NTPC Limited
(A Government of India Enterprise)
PROJECT
GE COMPANY, USA
DOC NO DOC NO
TITLE
3.7kW DK2 4 1
7.5kW DK2 3 1
11kW DK2 1 1
15kW DK2
18.5kW DK2 9 2
22kW DK2 4 1
30kW DK21 14 3
37kW DK21 6 2
55kW DK21 4 1
75kW DK21 1 1
90kW DK21 1 1
16A E 6 2
32A E 20 4
63A E/SFU+C 20 6
100A MCCB 4 1
160A MCCB 7 2
250A MCCB 2 1
Rating Type Working Spare
1.5kW DK2 4 1
2.2kW DK2 3 1
3.7kW DK2 9 2
5.5kW DK2 2 1
7.5kW DK2 25 7
11kW DK2 11 4
15kW DK2 10 2
18.5kW DK2 2 1
22kW DK2
30kW DK21 6 2
45kW DK21 4 1
16A E 29 7
32A E 19 4
63A E 19 5
100A MCCB 5 1
160A MCCB 8 2
250A MCCB 1 1
185kW/14
DM 4 1
5kW
160kW DM RDOL 2 1
2*0.8kW DK2 2 1
Rating Type Working Spare
2.2kW DK2 1 1
30kW DK21 4 1
55kW DK21 2 1
32A E 4 2
63A E 4 2
100A MCCB 3 1
Rating Type Working Spare
2.2kW DK2 1 1
30kW DK21 10 2
55kW DK21 2 1
32A E 4 2
63A E 3 2
100A MCCB 2 1
Rating Type Working Spare
1.5kW DK2 2 1
7.5kW DK2 2 1
63A E 3 2
100A MCCB 3 1
TANDA THERMAL POWER STATION ST-II (2X660 MW)
Flue Gas Desulphurization System
EEP-000091 NTPC REF. NO: 32249 DATE: 16-Apr-2020
Rev-01
DOC/DWG TITLE: GA & SLD FOR 415V SWITCHGEAR
DOC/DWG NO NTPC: 9562-109-PVE-P-004
DOC/DWG NO GE: EEP000091/3176015/EL/ARR/0001
STATUS: CAT II
Component selection for switchgears panel has been done in line with Noted.
2
technical specification sub section for LT switchgear. Except for 13KW to 22KW FNX100 SFU is provided as this is suitable for motor duty
In the excel sheet attached for load list, pls indicate the type of feeder
3 Excel is removed, feeder type is indicated in the board feeder details.
(NTPC designation) against each item.
indicate total number of modules of each type and total number of
spares of each type. these shall be atleast 20% for each type of feeder.
4 Noted and updated.
It has been observed that number of spare feeders provided are lesser
than required for each type of feeder.
rating of loads and indicated cable size to be checked by EPC
5 Noted.
contractor in line with cable sizing document
Confirm that all LT cable sizes indicated here are from selected LT
6 Confirmed.
cable sizes coverd in LT cable datasheet document
number of feeders not matching with approved single line diagram In drawing 9562-109-PVE-B-019-03 the number of feeders shown is indicative only,
7
9562-109-PVE-B-019-03 exact count is as per this drawing.
8 o/G breaker feeder spare?? The number of spare is provided as per ammendment 3 point 84
TANDA THERMAL POWER STATION ST-II (2X660 MW)
Flue Gas Desulphurization System
EEP-000091 NTPC REF. NO: CC:109:31761 DATE: 19/12/2019
Rev-00
DOC/DWG TITLE: GA & SLD FOR 415V SWITCHGEAR
DOC/DWG NO NTPC: 9562-109-PVE-P-004
DOC/DWG NO GE: EEP000091/3176015/EL/ARR/0001
STATUS: CAT III
Please provide the excel sheet of load list for review of this document.
1 Attached in revised drawing.
Please attach excel file for feeder details, feeder no, section, no. of
3 spares of each type & rating provided on each section etc with this Attached in revised drawing.
document
4 Proposal for prototype inspection to be sent in the email… Sent via mail dated 02.03.2020
Please note that, module locations has been provided w.r.t. requirement of cable sizes
and space availlability within MCC Section.
5 kindly avoid the the placement of higher size module at the top.
Kindly accept the same.