Republic of Indonesia

Kujon’s Retail
Relocation

UNESCO’s Reactive Monitoring


Mission 2006 proposed retails and
parking areas to be relocated in order
to restore the function of Zone 2 to
a non-commercial Buffer Zone and
reduce the Building Coverage Ratio
(BCR) to 3.8%

BOROBUDUR
WORLD
HERITAGE
“Preserving the heritage,
promoting the future.”.
Existing Extended 45th session
Condition of the World Heritage Committee
Development Plan 2023
Borobudur: Temple Future
Conservation Developments
Following are the projects that have been completed:
Increase the Green Plot
Ratio by relocating retails Cultural Axis Development

CONCEPT
and parking areas

Visitor limit set to 1,200


people per day, an 85%
Founded in 1814, decrease from 2019
Restored in 1973,
UNESCO World Heritage since 1991, Online reservation to track

IMPLEMENTATION
protected and preserved Forever visitors in real time. Usage
of proper attire (Upanat
The awe-inspiring Borobudur Temple, a Sandals)
testament to artistic and architecttural
achievement of our past. Entrance Landmark
Policy

INITIAL DESIGN
Indonesia’s commitment to conserve the
Outstanding Universal Value (OUV) translated Harmonization
through five cabinets meetings between 2019-
2023. A team of various cross-disciplinary experts has
compiled a Heritage Impact Assessment (HIA)
which serves as the basis for the development

IMPLEMENTATION
This is to ensure the preservation of our shared
heritage for generation to come. of the Borobudur area.

Based on the study,


There are three main focus: the following are recommendations regarding future development:

No. Program Status Recommendation

1 Palbapang Gate Done


Temple Conservation
2 Kembang Limus Community Center Done
Borobudur’s Concourse

INITIAL DESIGN
3 Elo River Pedestrian Bridge Done

4 Bojong Village Roads Done

Policy Harmonization 5 Kali Progo Riverside Pedestrian Cancelled


Acceptable with
major mitigation

Couldn’t be
6 Kali Progo Pedestrian Cancelled
accepted

IMPLEMENTATION
Arrangement of Sendang Lanang -
7 Cancelled
Future Developments Sendang Wadon Wanurejo

8 Wanurejo Village Roads Done

9 Balaputradewa Street Pedestrian Done

10 Borobudur Concourse Done

Parking and Merchants Arrangements


Planning Acceptable with
11 (ZONE 2) TO ‘Borobudur Art Village’ -
Phase major mitigation
Kujon (ZONE 3)