CHANGE ORDER REQUEST LIST

PJ code Project Made by Vu Dinh Phien


Phuc Son Technology Phase 2
12/20/2022 Date 2-Mar-2023
Title︓ FACTORY - POST TENSIONED SLAB

From 3 FCV

Change Order
Item No. Description Requested by Date
1 S 01 COR 1 "Change due to architectural requirement" By architectural department 2-Mar-2023

Note Check Check


Super Viser (FCV) Site

date date

QF-設セ-設計07(2017.04.01)
Check
Design manager
Cover sheet for revised drawings No. S 01

PJ code Project Made by Vu Dinh Phien


Phuc Son Technology Phase 2
12/20/2022 Date 2-Mar-2023
Title︓

From 3 FCV Reason of Change order


Change due to architechtural requirment

Change Order
Item No. Description Reference drawing Original
(Before the change)
1 Change due to architechtural requirment 14-S-PT-03_R1 14-S-PT-03_R0
14-S-PT-03A_R1
14-S-PT-04_R1 14-S-PT-04_R0
14-S-PT-04A_R1
14-S-PT-05_R1 14-S-PT-05_R0
14-S-PT-05A_R1
14-S-PT-06_R1 14-S-PT-06_R0
14-S-PT-06A_R1 14-S-PT-06A_R0

Note Check Check


Super Viser (FCV) Site

date date
Fujita Corporation
Vietnam

Project

Phuc Son II PJ
Project No.

Manager
of Implementation Unit

Aoki Masashi

Person in charge of design

Seto Yohei
Drawing

Vu Dinh Phien

Note

【 OR CONSTRUCTION】

Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale

Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title

Số hiệu
Drawing No

14-S-PT - 06
Fujita Corporation
Vietnam

Project

Phuc Son II PJ
Project No.

Manager
of Implementation Unit

Aoki Masashi

Person in charge of design

Seto Yohei
Drawing

Vu Dinh Phien

Note

【 OR CONSTRUCTION】

Giai đoạn
Design Step
Thiết kế bản vẽ thi công
Construction design
Tỉ lệ
Scale

Hoàn thành
Date 25/Aug/2022
Tên bản vẽ
Drawing Title

Số hiệu
Drawing No

14-S-PT - 06A

You might also like