WOOD WORK PROGRAMME SCHEDULE Date:07-08-2023

Project : 10 Storey residential development, Dilmunia.


Consultant : M/s MSCEB
Main Contractor : M/s Kazerooni Contractor
Sub Contractor : M/s Sunday International
Subject : Wood Works work schedule
Item Description Start Date End Date Remarks
Wooden Doors
WOODEN DOOR DELIVERY & FIXING
Note: sample ironmongery for each type of doors in GF to 9th floor ie. Each type 1 nos shoud provided to us by 01-07-2023 (to cut the provisions for
ironmongey on doors before polishing)
FIRST FLOOR TO 5th FLOOR FR DOORS

* Apt. Main Doors (D05A & D05B) (65 DOORS) 15-08-2023 20-08-2023 as per site readyness
* Laundry Room (D06A&B, ) (50 DOORS) 15-08-2023 20-08-2023 as per site readyness
* ELE. ROOV, STAIR , corridor, (D 24 D23 , D07) (40 DOORS) 15-08-2023 20-08-2023 as per site readyness

NFR Painted Doors FIRST FLOOR TO 5 TH FIFTH FLOOR (395 DOORS) Balance:-
2nd floor - door hanging and
* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 20-09-2023 25-09-2023 3rd floor
as -per
except of mock up
site readyness
SIXTH FLOOR TO 9 TH FLOOR FR DOORS GF floor- door hanging ,
Veneer door no delivery
* Apt. Main Doors (D05A & D05B) (36 DOORS) 25-08-2023 30-08-2023 as per site readyness
9th floor- non of FR
* Laundry Room (D06A&B, ) (28 DOORS) 25-08-2023 30-08-2023 as per site readyness
door fixed
* ELE. ROOV, STAIR , corridor, (D 24 D23 , D07) (38 DOORS) 26-08-2023 30-08-2023 as per site readyness

NFR Painted Doors FF Total - 245 Nos

* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 30-09-2023 05-10-2023 as per site readyness

GF & BASEMENT DOORS FR DOORS

* Apt. Main Doors (D05A & D05B) 4 DOORS 25-08-2023 30-08-2023 not fixed
as per site readyness
NFR Painted Doors FF Total - 22 Nos

* Bed Room & bathroom Doors D09,D06,D12,D13,,d11) 15-09-2023 20-09-2023 as per site readyness

LIFT LOBBY DOORS (1ST - 9TH FLOOR AND GF , BASEMENT


not fixed
LIFT LOBBY DOOR D01 - FR 15 DOORS) 05-09-2023 15-09-2023 as per site readyness
except of Mock up, no cabinet
fixed

Site is ready with vanity for-


GF, 2ND, 3RD, 4TH floor

DB unit only one number fixed


in 302
MIX 6 DILMUNIA JOINERY WORK SITE PROGRESS (FR) 8-10-2023

SI Floor Door No location Total Qty. Frames delivered Frames Installed Doors delivered Doors Installed
1 2 2 2
D05 Main Door 2 2

2 1 1 1 0
Ground Floor D23 Stair door 1 There is no door at ST
3 0 0 0 0
D01 Lift Lobby 1

4 D05 Main Door 13 13 13 13 13

5 D24 Garbage Room 2 2 2 2 2

6 D24 Electical room 2 2 2 2 2

7 First Floor D23 Stair door 2 2 2 2 2

8 D07 Corridor 2 2 2 2 2

9 D01 Lift Lobby 1 1 0 0 0

10 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 2ND FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 3RD FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 1 1 1

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 4TH FLOOR D23 Stair door 2 2 2 2 2


4TH FLOOR
15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 2

14 5TH FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 13 13 13

12 D24 Garbage Room 2 2 2 2 2

13 D24 Electical room 2 2 2 2 1

14 6TH FLOOR D23 Stair door 2 2 2 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 10 10 10 10

11 D05 Main Door 13 13 12 13 12

12 D24 Garbage Room 2 2 0 2 2

13 D24 Electical room 2 2 0 2 0

14 7TH FLOOR D23 Stair door 2 2 0 2 2

15 D07 Corridor 2 2 2 2 2

16 D01 Lift Lobby 1 1 0 0 0

17 D06A laundry Room 10 8 0 10 8

18 D05 Main Door 10 10 9 10 9

19 D24 Garbage Room 2 2 2 2 2

20 D24 Electical room 2 2 2 2 2

21 8th Floor D23 Stair door 2 2 2 2 2

22 D07 Corridor 1 1 0 1 0

23 D01 Lift Lobby 1 1 0 0 0

24 D06A laundry Room 8 7 0 8 7

25 D05 Main Door 0 0 0 0 0

26 D24 Garbage Room 2 0 0 0 0

27 D24 Electical room 2 0 0 2 0

9th Floor
28 D23 Stair door 2 0 0 1 0

29 D07 Corridor 2 0 0 0 0
9th Floor
30 D01 Lift Lobby 1 1 0 0 0

31 D19 gym 1 0 0 0 0

32 D16 Game room 1 0 0 0 0

33 D17 Launch 1 0 0 0 0

34 D7B Store room 1 0 0 0 0

35 267

Summary (Except 9th floor)


SI Door No. Total Qty Qty Delivered Qty Installed remaining qty to deliver
D05 Main Door 101
103 103 0
D07 Corridor
16 15 13 1
D24 Garbage Room
36 34 29 2
D23 Stair door
19 18 14 1
1 D06A laundry Room
2 78 78 68 0
3 D01 Lift Lobby
10 10 1 1
4
5 D25
2 0 0 2
6
7 D19 gym
1 0 0 1
D17 Launch
1 0 0 1
D16 Game room
1 0 0 1

Total 267 249 226 18


MIX 6 DILMUNIA JOINERY WORK SITE PROGRESS (NFR) 08-10-2023

SI Floor location Total Qty. Frames delivered Frames Installed Doors delivered Doors Installed
1

2
Ground Floor

4 FLAT-1 8 6 6 6 6

5 FLAT-2 7 7 7 7 7

6 FLAT-3 7 7 7 7 7

7 FLAT-4 7 7 7 7 7

8 FLAT-5 7 7 7 7 7

9 FLAT-6 7 6 5 5 5

First Floor FLAT-7 6 6 6 6 6

FLAT-8 5 5 5 5 5

FLAT-9 7 7 7 7 7

FLAT-10 3 3 3 3 3

FLAT-11 3 3 3 3 3

FLAT-12 5 5 5 5 5

10 FLAT-13 7 7 7 7 7

11 FLAT-1 8 7 7 0 0

FLAT-2 7 7 7 0 0

12 FLAT-3 7 7 7 0 0

13 FLAT-4 7 7 7 0 0

14 FLAT-5 7 7 7 0 0

FLAT-6 7 7 7 0 0

2ND FLOOR FLAT-7 3 2 2 0 0

FLAT-8 3 3 3 0 0

FLAT-9 10 10 10 0 0

FLAT-10 3 3 3 0 0

FLAT-11 3 3 3 0 0

15 FLAT-12 5 5 5 0 0
16 FLAT-13 7 7 7 0 0

11 FLAT-1 8 8 8 8 8

12 FLAT-2 7 7 7 7 7

13 FLAT-3 7 7 0 0 0

FLAT-4 7 7 0 0 0

FLAT-5 7 7 0 0 0

FLAT-6 7 7 0 0 0

3RD FLOOR FLAT-7 3 3 0 0 0

14 FLAT-8 3 3 0 0 0

FLAT-9 10 10 0 0 0

FLAT-10 3 3 0 0 0

FLAT-11 3 3 0 0 0

15 FLAT-12 5 6 0 0 0

16 FLAT-13 7 7 7 7 7

11 FLAT-1 8 6 6 6 6

12 FLAT-2 7 7 7 7 7

13 FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

FLAT-6 7 7 7 7 7

4TH FLOOR FLAT-7 3 3 3 3 3

FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

FLAT-10 5 5 5 5 5

14 FLAT-11 3 3 3 3 3

15 FLAT-12 5 5 5 5 5

16 FLAT-13 6 6 6 6 6

11 FLAT-1 8 6 6 6 6

12 FLAT-2 7 7 7 7 7

FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

13 FLAT-6 7 7 7 7 7

14 5TH FLOOR FLAT-7 3 3 3 3 3


5TH FLOOR
FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

FLAT-10 5 5 5 5 5

15 FLAT-11 3 3 3 2 3

FLAT-12 5 5 5 5 5

16 FLAT-13 6 6 6 6 6

11 FLAT-1 8 6 6 6 6

FLAT-2 7 7 7 5 7

FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

FLAT-6 7 7 7 7 7

6TH FLOOR FLAT-7 3 3 3 3 3

FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

12 FLAT-10 5 5 5 5 5

13 FLAT-11 3 3 3 3 3

14 FLAT-12 5 5 5 5 5

15 FLAT-13 6 6 6 6 6

11 FLAT-1 8 6 6 6 6

FLAT-2 7 7 7 7 7

FLAT-3 7 7 7 7 7

FLAT-4 7 7 7 7 7

FLAT-5 7 7 7 7 7

FLAT-6 7 7 7 7 7

7TH FLOOR FLAT-7 3 3 3 3 3

FLAT-8 3 3 3 3 3

FLAT-9 10 10 10 10 10

12 FLAT-10 5 5 5 5 5

13 FLAT-11 3 3 3 3 3

14 FLAT-12 5 5 5 5 5

15 FLAT-13 6 6 0 6 0

18 FLAT-1 7 2 0 4 0

FLAT-2 7 2 0 3 0
FLAT-3 7 3 0 5 0

FLAT-4 7 1 0 3 0

FLAT-5 3 3 0 3 0
8th Floor
FLAT-6 3 1 0 3 0

FLAT-7 10 2 0 7 0

FLAT-8 5 2 0 2 0

FLAT-9 3 0 0 3 0

19 FLAT-10 6 2 0 5 0

25

26

27

28

29

30

9th Floor

31

32

33

35 603

Summary
SI Total Qty. Qty Delivered Qty Installed Remaining qty to deliver
602 395
440 162

1
2
3
4
5
6
7