Download as pdf or txt
Download as pdf or txt
You are on page 1of 28

ABOUT

HIMALAYA
GROUP
COMPANY PROFILE
• Name: PT Himalaya Everest Jaya

• Established: 1981

• Head Office: Jl. Daan Mogot Km.10 No. 151


Pesing Poglar Jakarta Barat (11710)

• Employees: 420 (per 28 Feb 2015)

• President Director: Ang Anton Asmadi

• Sales branch offices: 20


CHIEF
EXECUTIVE
OFFICER

Ang Anton Asmadi


President Director
of Himalaya Group
HIMALAYA GROUP
PT. HIMALAYA EVEREST JAYA (HEJ)
Business Line: Electrical/ Mechanical Power Transmission,
Factory Automation, Welding, Cutting, Pumps, Conveyor
Roller, Plastic

PT. HIMALAYA TRANSMEKA (HTM)


Business Line: Manufacturer of : Electrical Switch Boards,
Motor Control Centre

PT. HIMALAYA NABEYA INDONESIA (HNI)


Business Line: NBK Standard V-Pulley, Flexible Shaft
Coupling, Tetra Parting Agent
Milestone
2012
Establishment
of new ERP
system
(Acumatica)

1981 1997
2005 2008
Himalaya group Main Office
As an Established
established. moved to the
authorished an
As an importer and present
transformer Engineering
distributor for office
service Procurement
industrial products building (Jl.
workshop for Construction
Pesing 2001 TMEIC in (EPC)
poglar km10 Signature South East company
no 151). Service Asia
Team
1986 1998 established
Himalaya Himalaya with Toshiba
Transmeka Nabeya
(HTM) was Indonesia
established. (HNI)
was
established.
BRANCHES 22

21
1 23

2 18

3 5
4
17
6 9
8
10 19
7 16
13
20
12 11
14 15

1. Medan 6. Palembang 11. Bandung 16. Solo New Branch


2. Pekanbaru 7. Lampung 12. Cilegon 17. Banjarmasin “Karawang”
3. Padang 8. Tangerang 13. Surabaya 18. Samarinda 21. Kuala Lumpur
4. Jambi 9. DKI Jakarta 14. Semarang 19. Makasar 22. Sabah
5. Bangka 10. Cikarang 15. Sidoarjo 20. Cikarang 23. Sarawak
ORGANIZATION STRUCTURES
Presdir

BOD

Sekretaris

VP Sales VP Mkt BD VP SPM EPC SS EDP Finance Accounting GA HRD


Engineer

BM MM Industrial
Head Engineer
Sales PH

PS
VISION & MISSION
Vision
To be the leading engineering & trading
company, providing
“Total Industrial Solutions”
with the highest standard in quality and
customer satisfaction.

Mission 1. expanding our network with quality


consistency
2. provide best products and services,
effective, efficient and on time
delivery
3. giving value-added solutions that will
optimize customer satisfaction
COMPANY VALUES
1. Integrity.
We enforce the highest ethical and moral standards, demonstrating honesty
and fairness in all activities.

2. Continuous Development.
We are committed to continuously developing our companies and
employees.

3. Excellence.
We continuously strive to achieve the highest standard of result.

4. Proactive.
We pursue and adopt new technologies and skills to improve our business
quality

5. Teamwork.
We promote and support a multicultural workforce based on trust, respect,
professional and mutual relationship in all of our departments.
TRADING
ENGINEERING
SIGNATURE SERVICE
EPC
(Engineering, Procurement,
Construction)
EPC DIVISION
Engineering,
Procurement,
Construction
MATERIAL HANDLING –
CSU & STACKER
CASE STUDY
• Client: PT. Cement Tonasa
• Project: Coal Unloading
System Package 1
• Scope:
– E+P of 1200t/h Continious Ship
Unloader and STacker
– Engineering only Jetty Conveyor
• Material: Coal
• Cap: 1200t/h
• Completion: July 2013
(scheduled)
HIMALAYA
TRANSMEKA
PT. Himalaya Transmeka
1. LOW VOLTAGE SWITCHGEAR
Metal Enclosed Switchgear up to 600V, 6300A, 70 kA,
(1 Sec)‫‏‬
Capacity / Month : 80 Units
Assembling Section Panel Testing

Assembling Assembling
Line Line
HIMALAYA
NABEYA
INDONESIA
PT. Himalaya Nabeya Indonesia (Joint Venture)
STANDARD FACILITIES

Cuti BPJS Kesehatan & Payroll


Didapatkan Ketenagakerjaan Dibagikan
setelah Didapatkan setiap akhir
masa kerja 1 setelah masa bulan
tahun kerja 3 bulan
DRESS CODE & OFFICE HOUR
• Monday - Thursday = Formal
• Friday = Semi Formal

• Office Hours :
Monday - Friday 08.00 - 17.00

• Break Time 60 Minutes

• Fingerprint Attendance
Customer
Salesman Staff SPM
Sudah di Ya
Register MM Cek Database
ManMark?

Tidak Staff SPM


Staff SPM Informasikan ke
Input data register salesman jika
MM yg sudah dia
aproval kabag, VP
Work flow customer sudah di
ManMark / register
MKT, VP Cabang Salesman
Appointment Presentasi /
SPM ManMark
Customer kunjungan

Follow up Inquiry Quotation PO

Invoice DO SO P4
PRINCIPLE
A-Z

MARKETING
Product Head Signature EPC Engineering HTM HNI
A-Z Service

CREATED
NEW ENQUIRY
SALESMAN

CUSTOMER ENQUIRY CUSTOMER


CUSTOMER PROBLEM
PROBLEM
Greetings
T : Kabar Baik Himalaya ?
P : Luar Biasa !
T : Siap untuk Breakthrought ?
P : Breakthrough (4x)
T : Kapan ?
P : Sekarang !

You might also like