Professional Documents
Culture Documents
02-03-2023-Bvtc Phuc Son II - Parking - PT - Cor7
02-03-2023-Bvtc Phuc Son II - Parking - PT - Cor7
02-03-2023-Bvtc Phuc Son II - Parking - PT - Cor7
Design manager
CHANGE ORDER REQUEST LIST
From 3 FCV
Change Order
Item No. Description Requested by Date
1 S 01 COR 1 "Change due to architectural requirement" By architectural department 2-Mar-2023
date date
QF-設セ-設計07(2017.04.01)
Check
Design manager
Cover sheet for revised drawings No. S 01
Change Order
Item No. Description Reference drawing Original
(Before the change)
1 Change due to architechtural requirment 14-S-PT-03_R1 14-S-PT-03_R0
14-S-PT-03A_R1
14-S-PT-04_R1 14-S-PT-04_R0
14-S-PT-04A_R1
14-S-PT-05_R1 14-S-PT-05_R0
14-S-PT-05A_R1
14-S-PT-06_R1 14-S-PT-06_R0
14-S-PT-06A_R1 14-S-PT-06A_R0
date date
Fujita Corporation
Vietnam
Project
Phuc Son II PJ
Project No.
Manager
of Implementation Unit
Aoki Masashi
Seto Yohei
Drawing
Vu Dinh Phien
Note
【 OR CONSTRUCTION】
Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale
Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title
Số hiệu
Drawing No
14-S-PT - 06
Fujita Corporation
Vietnam
Project
Phuc Son II PJ
Project No.
Manager
of Implementation Unit
Aoki Masashi
Seto Yohei
Drawing
Vu Dinh Phien
Note
【 OR CONSTRUCTION】
Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale
Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title
Số hiệu
Drawing No
14-S-PT - 06A