun-2023 24-Jul-2023

148 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 143 2/5 S BW Pipe Pipe CS 40 6 27-Apr-2023 05-May-2023 WD-01 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 16 15-Jun-2023 24-Jul-2023

149 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 144A 3/5 F BW Pipe Weldolet 6x1 CS 40 6 16-Sep-2023 16-Sep-2023 WD-01 06-DT-WD-07 16-Sep-23 35 ACC 16-Sep-23 1 ACC n/a N/A 24-Jul-2023 No HT

150 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 144B 3/5 F BW Weldolet 6x1 Pipe CS 40 1 16-Sep-2023 16-Sep-2023 WD-01 06-DT-WD-07 16-Sep-23 35 ACC 16-Sep-23 1 ACC n/a N/A 24-Jul-2023 No HT

151 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 144C 3/5 F SW Pipe Valve CS 40 1 16-Sep-2023 16-Sep-2023 WD-01 06-DT-WD-07 16-Sep-23 35 ACC 16-Sep-23 1 ACC n/a N/A 24-Jul-2023

152 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 145 4/5 F BW Pipe Elbow 90 CS 40 6 27-Jul-2023 27-Jul-2023 WD-02 06-DT-WD-07 27-Jul-23 29 ACC 5-Aug 3 3 52 N/A 24-Jul-2023

153 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 146 3/5 S BW Elbow 90 Equal Tee CS 40 6 02-May-2023 05-May-2023 WD-02 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 17 N/A 24-Jul-2023

154 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 147 3/5 S BW Equal Tee Flange WN CS 40 6 02-May-2023 05-May-2023 WD-02 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 17 N/A 24-Jul-2023

155 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 147A 3/5 F BW Equal Tee Flange WN CS 40 6 02-May-2023 06-May-2023 WD-02 06-DT-WD-07 06-May-23 14 ACC 9-May 3 3 16 N/A 24-Jul-2023

156 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 147B 3/5 F BW Flange WN Pipe CS 40 6 26-Jul-2023 26-Jul-2023 WD-02 06-DT-WD-07 26-Jul-23 29 ACC 5-Aug 3 3 52 N/A 24-Jul-2023

10/6/2023 - 13:34 - Welding Traceability Report - Page : 3 of 5


WELDING TRACEABILITY RECORD
Document No : DUTA/P23-0022/WTR/2023

Revision No :0

CONNECT TO WELDER WELDING VISUAL NON DESTRUCTION EXAMINATION


LOWERING
JOINT SPOOL JOINT THICK SIZE STAMP WPS INSPECTION PENETRANT TEST RADIOGRAPHY TEST
NO TAG DWG NO. REV SHEET F/S MAT'L FIT UP WELD FILM REPORT REMARKS
NO. NO. TYPE MATERIAL 1 MATERIAL 2 (SCH) (Æ) No HOLIDAY TEST
DATE DATE REPORT DATE PT No. RESULT FILM R0 FILM R1 FILM R2 QTY NO
0 DATE RESULT DATE DATE DATE DATE
NO ACC REP ACC REP ACC REP

157 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 147C 3/5 F BW Pipe Cap CS 40 6 26-Jul-2023 26-Jul-2023 WD-02 06-DT-WD-07 26-Jul-23 29 ACC 22-Aug-23 1 ACC n/a N/A 24-Jul-2023

158 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 148 4/5 F BW Flange WN Pipe CS 40 6 27-Jul-2023 27-Jul-2023 WD-02 06-DT-WD-07 27-Jul-23 29 ACC 5-Aug 3 3 52 N/A 24-Jul-2023

159 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 149 4/5 F BW Pipe Pipe CS 40 6 08-Jun-2023 08-Jun-2023 WD-02 06-DT-WD-07 08-Jun-23 25 ACC 10-Jun 3 3 39 15-Jun-2023 17-Jun-2023

160 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 150 5/5 S BW Pipe Pipe CS 40 6 27-Apr-2023 06-May-2023 WD-01 06-DT-WD-07 06-May-23 14 ACC 9-May 3 3 16 15-Jun-2023 17-Jun-2023

161 PIPE LINE DT-BIG-PIPL2-23-III-08 0 15/23 151 5/5 F BW Pipe Pipe CS 40 6 14-Jul-2023 14-Jul-2023 WD-02 06-DT-WD-07 15-Jul-23 28 ACC 17-Jul 2 1 26-Jul 1 4 49 / 49R 15-Jun-2023 14-Jul-2023

162 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 152 1/5 S BW Pipe Pipe CS 40 6 06-May-2023 08-May-2023 WD-02 06-DT-WD-07 08-May-23 15 ACC 9-May 3 3 13 11-Jul-2023 14-Jul-2023

163 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 153 1/5 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-02 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 33 11-Jul-2023 14-Jul-2023

164 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 154 2/5 S BW Pipe Pipe CS 40 6 06-May-2023 08-May-2023 WD-02 06-DT-WD-07 08-May-23 15 ACC 9-May 3 3 13 11-Jul-2023 14-Jul-2023

165 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 155 2/5 F BW Pipe Pipe CS 40 6 26-May-2023 27-May-2023 WD-02 06-DT-WD-07 27-May-23 22 ACC 1-Jun 3 3 33 11-Jul-2023 14-Jul-2023

166 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 156 3/5 S BW Pipe Pipe CS 40 6 06-May-2023 08-May-2023 WD-02 06-DT-WD-07 08-May-23 15 ACC 15-May 3 3 19 11-Jul-2023 14-Jul-2023

167 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 157 3/5 F BW Pipe Pipe CS 40 6 26-May-2023 27-May-2023 WD-01 06-DT-WD-07 27-May-23 22 ACC 1-Jun 2 1 10-Jun 1 4 33/39 11-Jul-2023 14-Jul-2023

168 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 158 4/5 S BW Pipe Pipe CS 40 6 08-May-2023 09-May-2023 WD-02 06-DT-WD-07 09-May-23 16 ACC 15-May 3 3 19 11-Jul-2023 14-Jul-2023

169 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 159 4/5 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-02 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 33 11-Jul-2023 14-Jul-2023

170 PIPE LINE DT-BIG-PIPL2-23-III-09 0 16/23 160 5/5 S BW Pipe Pipe CS 40 6 08-May-2023 09-May-2023 WD-02 06-DT-WD-07 09-May-23 16 ACC 15-May 3 3 19 11-Jul-2023 14-Jul-2023

171 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 161 5/5 F BW Pipe Pipe CS 40 6 26-May-2023 27-May-2023 WD-02 06-DT-WD-07 27-May-23 22 ACC 1-Jun 3 3 34 11-Jul-2023 14-Jul-2023

172 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 162 1/4 S BW Pipe Pipe CS 40 6 08-May-2023 09-May-2023 WD-02 06-DT-WD-07 09-May-23 16 ACC 15-May 3 3 20 11-Jul-2023 14-Jul-2023

173 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 163 1/4 F BW Pipe Pipe CS 40 6 26-May-2023 27-May-2023 WD-01 06-DT-WD-07 27-May-23 22 ACC 1-Jun 3 3 34 11-Jul-2023 14-Jul-2023

174 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 164 2/4 S BW Pipe Pipe CS 40 6 09-May-2023 10-May-2023 WD-02 06-DT-WD-07 10-May-23 16 ACC 15-May 3 3 20 11-Jul-2023 14-Jul-2023

175 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 165 2/4 F BW Pipe Pipe CS 40 6 27-May-2023 29-May-2023 WD-01 06-DT-WD-07 29-May-23 22 ACC 1-Jun 3 3 34 11-Jul-2023 14-Jul-2023

176 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 166 3/4 S BW Pipe Pipe CS 40 6 09-May-2023 10-May-2023 WD-02 06-DT-WD-07 10-May-23 16 ACC 15-May 3 3 20 11-Jul-2023 14-Jul-2023

177 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 167 3/4 F BW Pipe Pipe CS 40 6 27-May-2023 29-May-2023 WD-01 06-DT-WD-07 29-May-23 22 ACC 1-Jun 3 3 34 11-Jul-2023 14-Jul-2023

178 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 168 4/4 S BW Pipe Pipe CS 40 6 09-May-2023 12-May-2023 WD-01 06-DT-WD-07 12-May-23 17 ACC 15-May 3 3 20 11-Jul-2023 14-Jul-2023

179 PIPE LINE DT-BIG-PIPL2-23-III-10 0 17/23 169 4/4 F BW Pipe Pipe CS 40 6 30-May-2023 30-May-2023 WD-01 06-DT-WD-07 30-May-23 23 ACC 1-Jun 3 3 34 11-Jul-2023 14-Jul-2023

180 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 170 1/5 S BW Pipe Pipe CS 40 6 09-May-2023 11-May-2023 WD-01 06-DT-WD-07 11-May-23 17 ACC 15-May 3 3 21 11-Jul-2023 14-Jul-2023

181 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 171 1/5 F BW Pipe Pipe CS 40 6 01-Jun-2023 01-Jun-2023 WD-02 06-DT-WD-07 01-Jun-23 24 ACC 10-Jun 3 3 38 11-Jul-2023 14-Jul-2023

182 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 172 2/5 S BW Pipe Pipe CS 40 6 09-May-2023 11-May-2023 WD-02 06-DT-WD-07 11-May-23 17 ACC 24-May 3 3 27 11-Jul-2023 14-Jul-2023

183 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 173 2/5 F BW Pipe Pipe CS 40 6 01-Jun-2023 01-Jun-2023 WD-02 06-DT-WD-07 01-Jun-23 24 ACC 10-Jun 3 3 38 11-Jul-2023 14-Jul-2023

184 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 174 3/5 S BW Pipe Pipe CS 40 6 18-May-2023 18-May-2023 WD-02 06-DT-WD-07 18-May-23 18 ACC 24-May 3 3 27 11-Jul-2023 14-Jul-2023

185 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 175 3/5 F BW Pipe Pipe CS 40 6 02-Jun-2023 09-Jun-2023 WD-02 06-DT-WD-07 09-Jun-23 25 ACC 10-Jun 3 3 38 11-Jul-2023 14-Jul-2023

186 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 176 4/5 S BW Pipe Pipe CS 40 6 18-May-2023 19-May-2023 WD-02 06-DT-WD-07 19-May-23 19 ACC 24-May 3 3 27 11-Jul-2023 14-Jul-2023

187 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 177 4/5 F BW Pipe Pipe CS 40 6 01-Jun-2023 02-Jun-2023 WD-02 06-DT-WD-07 02-Jun-23 24 ACC 10-Jun 3 3 38 11-Jul-2023 14-Jul-2023

188 PIPE LINE DT-BIG-PIPL2-23-III-11 0 18/23 178 5/5 S BW Pipe Pipe CS 40 6 18-May-2023 19-May-2023 WD-02 06-DT-WD-07 19-May-23 19 ACC 24-May 3 3 27 11-Jul-2023 14-Jul-2023

189 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 179 5/5 F BW Pipe Pipe CS 40 6 01-Jun-2023 02-Jun-2023 WD-02 06-DT-WD-07 02-Jun-23 24 ACC 10-Jun 3 3 37 11-Jul-2023 14-Jul-2023

190 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 180 1/4 S BW Pipe Pipe CS 40 6 18-May-2023 19-May-2023 WD-02 06-DT-WD-07 19-May-23 19 ACC 10-Jun 3 3 37 11-Jul-2023 14-Jul-2023

191 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 181 1/4 F BW Pipe Pipe CS 40 6 17-Jul-2023 17-Jul-2023 WD-02 06-DT-WD-07 17-Jul-23 29 ACC 17-Jul 2 1 25-Aug 1 4 49 / 49R 11-Jul-2023 14-Jul-2023

192 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 182 2/4 S BW Pipe Pipe CS 40 6 19-May-2023 22-May-2023 WD-02 06-DT-WD-07 23-May-23 20 ACC 24-May 3 3 28 11-Jul-2023 17-Jul-2023

193 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 183 2/4 F BW Pipe Pipe CS 40 6 01-Jun-2023 01-Jun-2023 WD-02 06-DT-WD-07 01-Jun-23 24 ACC 10-Jun 3 3 37 11-Jul-2023 17-Jul-2023

194 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 184 3/4 S BW Pipe Pipe CS 40 6 19-May-2023 22-May-2023 WD-02 06-DT-WD-07 23-May-23 20 ACC 24-May 3 3 28 11-Jul-2023 17-Jul-2023

195 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 185 3/4 F BW Pipe Pipe CS 40 6 02-Jun-2023 03-Jun-2023 WD-01 06-DT-WD-07 02-Jun-23 24 ACC 10-Jun 3 3 37 11-Jul-2023 17-Jul-2023

196 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 186 4/4 S BW Pipe Pipe CS 40 6 19-May-2023 22-May-2023 WD-01 06-DT-WD-07 23-May-23 24 ACC 10-Jun 3 3 37 11-Jul-2023 17-Jul-2023

197 PIPE LINE DT-BIG-PIPL2-23-III-12 0 19/23 187 4/4 F BW Pipe Pipe CS 40 6 19-Jul-2023 19-Jul-2023 WD-02 06-DT-WD-07 19-Jul-23 29 ACC 26-Jul 3 3 50 11-Jul-2023 17-Jul-2023

198 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 188 1/5 S BW Pipe Pipe CS 40 6 20-May-2023 22-May-2023 WD-02 06-DT-WD-07 23-May-23 20 ACC 24-May 3 3 29 11-Jul-2023 19-Jul-2023

199 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 189 1/5 F BW Pipe Pipe CS 40 6 06-Jun-2023 09-Jun-2023 WD-01 06-DT-WD-07 09-Jun-23 25 ACC 10-Jun 3 3 36 11-Jul-2023 19-Jul-2023

200 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 190 2/5 S BW Pipe Pipe CS 40 6 20-May-2023 22-May-2023 WD-02 06-DT-WD-07 23-May-23 20 ACC 24-May 3 3 29 11-Jul-2023 19-Jul-2023

201 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 191 2/5 F BW Pipe Pipe CS 40 6 06-Jun-2023 08-Jun-2023 WD-01 06-DT-WD-07 08-Jun-23 25 ACC 10-Jun 3 3 36 11-Jul-2023 19-Jul-2023

202 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 192 3/5 S BW Pipe Pipe CS 40 6 20-May-2023 22-May-2023 WD-02 06-DT-WD-07 23-May-23 20 ACC 24-May 3 3 29 11-Jul-2023 19-Jul-2023

203 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 193 3/5 F BW Pipe Pipe CS 40 6 10-Jun-2023 10-Jun-2023 WD-01 06-DT-WD-07 10-Jun-23 25 ACC 24-Jun 3 3 41 11-Jul-2023 19-Jul-2023

204 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 194 4/5 S BW Pipe Pipe CS 40 6 20-May-2023 22-May-2023 WD-02 06-DT-WD-07 23-May-23 20 ACC 24-May 3 3 29 11-Jul-2023 19-Jul-2023

205 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 195 4/5 F BW Pipe Pipe CS 40 6 08-Jun-2023 10-Jun-2023 WD-02 06-DT-WD-07 10-Jun-23 25 ACC 24-Jun 3 3 41 11-Jul-2023 19-Jul-2023

206 PIPE LINE DT-BIG-PIPL2-23-III-13 0 20/23 196 5/5 S BW Pipe Pipe CS 40 6 22-May-2023 23-May-2023 WD-02 06-DT-WD-07 23-May-23 21 ACC 24-May 3 3 29 11-Jul-2023 19-Jul-2023

207 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 197 5/5 F BW Pipe Pipe CS 40 6 09-Jun-2023 10-Jun-2023 WD-01 06-DT-WD-07 10-Jun-23 25 ACC 24-Jun 3 3 41 11-Jul-2023 19-Jul-2023

208 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 198 1/4 S BW Pipe Pipe CS 40 6 22-May-2023 23-May-2023 WD-01 06-DT-WD-07 23-May-23 21 ACC 24-May 3 3 30 11-Jul-2023 19-Jul-2023

10/6/2023 - 13:34 - Welding Traceability Report - Page : 4 of 5


WELDING TRACEABILITY RECORD
Document No : DUTA/P23-0022/WTR/2023

Revision No :0

CONNECT TO WELDER WELDING VISUAL NON DESTRUCTION EXAMINATION


LOWERING
JOINT SPOOL JOINT THICK SIZE STAMP WPS INSPECTION PENETRANT TEST RADIOGRAPHY TEST
NO TAG DWG NO. REV SHEET F/S MAT'L FIT UP WELD FILM REPORT REMARKS
NO. NO. TYPE MATERIAL 1 MATERIAL 2 (SCH) (Æ) No HOLIDAY TEST
DATE DATE REPORT DATE PT No. RESULT FILM R0 FILM R1 FILM R2 QTY NO
0 DATE RESULT DATE DATE DATE DATE
NO ACC REP ACC REP ACC REP

209 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 199 1/4 F BW Pipe Pipe CS 40 6 09-Jun-2023 10-Jun-2023 WD-02 06-DT-WD-07 10-Jun-23 25 ACC 24-Jun 3 3 42 11-Jul-2023 19-Jul-2023

210 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 200 2/4 S BW Pipe Pipe CS 40 6 22-May-2023 23-May-2023 WD-01 06-DT-WD-07 23-May-23 21 ACC 24-May 3 3 30 11-Jul-2023 19-Jul-2023

211 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 201 2/4 F BW Pipe Pipe CS 40 6 09-Jun-2023 13-Jun-2023 WD-02 06-DT-WD-07 13-Jun-23 25 ACC 24-Jun 3 3 42 11-Jul-2023 19-Jul-2023

212 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 202 3/4 S BW Pipe Pipe CS 40 6 22-May-2023 23-May-2023 WD-01 06-DT-WD-07 23-May-23 21 ACC 24-May 3 3 30 11-Jul-2023 19-Jul-2023

213 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 203 3/4 F BW Pipe Pipe CS 40 6 20-Jul-2023 20-Jul-2023 WD-02 06-DT-WD-07 20-Jul-23 29 ACC 26-Jul 3 3 50 11-Jul-2023 19-Jul-2023

214 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 204 4/4 F BW Pipe Pipe CS 40 6 01-Jul-2023 04-Jul-2023 WD-02 06-DT-WD-07 04-Jul-23 27 ACC 8-Jul 2 1 12-Jul 1 4 45/45R 11-Jul-2023 20-Jul-2023

215 PIPE LINE DT-BIG-PIPL2-23-III-14 0 21/23 205 4/4 F BW Pipe Pipe CS 40 6 01-Jul-2023 06-Jul-2023 WD-02 06-DT-WD-07 06-Jul-23 27 ACC 8-Jul 3 3 45 11-Jul-2023 20-Jul-2023

216 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 206 1/5 F BW Pipe Pipe CS 40 6 06-Jul-2023 06-Jul-2023 WD-02 06-DT-WD-07 06-Jul-23 27 ACC 8-Jul 3 3 45 11-Jul-2023 20-Jul-2023

217 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 207 1/5 F BW Pipe Pipe CS 40 6 10-Jul-2023 10-Jul-2023 WD-02 06-DT-WD-07 10-Jul-23 28 ACC 12-Jul 3 3 47 11-Jul-2023 20-Jul-2023

218 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 208 2/5 F BW Pipe Pipe CS 40 6 10-Jul-2023 10-Jul-2023 WD-02 06-DT-WD-07 10-Jul-23 28 ACC 26-Jul 3 3 50 11-Jul-2023 21-Jul-2023

219 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 209 2/5 F BW Pipe Pipe CS 40 6 06-Jul-2023 10-Jul-2023 WD-02 06-DT-WD-07 10-Jul-23 28 ACC 12-Jul 3 3 47 11-Jul-2023 21-Jul-2023

220 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 210 2/5 F BW Pipe Pipe CS 40 6 06-Jul-2023 11-Jul-2023 WD-02 06-DT-WD-07 11-Jul-23 28 ACC 12-Jul 3 3 47 11-Jul-2023 21-Jul-2023

221 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 211 3/5 F BW Pipe Pipe CS 40 6 07-Jul-2023 11-Jul-2023 WD-02 06-DT-WD-07 11-Jul-23 28 ACC 17-Jul 3 3 48 11-Jul-2023 21-Jul-2023

222 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 212 4/5 F BW Pipe Pipe CS 40 6 10-Jul-2023 11-Jul-2023 WD-02 06-DT-WD-07 11-Jul-23 28 ACC 12-Jul 3 3 47 11-Jul-2023 21-Jul-2023

223 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 213 4/5 F BW Pipe Pipe CS 40 6 10-Jul-2023 13-Jul-2023 WD-02 06-DT-WD-07 13-Jul-23 28 ACC 17-Jul 3 3 48 11-Jul-2023 21-Jul-2023

224 PIPE LINE DT-BIG-PIPL2-23-III-15 0 22/23 214 5/5 F BW Pipe Pipe CS 40 6 10-Jul-2023 13-Jul-2023 WD-02 06-DT-WD-07 13-Jul-23 28 ACC 17-Jul 3 3 48 11-Jul-2023 21-Jul-2023

225 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 218 2/5 F BW Pipe Pipe CS 40 6 12-Jul-2023 13-Jul-2023 WD-02 06-DT-WD-07 13-Jul-23 28 ACC 17-Jul 3 3 48 11-Jul-2023 21-Jul-2023

226 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 218A 2/5 F BW Pipe Equal Tee CS 40 6 01-Aug-2023 01-Aug-2023 WD-02 06-DT-WD-07 01-Aug-23 28 ACC 5-Aug 3 3 53 N/A 21-Jul-2023

227 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 219 1/5 F BW Equal Tee Equal Tee CS 40 6 09-Aug-2023 14-Aug-2023 WD-02 06-DT-WD-07 14-Aug-23 30 ACC 21-Aug 3 3 56 N/A 21-Jul-2023

228 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 220 2/5 S BW Equal Tee Flange WN CS 40 6 09-Aug-2023 19-Aug-2023 WD-02 06-DT-WD-07 19-Aug-23 31 ACC 21-Aug 3 3 56 N/A 21-Jul-2023

229 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 221 4/5 F BW Flange WN Pipe CS 40 6 02-Aug-2023 04-Aug-2023 WD-02 06-DT-WD-07 04-Aug-23 30 ACC 5-Aug 3 3 53 N/A 21-Jul-2023

230 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 222 2/5 S BW Equal Tee Flange WN CS 40 3 02-May-2023 05-May-2023 WD-02 06-DT-WD-07 05-May-23 13 ACC 9-May 3 3 18 N/A 21-Jul-2023

231 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 223 4/5 F BW Pipe Pipe CS 40 6 02-Aug-2023 02-Aug-2023 WD-02 06-DT-WD-07 02-Aug-23 30 ACC 5-Aug 3 3 53 11-Jul-2023 21-Jul-2023

232 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 224 4/5 F BW Pipe Elbow 90 CS 40 6 02-Aug-2023 02-Aug-2023 WD-02 06-DT-WD-07 02-Aug-23 30 ACC 24-May 3 3 30 11-Jul-2023 21-Jul-2023

233 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 225 4/5 F BW Elbow 90 Pipe CS 40 6 02-Aug-2023 02-Aug-2023 WD-02 06-DT-WD-07 02-Aug-23 30 ACC 5-Aug 3 3 53 11-Jul-2023 21-Jul-2023

234 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 226 4/5 S BW Pipe Elbow 90 CS 40 6 23-Sep-2023 23-Sep-2023 WD-01 06-DT-WD-07 23-Sep-23 37 ACC 24-Sep 3 3 66 N/A 21-Jul-2023

235 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 227 5/5 F BW Elbow 90 Pipe CS 40 6 22-Aug-23 22-Aug-23 WD-02 06-DT-WD-07 22-Aug-23 31 ACC 28-Aug 3 3 57 N/A 21-Jul-2023

236 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 228 5/5 S BW Pipe Elbow 90 CS 40 6 02-Aug-23 02-Aug-23 WD-02 06-DT-WD-07 02-Aug-23 16 ACC 19-Aug 2 1 21-Aug 1 4 54/54R N/A 21-Jul-2023

237 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 229 5/5 S BW Elbow 90 Con. Red 6x3 CS 40 6 09-May-2023 10-May-2023 WD-01 06-DT-WD-07 10-May-23 16 ACC 15-May 2 1 21-Aug 1 4 54/54R N/A 21-Jul-2023

238 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 230 3/5 F BW Pipe Flange WN CS 40 6 09-Aug-2023 09-Aug-2023 WD-02 06-DT-WD-07 09-Aug-23 30 ACC 21-Aug 3 3 56 N/A 21-Jul-2023

239 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 231 3/5 F SW Pipe Cap CS 40 6 09-Aug-2023 09-Aug-2023 WD-02 06-DT-WD-07 09-Aug-23 30 ACC n/a n/a N/A 21-Jul-2023

240 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 232 3/5 F BW Equal Tee Flange WN CS 40 6 09-Aug-2023 09-Aug-2023 WD-02 06-DT-WD-07 09-Aug-23 30 ACC 21-Aug 3 3 56 N/A 21-Jul-2023

241 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 233 3/5 F BW Flange WN Pipe CS 40 6 09-Aug-2023 09-Aug-2023 WD-02 06-DT-WD-07 09-Aug-23 30 ACC 21-Aug 3 3 56 N/A 21-Jul-2023

242 PIPE LINE DT-BIG-PIPL4-23-III-01 0 23/23 234 3/5 F SW Pipe Cap CS 40 6 09-Aug-2023 09-Aug-2023 WD-02 06-DT-WD-07 09-Aug-23 30 ACC n/a n/a N/A 21-Jul-2023

242 1407.5 714

Prepared by Checked by Checked By, Approved by,


PT. DUTA UTAMA TEKNIK ABADI PT.DUTA UTAMA TEKNIK ABADI PT. BANTEN INTI GASINDO PT. BANTEN INTI GASINDO

MUHAMAD THORIK SUWARNO Hermanto


_________________________________ Moh. Fuad Fachrudin Nur
_________________________________
ADMIN & REPORT QC

LEGEND: WELDER LIST


S : SHOP (WORKSHOP) WD-01 : SOBRI
F : FIELD (SITE) WD-02 : DEDDY ROMDONI
BW : BUTT WELD
FW : FILLET WELD