* Apt. Main Doors (D05A & D05B) (65 DOORS) 15-08-2023 20-08-2023 as per site readyness
* Laundry Room (D06A&B, ) (50 DOORS) 15-08-2023 20-08-2023 as per site readyness
* ELE. ROOV, STAIR , corridor, (D 24 D23 , D07) (40 DOORS) 15-08-2023 20-08-2023 as per site readyness
NFR Painted Doors FIRST FLOOR TO 5 TH FIFTH FLOOR (395 DOORS) Balance:-
2nd floor - door hanging and
* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 20-09-2023 25-09-2023 3rd floor
as -per
except of mock up
site readyness
SIXTH FLOOR TO 9 TH FLOOR FR DOORS GF floor- door hanging ,
Veneer door no delivery
* Apt. Main Doors (D05A & D05B) (36 DOORS) 25-08-2023 30-08-2023 as per site readyness
9th floor- non of FR
* Laundry Room (D06A&B, ) (28 DOORS) 25-08-2023 30-08-2023 as per site readyness
door fixed
* ELE. ROOV, STAIR , corridor, (D 24 D23 , D07) (38 DOORS) 26-08-2023 30-08-2023 as per site readyness
* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 30-09-2023 05-10-2023 as per site readyness
* Apt. Main Doors (D05A & D05B) 4 DOORS 25-08-2023 30-08-2023 not fixed
as per site readyness
NFR Painted Doors FF Total - 22 Nos
* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 15-09-2023 20-09-2023 as per site readyness
SI Floor Door No location Total Qty. Frames delivered Frames Installed Doors delivered Doors Installed
1 2 2 2
D05 Main Door 2 2
2 1 1 1 0
Ground Floor D23 Stair door 1 There is no door at ST
3 0 0 0 0
D01 Lift Lobby 1
8 D07 Corridor 2 2 2 2 2
15 D07 Corridor 2 2 2 2 2
15 D07 Corridor 2 2 2 2 2
15 D07 Corridor 2 2 2 2 2
15 D07 Corridor 2 2 2 2 2
15 D07 Corridor 2 2 2 2 2
22 D07 Corridor 1 1 0 1 0
9th Floor
28 D23 Stair door 2 0 0 1 0
29 D07 Corridor 2 0 0 0 0
9th Floor
30 D01 Lift Lobby 1 1 0 0 0
31 D19 gym 1 0 0 0 0
33 D17 Launch 1 0 0 0 0
35 267
SI Floor location Total Qty. Frames delivered Frames Installed Doors delivered Doors Installed
1
2
Ground Floor
4 FLAT-1 8 6 6 6 6
5 FLAT-2 7 7 7 7 7
6 FLAT-3 7 7 7 7 7
7 FLAT-4 7 7 7 7 7
8 FLAT-5 7 7 7 7 7
9 FLAT-6 7 6 5 5 5
FLAT-8 5 5 5 5 5
FLAT-9 7 7 7 7 7
FLAT-10 3 3 3 3 3
FLAT-11 3 3 3 3 3
FLAT-12 5 5 5 5 5
10 FLAT-13 7 7 7 7 7
11 FLAT-1 8 7 7 0 0
FLAT-2 7 7 7 0 0
12 FLAT-3 7 7 7 0 0
13 FLAT-4 7 7 7 0 0
14 FLAT-5 7 7 7 0 0
FLAT-6 7 7 7 0 0
FLAT-8 3 3 3 0 0
FLAT-9 10 10 10 0 0
FLAT-10 3 3 3 0 0
FLAT-11 3 3 3 0 0
15 FLAT-12 5 5 5 0 0
16 FLAT-13 7 7 7 0 0
11 FLAT-1 8 8 8 8 8
12 FLAT-2 7 7 7 7 7
13 FLAT-3 7 7 0 0 0
FLAT-4 7 7 0 0 0
FLAT-5 7 7 0 0 0
FLAT-6 7 7 0 0 0
14 FLAT-8 3 3 0 0 0
FLAT-9 10 10 0 0 0
FLAT-10 3 3 0 0 0
FLAT-11 3 3 0 0 0
15 FLAT-12 5 6 0 0 0
16 FLAT-13 7 7 7 7 7
11 FLAT-1 8 6 6 6 6
12 FLAT-2 7 7 7 7 7
13 FLAT-3 7 7 7 7 7
FLAT-4 7 7 7 7 7
FLAT-5 7 7 7 7 7
FLAT-6 7 7 7 7 7
FLAT-8 3 3 3 3 3
FLAT-9 10 10 10 10 10
FLAT-10 5 5 5 5 5
14 FLAT-11 3 3 3 3 3
15 FLAT-12 5 5 5 5 5
16 FLAT-13 6 6 6 6 6
11 FLAT-1 8 6 6 6 6
12 FLAT-2 7 7 7 7 7
FLAT-3 7 7 7 7 7
FLAT-4 7 7 7 7 7
FLAT-5 7 7 7 7 7
13 FLAT-6 7 7 7 7 7
FLAT-9 10 10 10 10 10
FLAT-10 5 5 5 5 5
15 FLAT-11 3 3 3 2 3
FLAT-12 5 5 5 5 5
16 FLAT-13 6 6 6 6 6
11 FLAT-1 8 6 6 6 6
FLAT-2 7 7 7 5 7
FLAT-3 7 7 7 7 7
FLAT-4 7 7 7 7 7
FLAT-5 7 7 7 7 7
FLAT-6 7 7 7 7 7
FLAT-8 3 3 3 3 3
FLAT-9 10 10 10 10 10
12 FLAT-10 5 5 5 5 5
13 FLAT-11 3 3 3 3 3
14 FLAT-12 5 5 5 5 5
15 FLAT-13 6 6 6 6 6
11 FLAT-1 8 6 6 6 6
FLAT-2 7 7 7 7 7
FLAT-3 7 7 7 7 7
FLAT-4 7 7 7 7 7
FLAT-5 7 7 7 7 7
FLAT-6 7 7 7 7 7
FLAT-8 3 3 3 3 3
FLAT-9 10 10 10 10 10
12 FLAT-10 5 5 5 5 5
13 FLAT-11 3 3 3 3 3
14 FLAT-12 5 5 5 5 5
15 FLAT-13 6 6 0 6 0
18 FLAT-1 7 2 0 4 0
FLAT-2 7 2 0 3 0
FLAT-3 7 3 0 5 0
FLAT-4 7 1 0 3 0
FLAT-5 3 3 0 3 0
8th Floor
FLAT-6 3 1 0 3 0
FLAT-7 10 2 0 7 0
FLAT-8 5 2 0 2 0
FLAT-9 3 0 0 3 0
19 FLAT-10 6 2 0 5 0
25
26
27
28
29
30
9th Floor
31
32
33
35 603
Summary
SI Total Qty. Qty Delivered Qty Installed Remaining qty to deliver
602 395
440 162
1
2
3
4
5
6