1-Botolan-Capas-Road-drainage-drawings-TR 3A, 3B & ER
1-Botolan-Capas-Road-drainage-drawings-TR 3A, 3B & ER
300
VARIES
Ø
61
0
500
Ø9
10
VARIES
500
NOTE:
2 TR 3B (6 - 910mm dia RCPC)
SPACING OF PIPES IS 1 32 ( I.D.)
- - SCALE: 1:30
GROUND LEVEL
var
EMBANKMENT
300
150
COMPACTED FILLING
150
1700
MATERIALS
300 2000 300
2600
2000
300 600
3 EXISTING ROAD (ER 7 - 2.0m x 2.0m RCBC) TR3A 20 0.86 1 0.610 0.23 3.8 1.08
- - SCALE: 1:75
TR3B 20 14.27 6 0.910 3.05 4.67 17.83