SG-5 Wellhead System
SG-5 Wellhead System
SG-5 SG-5XP
1-1
A value-conscious operator in today’s competitive market
appreciates the many advantages and the reliability of the
SG-5 subsea well system:
1-2
SG-5XP Subsea Wellhead System
The SG-5XP is a 4-casing hanger system. It has all the
standard SG-5 system features plus the added ability to
support the additional casing hanger and seal within the
high-pressure wellhead housing.
1-3
Section II
System Characteristics
SG-5/SG-5XP Subsea Wellhead System Components
Used a Typical Guideline Drilling Program
2-2
Temporary Guide Base Running Tool
47-1/8"
2-3
Retrievable Drilling Guide Structure
The ABB Vetco Gray retrievable drilling guide structure is ❖ ROV releasable guide posts on standard 6-ft. radius
a guide base fitted with a landing profile for, and run with, ❖ Guide post tops accept the remote guideline latch
the 30" wellhead housing. The guide structure provides
❖ 30" housing locks into center ring and gimbal
structural support for the 30" housing during cementing
assembly with snap ring
and is the primary guidance system for the BOP stack
during drilling. The guide structure has a diverless latch for ❖ Integral anti-rotation device
retrieval with the guide structure retrieving tool. A latch ❖ Guide structure parts are retrievable
ring, attached to four collet-type pin mechanisms, releases ❖ Retrieved from the wellhead assembly with the
from the 30" support plate which can be either a solid retrieving tool or by divers/ROV
gimbal, split gimbal, or a split flat plate. The collets secure
❖ Can be retrieved with corrosion cap in place
the 30" support plate and the guide structure together as
an assembly. When a temporary guide base is not used, ❖ Optional level indicator
the gimble can be replaced with the split plate. This plate ❖ Can be reworked
is secured to the base with chains and retrieved with the ❖ Weight: 9,340 lb.
base.
94-1/4"
131-3/4"
34-1/2"
2-4
Retrievable Drilling Guide Structure
2-5
Retrievable Drilling Guide Structure Retrieving Tool
❖ Can be reworked
❖ Weight: Approximately 4,000 lb.
❖ Top Connection: NC50 (4-1/2" I.F.) box
❖ Bottom Connection: NC50 (4-1/2" I.F.) pin
❖ Tension Capacity: 100,000 lb.
102-7/8"
39-3/4"
2-6
Remote Guideline Latch - GL4
Connects a guideline to a post top and provides diverless ❖ If a post top equipped with a remote guideline latch
release/establish ability. Using a remote release connector, suffers a parted guideline, the running tool is jetted
it can be run with guideline remote replacement tool or into position (after cutting parted line) and the latch
ROV. recovered without the use of divers.
❖ Can be reworked
❖ If a guideline parts, the guideline cutting tool shears ❖ Stack Up: 6" on post top
the parted line allowing the remote guide line latch to
❖ Weight: 197 lb.
be established on the post top
❖ Top Connection: Socket to suit guide wire size
❖ Automatically latches when mated to a remote guide
(3/4" to 1-1/4")
post
❖ Tension Capacity: 50,000 lb.
❖ Lowering a weight (go-devil) down the guideline
releases the latch
2-1/2"
21-1/4"
8-5/8"
2-7
30" Conductor Wellhead Housing
35-3/4"
❖ Internal profile accepts the ABB Vetco Gray high-
pressure wellhead housing 29-3/8"
❖ External profile accepts drilling/production guide base
❖ External slot prohibits rotation of guide base
❖ Cements ports allow exit of surface casing cement
returns
❖ Lower end has butt-weld prep for welding to
conductor housing extension
❖ Elevator shoulder
❖ Can be reworked
28"
❖ Weight: 1,989 lb.
❖ Bending Capacity: Limited by 30" casing
26-1/2"
2-8
30" Cam-Actuated Running Tool
3-1/2"
29-1/4"
2-9
18-3/4" High-Pressure Wellhead Housing
The 18-3/4" high-pressure wellhead housing lands in the ❖ Lower housing body has butt-weld for heavy-walled
30" conductor housing on the ocean floor, and suspends housing extension
the 20" casing string. The internal preparations accept up ❖ Housing extension equipped with Squnch Joint® or
to three casing hangers and packoff assemblies. The RL-4S connector for quick, easy makeup to the
housing has an external profile to receive the H-4® casing string
connector on the BOP stack.
❖ Locks into the 30" conductor housing
❖ Pre-loaded 18-3/4" to 30" connection
❖ Internal profile in upper housing body available
system available
for either cam-actuated or left-hand threaded
running tool ❖ Lower reaction ring reduces bending stresses in
20" casing by transferring bending loads to the
❖ Internal lockdown groove accepts a 10,000 psi
30" housing.
tubing hanger in the 7" casing hanger position.
❖ Can be reworked
❖ External profile mates with H-4 connector on
BOP stack ❖ Stack Up: 35-1/4" from top of 30" housing
❖ Stainless steel prep for H-4 wellhead connector ❖ Weight: 5,350 lb. without extension
VX ring gasket. ❖ Maximum Internal Working Pressure: 10,000 psi
❖ Incorporated secondary VT seal gasket preparation
27"
18-5/8"
35-1/4"
67-1/2"
20-7/8"
17-9/16"
2-10
18-3/4" High-Pressure Wellhead Housing Cam-Actuated Running Tool
Runs the 18-3/4" high-pressure wellhead housing and ❖ Removable plugs facilitate filling the casing string
20" casing. ❖ Check valve available to allow the casing bore to adjust
for ambient pressure changes
❖ Seals in high-pressure housing for cementing ❖ Can be reworked
operations
❖ Weight: 1,369 lb.
❖ Visual “Lock” and “Unlock” indication stamped
❖ Top Connection: 6-5/8" reg. box or 4-1/2" I.F. box
into stem
❖ Bottom Connection: 4-1/2" I.F. (NC 50) pin
❖ With left-hand rotation of stem, eight rams, with dual
45˚ profiles, engage internal wellhead profile ❖ Tension Capacity: Limited by drill pipe
60"
3"
18-11/16"
2-11
18-3/4" LHT High-Pressure Wellhead Housing Running Tool
Runs the 18-3/4" wellhead housing and 20" casing string. ❖ Can be reworked
❖ Weight: 1,350 lb.
❖ Blunt start, modified square thread for high strength and ❖ Top Connection: 4-1/2" I.F. (NC50) box
easy makeup (6-5/8" box up available)
❖ Removable plugs to facilitate filling the casing string ❖ Bottom Connection: 4-1/2" I.F. (NC 50) pin
❖ Check valve available to allow the casing bore to adjust ❖ Maximum Internal Working Pressure: 3,000 psi
for ambient pressure changes
❖ Tension Capacity: Limited by drill pipe
❖ Simple one-piece tool provides operational reliability
3"
5"
81-1/2"
22"
2-12
SG-5 13-3/8", 9-5/8", and 7" Casing Hangers
The ABB Vetco Gray SG-5 casing hanger assemblies ❖ Removable lock ring on casing hanger body provides
consist of a casing hanger body and lockdown ring. To optional lockdown
reduce trip time, the packoff assembly is run with the casing ❖ Internal left-hand running threads allow right-hand
hanger, set, and tested once cementing operations are release of the casing hanger running tool
completed. SG-5 casing hangers are available in a wide
❖ Accepts torque-actuated packoff
variety of casing thread sizes and threadforms.
❖ Flowby provision integral to casing hanger body
❖ Hanger assembly can be run separately, if desired
❖ Can be reworked
❖ Weight: 555 lb. 12-3/8"
❖ Bottom Connection: 13-3/8" customer specified
❖ Internal Working Pressure: 10,000 psi
❖ Flowby Area, landed: 13 sq. in.
18-1/2"
18-19/32"
2-13
18-3/4" x 9-5/8" Casing Hanger 18-3/4" x 7" Casing Hanger
Suspends the 9-5/8" (or 10-3/4") casing string and provides Suspends the 7" (or 7-5/8") casing string and provides
internal left-hand thread running profile and sealing area. internal left-hand thread running profile and sealing area.
8-13/16" 6-3/8"
19-1/8" 19-1/8"
18-19/32" 18-19/32"
2-14
SG-LTR Packoff Assembly
The annular seal is made up on an SG casing hanger and the ❖ Positive metal-to-metal seal backed up by
assembly is run in a single trip. After cementing, the packoff pre-energized elastomer seal
is energized and tested prior to retrieving the casing hanger ❖ W-shaped slotted metal insert enhances lower lip
running tool. retrievability up to 100,000 axial overpull
❖ Damage tolerant: successful testing to 15,000 psi
❖ Used for all casing hangers within a system, with scored housings and damaged seals
except for the 16" SG-5XP hanger
❖ Limited rework
❖ Integral flowby slots
❖ Weight: 186 lb.
❖ Maximum seal over extended periods, even in
❖ Maximum Working Pressure: 15,000 psi
high-pressure holes
❖ Low torque-set packoff actuation
16-13/32"
14-27/32"
18-19/32"
2-15
Universal Casing Hanger Running Tool
Runs all sizes of SG-5 casing hangers and casing strings, ❖ No shear pins or sliding sleeves to set or reset
13-3/8" and smaller, seals during cementing, sets packoff the packoff
and allows testing of the packoff assembly and BOP stack. ❖ Can be reworked
❖ Weight: 1,862 lb.
❖ Single trip to run, land, and cement the casing string,
❖ Top Connection: 4-1/2" I.F. (or 6-5/8" reg.
actuate and test the packoff
threads available)
❖ Centralizer sleeve helps position the casing hanger/
❖ Bottom Connection: 4-1/2" non-upset eight round
packoff assembly and running tool concentrically in the
box for subsea cement launching assembly
wellhead housing
❖ Maximum Load Rating: Limited by drill pipe
❖ Simple tool provides reliable operation and easy
maintenance
18-9/16"
3"
66-1/2"
2-16
Full Bore Casing Hanger Running Tools
The full bore casing hanger running tool uses a casing string ❖ Surface release plugs offer the possibility of using
instead of drill pipe, and can support heavier casing strings multiple stage cementing techniques
below the hanger because of higher axial load capacity. ❖ Full bore casing hanger running tool uses the
Provides full bore access between running string and casing same casing hanger and packoff assemblies as
string in the well. the universal casing hanger running tool
❖ Removable torque keys
❖ Can be reworked
18-3/4" x 13-3/8"
Full Bore Running Tool
18-9/16"
63-1/8"
12-3/8"
2-17
18-3/4" x 9-5/8" 18-3/4" x 7"
Full Bore Running Tool Full Bore Running Tool
Runs the 9-5/8" casing hanger/packoff assembly Runs the 7" casing hanger/packoff assembly and
and casing string, and provides through-bore access for casing and string, and provides through-bore access for
cement plugs. cement plugs.
18-9/16" 18-9/16"
56-11/16"
58-3/8"
8-13/16"
6-3/8"
2-18
Packoff Running and Retrieving Tool
67-3/8"
2-19
Plug-Type Test Tool
49-1/2"
3"
3"
2-20
Seat Protector and Wear Bushings
The 18-3/4" seat protector and wear bushings protect the hangers. Run with the seat protector and wear bushing
internal bore sealing surfaces of the wellhead and casing running and retrieving tool.. Can be reworked.
• Bore: 17-9/16" • Weight: 375 lb. • Bore: 12-3/8" • Weight: 1,460 lb.
18-5/8" 18-9/16"
47" 42-5/16"
17-9/16" 12-3/8"
• Bore: 8-13/16" • Weight: 449 lb. • Bore: 6-3/8" • Weight: 700 lb.
18-9/16" 18-9/16"
23-3/8" 26-1/2"
6-3/8"
8-13/16"
2-21
Seat Protector and Wear Bushing Running and Retrieving Tool
Runs and retrieves the subsea wellhead wear bushings, ❖ Weight: 915 lb.
seat protector, and corrosion cap. ❖ Top Connection: 4-1/2" (NC 50) API I.F. box
❖ Bottom Connection: 4-1/2" (NC 50) API I.F. pin
❖ Self-contained hydraulic tool
❖ Internal Working Pressure: 1,000 psi
❖ Collapsing lock ring and spring-loaded torque pins
❖ Tension Capacity: 80,000 lb. on torque pins
❖ Dart-actuated available where washing wear bushing
and wellhead is desired
18-9/16"
50 "
2-22
18-3/4" Wellhead Corrosion Cap
66"
32-1/2"
2-23
SG-5XP Subsea Wellhead System Components
The SG-5XP wellhead system has all the standard SG-5 adapter is attached to the bottom of the 13-3/8" casing
system features plus the added ability to support four casing hanger and the two are run together in a single trip.
hangers within the SG-5XP 18-3/4" high-pressure wellhead
housing. The system uses the 16" casing hanger, 16" SG ❖ Run, cement, and test the 16" hanger in a single trip
seal, 16" wear bushing, and a specifically-designed 13-3/8"
❖ Runs on standard SG-5 tools with the addition of the
casing hanger that transfers casing and test pressure loads
16" casing hanger running tool
directly into the high-pressure wellhead housing, instead of
the 16" casing hanger. If the 16" hanger is not used, an
4 0"
92-3/8"
80-7/8"
17-9/16"
2-24
18-3/4" x 16" SG-5XP Casing Hanger 16" Casing Hanger Running Tool
Suspends the 16" casing string and provides internal Runs the 16" SG-5XP hanger, cements, sets the 16" SG
left-hang thread running profile and sealing area. packoff, and pressure tests the assembly in one trip.
15-1/4" 18-9/16"
6-3/8"
21"
65-1/2"
18-19/32"
2-25
16" SG-5XP Full Bore Running Tool 16" SG-5XP Wear Bushing
Runs the 16" casing hanger/packoff assembly and casing Protects the internal bore sealing surfaces of the SG-5XP
string, with though bore access for cement plugs. wellhead housing and the 16" SG-5XP casing hanger.
15-1/4"
18-9/16"
67-1/8"
57-13/16"
18-19/32"
14-3/4"
2-26
13-3/8" SG-5XP Casing Hanger
25-3/4"
Unset
25"
Set
18-19/32"
2-27
SG-5XP Plug-Type Test Tool
18-9/16"
63-1/2"
3"
2-28
Section III
If the conductor pipe, conductor housing, and permanent 3. Install the running tool into the J-slots of the guide
guide base structure are jetted into place, it may not be base by left-hand rotation.
necessary to use a temporary guide base. 4. Install guidelines into the four pad eyes of the
1. Set the temporary guide on the spider beams. temporary guide base.
2. Fill the compartments with the appropriate 5. Run and land the temporary guide base on the
weight material. ocean floor.
3-1
Install the Retrievable Drilling Guide Structure and 30" Wellhead Housing
After the temporary guide base has been landed and the guidelines tensioned, the 36" hole is drilled to accommodate
the 30" conductor pipe. The 30" wellhead housing, conductor string, and retrievable drilling guide structure are run as
an assembled unit in either pre-drilled or jetting operations.
1. Assemble the guide structure if necessary and Where the bottom conditions permit, the 30" conductor
install the guide posts with the lock pins provided. can be jetted into place. The temporary guide base is not
2. Move the guide structure into the moon pool usually used and the 30 wellhead housing, 30" conductor,
area and install the guidelines. Make up and run retrievable guide structure, and guide lines are run in one
the conductor pipe through the guide structure. operation.
Running large O.D. conductor pipe is faster
when equipped with Squnch Joint or RapidLockTM
RL-4 connectors. 1. Attach the 30" wellhead housing to the last joint of
conductor pipe and make up the 30" cam-actuated
3. Attach the 30" wellhead housing joint to the last running tool. (Remove the bull plugs on the 30"
intermediate joint of conductor pipe and make up cam-actuated tool for jetting returns.)
the 30" cam-actuated running tool.
2. Land the 30" wellhead in the guide structure and
4. Land the 30" wellhead housing in the guide and remove the cam-actuated running tool.
remove the cam-actuated running tool.
3. A special jetting tool or bit is spaced out in the 30"
5. Run a drill pipe stringer into the conductor string conductor so that it is 6" outside to 12" inside the
and make up to the bottom of the running tool. bottom of the open-ended conductor. Make up the
6. Lower the running tool through the rotary and make last joint of the jetting string to the bottom of the
up into the conductor wellhead housing. cam-actuated running tool.
4. Lower the running tool through the rotary and make
7. Fill the conductor with seawater through the ports
up in the 30" wellhead housing.
on the running tool. (Replace the bull plugs prior to
lowering the housing to the ocean floor.) 5. Lower the 30" conductor to the mudline and begin
the jetting operation.
8. Run and land the entire assembly (retrievable
drilling guide structure, 30" wellhead housing, and 6. Continue jetting until the conductor reaches the
running tool) in the temporary guide base on the desired depth.
ocean floor.
9. Circulate the hole and cement the conductor
in place.
10. Release the running tool with right-hand rotation
and retrieve to the surface.
3-2
Running the retrievable drilling guide structure, 30" wellhead housing, and
30" conductor string into the temporary guide base and pre-drilled hole.
3-3
Jetting the 30" Conductor
3-4
Drill the 26" Hole with Marine Riser and Hydraulic Latch
After the 30" conductor is run, shallow formations or local 3. At the surface, install an ABB Vetco Gray KFDSTM
government regulations may require drilling the 26" hole diverter in the Marine Riser System to exhaust any
with returns to the drilling vessel. When these conditions flow encountered.
occur, an ABB Vetco Gray Marine Riser System and 4. Drill out and condition the 26" hole.
Hydraulic Latch are used.
5. When it has been determined there is no abnormal
1. Install the hydraulic latch and Flex Joint on the pressure in the well bore, retrieve the hydraulic
marine riser. latch to the surface.
2. Run, stab, and lock the hydraulic latch into the
30" wellhead housing on the ocean floor. (The latch
locks into the internal 30" cam-actuated running
tool profile.)
Hydraulic Latch
3-5
Install the High-Pressure Wellhead Housing
1. Install the running tool (cam-actuated or threaded) 5. Pick up approximately 30,000 lb. over the string
in the high-pressure wellhead housing. weight to verify that the high-pressure wellhead is
locked to the 30" wellhead housing.
2. Make up and run the 20" casing using RL-4S
casing connectors. 6. Circulate and cement the casing as required.
Returns are ported through the 30" wellhead
3. With the last joint of 20" casing in the rotary table, housing and guide structure.
make up the high-pressure wellhead housing
equipped with a 20" Squnch Joint® or RL-4S 7. Release the running tool from the high-pressure
casing connector. housing with right-hand rotation, and retrieve the
running tool to the surface.
4. Lower the assembly and land in the 30" wellhead
housing using the motion compensator.
3-6
Run the BOP Stack with the H-4® Wellhead Connector
The remotely-operated hydraulic H-4 wellhead connector After a successful BOP stack test, pull the test plug, re-run
connects the BOP stack to the high-pressure wellhead the seat protector in the wellhead housing using the seat
housing. protector/wear busing running and retrieving tool.
Pull the seat protector, if run in the wellhead, before testing
the BOP stack with the universal plug-type BOP test tool.
BOP stack, landed on the high-pressure wellhead housing, with plug-type test tool installed. 3-7
Prepare the Casing Hanger and Packoff for Installation
3-8
Run the Casing Hanger and Packoff
Step 1
Install the casing hanger tool in the hanger/packoff
assembly.
3-9
Step 2 Step 3
Rotate to the left, fully seating the tool in the hanger and the Run and land the hanger in the wellhead.
packoff is in running position.
3-10
Step 4 Step 5
Hanger and tool landed. Cement returns flowby. Hanger landed, packoff set and tested.
3-11
Run and Retrieve Seat Protector and Wear Bushings
1. Lower the running tool into the hole and stab into
the wear bushing.
2. Adjust the heave compensator to support the
running string weight less 2,000 lb.
3. Rotate the running string to the left to engage the
torque pins of the tool with the J-slots of the wear
bushing and release the wear bushing pins from
the packoff J-slots.
4. Retrieve the tool and wear bushing to the surface.
3-12
Retrieve and Reinstall a Packoff
Retrieve
Reinstall
3-13
Corrosion Cap
If a well proves to be of commercial significance, it can be A diver-assist corrosion cap can be run on a tugger line and
capped until the operator wishes to complete it. The ABB secures to the wellhead by manually installing three bolts.
Vetco Gray diverless corrosion cap temporarily protects
With either corrosion cap in place, a bio-degradable corrosion
suspended wells.
inhibitor can be pumped into the wellhead displacing
Run on the seat protector/wear bushing running and seawater and drilling fluid and providing a protective bath
retrieving tool, the corrosion cap simply stabs over the for the critical sealing areas of the wellhead.
wellhead, and automatically locks to the outer H-4 profile on
The retrievable drilling guide structure can be retrieved with
the wellhead housing.
the corrosion cap in place.
Retrievable drillling guide structure retrieved and corrosion cap installed on a suspended well.
3-14
Section IV
❖ O-ring on lower body assembly provides a seal ❖ Hydraulic cylinders have separate primary and
between the latch and the 30" wellhead housing. secondary hydraulic ports.
❖ Four hydraulic cylinders move the actuator sleeve ❖ Locking dogs encompass 356˚ contact resulting in
downward, radially forcing eight locking dogs out into uniform distribution of bending and tensile loads over
the 30" cam-actuated running tool profile. a large area of the wellhead.
❖ Available with either two- or four-arm guide frame ❖ Indicator rod for visual indication of cam ring position.
fitted with guide cones. ❖ Stainless steel-lined VX gasket ring groove assures
❖ Optional flange or mandrel top profile. a pressure-type seal.
❖ Available with clamp, studded, or flange top
connection, in a variety of sizes and pressure ratings.
4-1
30" Wellhead Housing Running 18-3/4" BOP Isolation Test Tool
and Drill-Ahead Tool
Tests the BOP stack while it is landed in the high-pressure
Used to run the 30" wellhead housing and drill pipe in wellhead housing. The tool lands on a wear bushing or
conditions where the conductor can be jetted in, the tool casing hanger and seals in the housing bore, isolating the
makes up to the internal cam profile of the 30" wellhead casing hanger packoff assemblies from test pressure.
housing.
The jetting string extends below the drill-ahead tool and
carries the 26" BHA. Once the conductor reaches total
depth, the stem of the tool is released by right-hand
rotation of the drill pipe. The body of the tool unlocks from
the stem and remains in place, centralizing the drill string.
The drill pipe continues downward and drilling for the 26"
hole can begin. Once the 26" hole reaches TD, the drill pipe
is picked up and the stem of the tool rises, retrieving the
body of the tool from the 30" wellhead housing to the
surface.
4-2
Utility Guide Frame
❖ Guides equipment between the drilling vessel and ❖ Side door center section available with spacers,
the temporary guide base or retrievable drilling guide accommodates both drill collars and drill pipe.
structure before the marine riser is installed.
4-3
Reinstallable Guide Base
Run and installed subsea on an existing wellhead for re- ❖ Hydraulic running tool latches the guide base to the
entry or guidance of production/completion equipment. external profile of the 30" wellhead housing.
❖ Guide Base retrievable ❖ Safety lock key on the running tool prevents the tool
stem from accidentally becoming unjayed during
❖ Posts retrievable
handling.
4-4
Emergency Equipment
The SG-5/5XP emergency sealing system consists of an emergency packoff, a 13-3/8" emergency seal assembly,
and a 9-5/8" emergency seal assembly.
Emergency Packoff
If the emergency packoff does not seal or cannot be run, then an emergency seal is used. Threads on the lower O.D.
profile engage the casing hanger and the elastomer seals seat between the seal assembly and casing hanger as well
as the I.D. of the wellhead housing. Run with the running and retrieving tool.
4-5
Section V
Tieback Systems
Tieback Systems
The SG-5/5XP wellhead system is easily adapted for use misalignment and lateral offset. The wellhead equipment
with a fixed platform or TLP tieback completion system. By used for tieback systems is standard, except for the last
using the SG-5/5XP 9-5/8" tieback hanger, the production casing hanger installed. This casing hanger contains an
strings can be tied back to the platform. The standard ABB internal profile for the SG seal preparation and special
Vetco Gray tieback system locks and seals the 20", tieback threads. The last casing string is threaded into the
13-3/8", and 9-5/8" casing strings into the SG-5/5XP casing hanger by the internal lockdown sub on the adapter,
wellhead system. The 9-5/8" production string has a full so the casing strings are not rotated. A modified wear
metal-to-metal seal. The initial tieback riser lands on the bushing on threaded insert protects the sealing and locking
SG-5/5XP wellhead, makes up without rotation while the areas.
funnel adapter of the tieback system accommodates angular
Surface Wellhead
20" Ti ebac k
13- 3/ 8" Ti ebac k
9-5/8" Tieback
Subsea Wellhead
5-1
20" Internal-lock Tieback Connector 20" External-lock Tieback Connector
5-2
13-3/8" Tieback Adapter 9-5/8" Tieback Torque Tool
5-3
9-5/8" Tieback Adapter with
Metal-to-Metal Seal 9-5/8" Tieback Casing Hanger
5-4
9-5/8" Tieback Wear Bushing
5-5