AK 95 / AK 95 S HCEN12078 Rev.10.2005
Bloodleak
BPM
Conductivity Cell A
Conductivity Cell B
Conductivity C ell P
Degassing Pressure Transducer
Degassing pump
External pressure regulator
Feeding pump A
Feeding pump B
Flow restrictor
FM I/O board
Heater
Variable flow unit (or parts)
HPG Transducer
Internal pressure regulator
INPS
PD Transducer
pH cell
Relay board
SAGS
Suction pump
UF-cell B
Blood pump motor unit
Blood pump rotor
BM I/O board
Clamp unit complete
Heparin pump
Level detector (Air detector)
Operator's panel
Pressure Transducer (V & A)
Priming detector
Control CPU board
Protective CPU board
Control driver board
P r ot ect iv e driv e r board
Actions to be done
Calibrate External pressure regulator 1
Check BPM 1
Calibrate Priming detector 1 1 4
Calibrate Pressure transducer A 2A
Occlusion 1
Calibrate A/D conv. 3 3
Calibrate clock 4 1
Check fluid flow 2 2 6
Calibrate variable flow 1 5
Remarks:
A
Not necassary to calibrate if new spare part is installed (factory calibrated)
B
Important to follow the order of the calibrations/actions for machine performance
Replacements
10:3
Replacements
Change actions
Fch
Start the machine and let it perform a Function
Check.
Heat disinfection
Perform a heating according to the Operators
Manual.
AK 95 / AK 95 S HCEN12078 Rev.10.2005
FM Flow Diagram
Particle
Filter
Flow diagram
AK 95 S Dialyzer
Replacements