Анг - Айни Панчакент - Ресурсная Смета
Анг - Айни Панчакент - Ресурсная Смета
Анг - Айни Панчакент - Ресурсная Смета
(local estimates)
on Aini Panchakent
(name of work and costs, name of the object)
2. 01-06-01.055 Mobile compressors with internal combustion engine machine hour 50.692 9.25 98.59 911.58
pressure up to 686 kPa (7 atm) 5 m3/min
3. 04-03-04.045 Pneumatic jackhammers for operation from mobile machine hour 101.384 18.49 1.23 22.75
compressor stations
2 SSTS Q1 2023 Transportation of construction waste (asphalt concrete) tn 43.78 16.04 702.17
Table 14 from dismantling for 15 km
3 ESN46-33-2 Dismantling of monolithic concrete of the barrier fence 1 m3 15.60
foundation (OZP=1.15; EM=1.15 to consumption;
ZPM=1.15; TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 3.3) man-hour 11.0285 172.04 11.89 2,045.61
Machinist labor costs man-hour 3.266 50.95 12.93 658.78
1. 01-06-01.055 Mobile compressors with internal combustion engine machine hour 3.266 50.95 98.59 5,023.12
pressure up to 686 kPa (7 atm) 5 m3/min
2. 04-03-04.045 Pneumatic jackhammers for operation from mobile machine hour 6.532 101.90 1.23 125.34
compressor stations
4 SSTS Q1 2023 Transportation of construction waste (monolithic tn 37.44 16.04 600.54
Table 14 concrete of the barrier fence foundation) from
dismantling for 15 km
5 ESN1-13-28 Soil development with loading into dump trucks by 1000 m3 0.59
excavators with a bucket with a capacity of 0.65 (0.5-1)
m3, soil group: 4 (OZP=1.15; EM=1.15 to consumption;
ZPM=1.15; TZ=1.15; TZM=1.15)
Страница 1
1. 01-01-01.360 Medium motor graders 99 (135) kW (hp) machine hour 2.2195 1.86 147.2 273.13
3. 02-01-01.100 Road rollers self-propelled on pneumatic wheels 30 t machine hour 8.142 6.81 188.95 1,286.13
4. 02-01-02.330 Watering machines 6000 l machine hour 1.196 1.00 67.06 67.05
2. 01-01-01.360 Medium motor graders 99 (135) kW (hp) machine hour 2.645 0.82 147.2 121.01
4. 02-01-01.100 Road rollers self-propelled on pneumatic wheels 30 t machine hour 14.0415 4.36 188.95 824.60
5. 02-01-02.330 Watering machines 6000 l machine hour 1.196 0.37 67.06 24.93
2. 01-05-01.215 Truck-mounted cranes when working on other types of machine hour 33.2465 17.95 164.97 2,961.72
construction (except for main pipelines) 10 t
3. 01-06-02.005 Mobile welding units with a rated welding current of 250- machine hour 22.1835 11.98 13.68 163.87
400 A with a diesel engine
4. 02-01-02.020 Mobile bitumen boilers 400 l machine hour 1.8055 0.97 23.57 22.98
5. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 16.2035 8.75 59.06 516.77
Страница 2
1. 01-04-01.001 Deep vibrators machine hour 25.185 3.59 2.94 10.55
2. 01-05-01.040 Tower cranes, lifting capacity 8 t machine hour 20.6655 2.94 124.18 365.69
3. 01-05-01.215 Truck-mounted cranes, lifting capacity 10 t machine hour 1.7595 0.25 164.97 41.36
5. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 2.6105 0.37 59.06 21.97
6. 04-03-01.010 Electric chain saws machine hour 0.92 0.13 1.89 0.25
7. 1.10-10-5.25 Lime building quicklime lump, grade 1 T 0.026 0.00 1500 5.56
8.10-110-50-5.15 Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm m3 0.07 0.01 4100 40.90
wide, 40-75 mm thick grade III
9.10-110-50- Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm m3 0.86 0.12 4000 490.20
15.131 wide, 44 mm thick or more, grade III
10.10-240-10- Construction bolts with nuts and washers T 0.05 0.01 25000 178.12
10.55
11.1.10-240-25- Building nails T 0.043 0.01 11500 70.47
35.5
12. 1.10-280-20.70 Water m3 0.077 0.01 1.78 0.02
2. 03-04-01.035 Caterpillar tractors 79 (108) kW (hp) when working on machine hour 1.633 63.04 107.64 6,785.49
other types of construction
3. 03-05-01.100 Tipper trailed skis machine hour 1.633 63.04 7.06 445.05
3. 01-01-02.025 Trench excavators bucket chain 12 l when working on other machine hour 3.5535 6.54 88.04 575.64
types of construction
4. 02-01-01.175 Rollers semi-trailed on pneumatic wheels with a tractor 15t machine hour 4.485 8.25 155.86 1,286.22
Страница 3
23 ESN1-157-3 Soil compaction with trailed padfoot rollers 8 t per first 1000 m3 0.36
pass over one track at a layer thickness of 20 cm
(OZP=1.15; EM=1.15 to consumption; ZPM=1.15;
TZ=1.15; TZM=1.15)
Machinist labor costs man-hour 26.174 9.42 17.35 163.48
1. 01-01-01.110 Bulldozers 79 kW (108 hp) when working on other types of machine hour 22.2985 8.03 121.07 971.88
construction
2. 02-01-01.001 Trailed cam road rollers 8 t machine hour 7.751 2.79 3.59 10.02
3. 03-04-01.035 Caterpillar tractors 79 (108) kW (hp) when working on machine hour 3.8755 1.40 107.64 150.18
other types of construction
24 ESN1-157-6 For each subsequent pass, add one trace: to the norm 1- 1000 m3 0.36
157-3 (PZ=5 (OZP=5; EM=5 to the flow; ZPM=5; MAT=5
to the expense; TZ=5; TZM=5); OZP=1.15; EM=1.15 to
the flow. ; ZPM=1.15; TZ=1.15; TZM=1.15)
2. 03-04-01.035 Caterpillar tractors 79 (108) kW (hp) when working on machine hour 3.8525 1.39 107.64 149.29
other types of construction
25 ESN1-161-1 Irrigation of compacted soil of embankments with water 1000 m3 0.36
(OZP=1.15; EM=1.15 to consumption; ZPM=1.15;
TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 1) man-hour 15.9965 5.76 9.66 55.63
Machinist labor costs man-hour 15.9965 5.76 17.35 99.91
1. 02-01-02.330 Watering machines 6000 l machine hour 15.9965 5.76 67.06 386.18
3. 02-01-01.100 Road rollers self-propelled on pneumatic wheels 30 t machine hour 8.142 8.79 188.95 1,661.51
4. 02-01-02.330 Watering machines 6000 l machine hour 1.196 1.29 67.06 86.62
Страница 4
LOCAL RESOURCE ESTIMATE CALCULATION
(local estimates)
on Aini Panchakent
(name of work and costs, name of the object)
2. 01-06-01.055 Mobile compressors with internal combustion engine machine hour 50.692 1,540.83 98.59 151,910.83
pressure up to 686 kPa (7 atm) 5 m3/min
3. 04-03-04.045 Pneumatic jackhammers for operation from mobile machine hour 101.384 3,081.67 1.23 3,790.45
compressor stations
2 SSTS Q1 2023 Transportation of construction waste (asphalt concrete) tn 7,295.04 16.04 117,012.44
Table 14 from dismantling for 15 km 240
3 ESN46-33-2 Dismantling of monolithic concrete of the barrier fence 1 m3 387.00 -
foundation (OZP=1.15; EM=1.15 to consumption;
ZPM=1.15; TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 3.3) man-hour 11.0285 4,268.03 11.89 50,746.87
Machinist labor costs man-hour 3.266 1,263.94 12.93 16,342.77
1. 01-06-01.055 Mobile compressors with internal combustion engine machine hour 3.266 1,263.94 98.59 124,612.04
pressure up to 686 kPa (7 atm) 5 m3/min
2. 04-03-04.045 Pneumatic jackhammers for operation from mobile machine hour 6.532 2,527.88 1.23 3,109.30
compressor stations
4 SSTS Q1 2023 Transportation of construction waste (monolithic tn 928.80 16.04 14,897.95
Table 14 concrete of the barrier fence foundation) from
dismantling for 15 km 2.4
5 ESN1-13-27 Soil development with loading into dump trucks by 1000 m3 of 2.17 -
excavators with a bucket with a capacity of 0.65 (0.5-1) soil
m3, soil group: 3 (OZP=1.15; EM=1.15 to consumption;
ZPM=1.15; TZ=1.15; TZM=1.15)
8 ESN1-13-28 Soil development with loading into dump trucks by 1000 m3 1.05 -
excavators with a bucket with a capacity of 0.65 (0.5-1)
m3, soil group: 4 (OZP=1.15; EM=1.15 to consumption;
ZPM=1.15; TZ=1.15; TZM=1.15)
Страница 5
1. 01-01-01.110 Bulldozers 79 kW (108 hp) when working on other types of machine hour 11.707 12.33 121.07 1,492.49
construction
2. 01-01-02.185 Crawler-mounted excavators of foreign production such as machine hour 37.743 39.74 180.46 7,172.09
"ATLAS", "VOLVO", "KOMATSU", "HITACHI",
"LIEBHER" with a bucket capacity of 0.65 m3
3. 03-04-01.035 Caterpillar tractors 79 (108) kW (hp) when working on machine hour 3.8755 4.08 107.64 439.27
other types of construction
eleven ESN1-157-6 For each subsequent pass, add one trace: to the norm 1- 1000 m3 1.05 -
157-3 (PZ=5 (OZP=5; EM=5 to the flow; ZPM=5; MAT=5
to the expense; TZ=5; TZM=5); OZP=1.15; EM=1.15 to
the flow. ; ZPM=1.15; TZ=1.15; TZM=1.15)
2. 03-04-01.035 Caterpillar tractors 79 (108) kW (hp) when working on machine hour 3.8525 4.06 107.64 436.66
other types of construction
12 ESN1-161-1 Irrigation of compacted soil of embankments with water 1000 m3 1.05 -
(OZP=1.15; EM=1.15 to consumption; ZPM=1.15;
TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 1) man-hour 15.9965 16.84 9.66 162.72
Machinist labor costs man-hour 15.9965 16.84 17.35 292.25
1. 02-01-02.330 Watering machines 6000 l machine hour 15.9965 16.84 67.06 1,129.58
Labor costs of workers (cf. 1.8) man-hour 141.404 496.33 10.31 5,117.14
Machinist labor costs man-hour 4.853 17.03 17.35 295.54
1. 01-01-01.110 Bulldozers 79 kW (108 hp) when working on other types of machine hour 0.7245 2.54 121.07 307.88
construction
2. 01-01-01.360 Medium Motor Graders 99 kW (135 HP) machine hour 1.2765 4.48 147.2 659.53
3. 01-01-02.145 Single-bucket diesel excavators on caterpillar tracks 0.65 machine hour 2.852 10.01 129.64 1,297.76
m3 when working on other types of construction
14 ESN8-2-3 Gravel-sand preparation (OZP=1.15; EM=1.15 to 1 m3 77.00 -
consumption; ZPM=1.15; TZ=1.15; TZM=1.15)
Labor costs of workers (cp 2.5) man-hour 2.875 221.38 10.97 2,428.48
Machinist labor costs man-hour 0.621 47.82 17.35 829.62
1. 01-05-05.070 Single-bucket loader, universal, frontal pneumatic wheel 3t machine hour 0.092 7.08 227.9 1,614.44
2. 01-06-01.050 Mobile compressors with internal combustion engine machine hour 0.529 40.73 90.87 3,701.41
pressure up to 686 kPa (7 atm) 2.2 m3/min
3. 04-03-04.070 Pneumatic rammers machine hour 1.058 81.47 1.51 123.01
2. 01-05-01.040 Tower cranes, lifting capacity 8 t machine hour 21.62 48.86 124.18 6,067.58
Страница 6
3. 01-05-01.215 Truck-mounted cranes, lifting capacity 10 t machine hour 1.7595 3.98 164.97 656.00
5. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 2.6105 5.90 59.06 348.44
6. 04-03-01.010 Electric chain saws machine hour 0.92 2.08 1.89 3.93
7.1.10-110-50-5.15 Softwood lumber. Edged bars 4-6.5 m long, 75-150 mm m3 0.07 0.16 4100 648.62
wide, 40-75 mm thick grade III
8.1.10-110-50- Softwood lumber. Edged boards 4-6.5 m long, 75-150 mm m3 0.86 1.94 4000 7,774.40
15.131 wide, 44 mm thick or more, grade III
9. 1.10-240-10- Construction bolts with nuts and washers T 0.05 0.11 25000 2,825.00
10.55
10.10-240-25-35.5 Building nails T 0.043 0.10 11500 1,117.57
2. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 0.23 2.56 59.06 151.40
Labor costs of workers (cf. 2.3) man-hour 18.078 134.55 10.76 1,447.71
Machinist labor costs man-hour 17.0315 126.76 17.35 2,199.23
1. 01-01-01.360 Medium motor graders 99 (135) kW (hp) machine hour 2.2195 16.52 147.2 2,431.54
3. 02-01-01.100 Road rollers self-propelled on pneumatic wheels 30 t machine hour 8.142 60.60 188.95 11,449.77
4. 02-01-02.330 Watering machines 6000 l machine hour 1.196 8.90 67.06 596.92
2. 01-01-01.360 Medium motor graders 99 (135) kW (hp) machine hour 2.645 15.75 147.2 2,318.15
4. 02-01-01.100 Road rollers self-propelled on pneumatic wheels 30 t machine hour 14.0415 83.60 188.95 15,796.80
5. 02-01-02.330 Watering machines 6000 l machine hour 1.196 7.12 67.06 477.53
Страница 7
6.1.10-280-20.70 Water m3 7 41.68 1.78 74.19
H, W 7.4.1-5-20.5 rubble m3 126 750.20 44.1 33,084.00
2. 02-01-01.055 Rollers road self-propelled smooth 13 t machine hour 13.2365 27.89 88.81 2,476.85
3. 02-01-02.060 Manual asphalt distributors machine hour 1.61 3.39 10.65 36.13
5. 02-01-02.330 Watering machines 6000 l machine hour 0.4485 0.94 67.06 63.37
6. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 0.0115 0.02 59.06 1.43
8.1.10-260-500- Forgings from square billets weighing 1.8 kg T 0.0062 0.01 11750 153.49
5.10
W 9. 7.18.10 Coarse-grained asphalt concrete mix T 92.5 194.90 862.5 168,099.09
25 ESN27-67-6 When changing the thickness of the coating by 0.5 cm, 1000 m2 2.11 -
add or exclude: to the norm 27-66-6 (PZ=6 (OZP=6;
EM=6 to flow.; ZPM=6; MAT=6 to flow.; TZ=6; TZM=6);
OZP=1.15; EM=1.15 to flow. ; ZPM=1.15; TZ=1.15;
TZM=1.15)
2. 02-01-01.050 Rollers road self-propelled smooth 8 t machine hour 4.554 9.60 51.16 490.89
3. 02-01-01.055 Rollers road self-propelled smooth 13 t machine hour 13.2365 27.89 88.81 2,476.85
4. 02-01-02.060 Manual asphalt distributors machine hour 1.61 3.39 10.65 36.13
6. 02-01-02.330 Watering machines 6000 l machine hour 0.4485 0.94 67.06 63.37
Страница 8
7. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 0.046 0.10 59.06 5.72
3. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 2.3115 0.14 59.06 8.19
7. 1.10-240-10- Hexagon head bolts with a thread diameter of 10 mm T 0.048 0.00 25000 72.00
15.15
8.7.7.5 Shields metal PC. 100 6.00 364 2,184.00
D 9. TSC-7.7-20.10 Metal racks from pipes D-70mm L=4m, L=4.0m m 400 24.00 101.32 2,431.68
31 ESN6-1-2 The device of a monolithic foundation for B15 racks 100 m3 0.01 -
(OZP=1.15; EM=1.15 to consumption; ZPM=1.15;
TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 3) man-hour 615.825 3.55 11.46 40.65
Machinist labor costs man-hour 33.4075 0.19 17.35 3.34
1. 01-04-01.001 Deep vibrators machine hour 30.245 0.17 2.94 0.51
2. 01-05-01.040 Tower cranes, lifting capacity 8 t machine hour 32.0275 0.18 124.18 22.91
3. 1.10-10-5.25 Lime building quicklime lump, grade 1 T 0.027 0.00 1500 0.23
4. 1.10-110-50- Softwood lumber. Edged boards m3 0.68 0.00 4000 15.67
15.131
5.1.10-240-25-35.5 Building nails T 0.0238 0.00 11500 1.58
6.1.10-260-200.10 Hot-rolled wire rod in coils with a diameter of 6.3-6.5 mm T 0.0375 0.00 10200 2.20
Labor costs of workers (cf. 3.3) man-hour 6.9575 5.64 11.89 67.01
Machinist labor costs man-hour 4.4965 3.64 11.26 41.01
1. 02-01-02.330 Watering machines 6000 l machine hour 0.0805 0.07 69.52 4.53
2. 02-01-02.465 Road marking machine "Hofman" machine hour 2.208 1.79 71.93 128.65
3. 03-01-02.001 Cars onboard with a carrying capacity of up to 5 tons machine hour 2.208 1.79 63.93 114.34
Страница 9
6.7.8-50.10 thermoplastic kg 1125 911.25 42 38,272.50
7.7.25-70.15 Reflective glass microballoons for road markings kg 33.75 27.34 42 1,148.18
33 ESN27-141-2 Thermoplastic preparation (OZP=1.15; EM=1.15 to 1t 0.91 -
consumption; ZPM=1.15; TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 5) man-hour 4.6 4.19 14.89 62.42
Machinist labor costs man-hour 4.6 4.19 11.26 47.20
1. 02-01-02.465 Road marking machine "Hofman" machine hour 4.6 4.19 71.93 301.51
Страница 10
LOCAL RESOURCE ESTIMATE CALCULATIO
(local estimates)
on Aini Panchakent
(name of work and costs, name of the object)
1 2 3 4
1 ESN6-24-2 Parapedic fencing made of monolithic rubble concrete 100 m3
(OZP=1.15; EM=1.15 to consumption; ZPM=1.15;
TZ=1.15; TZM=1.15)
Labor costs of workers (cf. 3.2) man-hour
Machinist labor costs man-hour
1. 01-04-01.001 Deep vibrators machine hour
Contingency 5%
TOTAL according to the estimate
per unit of
per unit Total general
measure
5 6 7 8
0.01
0.968 73 70.664
1128.7509311
65.6565
5.947
31.265
4.069
1235.6884311
17.2996380354
100 300
1352.98806914
68.79 17.1975
1370.18556914
68.5092784568
1438.69484759