KALYANI BUILDCON PVT LTD

UTILITY CIVIL PLAN OF OUR SCOPE


SL NO. STRUCTURE ID 01-Sep 02-Sep 03-Sep 04-Sep 05-Sep 06-Sep 07-Sep 08-Sep 09-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 15-Sep 16-Sep 17-Sep 18-Sep 19-Sep 20-Sep 21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep REMARKS

UTILTY
TW-23-24
1 EXCAVATION
2 PCC
3 Pile Chipping
4 Raft

5 PD7 Column (4 nos) Reinforcement Shuttering 17.2

TW-02
1 EXCAVATION
2 PCC
3 Pile Chipping
Pile Chipping
4 Raft Reinforcement Shuttering 202.3
5 PD7 Column (4 nos) Reinforcement Shuttering 16.2
TW-01
1 EXCAVATION Excavation
2 PCC PCC
3 Pile Chipping Pile Chipping
4 Raft Reinforcement Shuttering 131.2
5 PD6 Column (4 nos) Reinforcement Shuttering 14.47
TW-20
1 EXCAVATION Excavation
2 PCC PCC

3 Pile Chipping
Pile Chipping
4 Raft Reinforcement Shuttering
61.43

5 PD3 Column (4 nos) Reinforcement Shuttering


8.23

CAS-03
F-1 (2 nos)
1 EXCAVATION Excavation
2 PCC PCC
3 Raft Reinforcement Shuttering 40
4 C1 Column (2 nos) Reinforcement Shuttering 5.324
F-1 (2 nos)
1 EXCAVATION Excavation
2 PCC PCC
3 Raft Reinforcement Shuttering 40
4 C1 Column (2 nos) Reinforcement Shuttering 5.324
F-1 (2 nos)
1 EXCAVATION Excavation
2 PCC PCC
3 Raft Reinforcement Shuttering 40
4 C1 Column (2 nos) Reinforcement Shuttering 5.324
F-1 (2 nos)
1 EXCAVATION Excavation
2 PCC PCC
3 Raft Reinforcement Shuttering 40
4 C1 Column (2 nos) Reinforcement Shuttering 5.3235
F-2 (2 nos)
1 EXCAVATION Excavation
2 PCC PCC
3 Raft Reinforcement Shuttering 52.00
4 C1 Column (2 nos) Reinforcement Shuttering 5.3235
5 C2 Column (2 nos) Reinforcement Shuttering 1.4625
C-33 TO C-40
C-34 (CF-1)
1
Concrete Chipping Concrete chipping
2 Debris removal Debris removal
3 EXCAVATION Excavation
4 PCC PCC
Reinforcem
5 Raft ent
Shuttering
3.51
P2 Column (2 nos) & Tie
6 Reinforcement Shuttering
Beam 1.465
C-35 (CF-2)
1 Concrete Chipping Concrete chipping
2 Debris removal Debris removal
3 EXCAVATION Excavation
4 PCC PCC
5 Raft Reinforcement Shuttering 14.469
P3 Column (2 nos) & Tie
6 Reinforcement Shuttering
Beam 2.305
C-38 (CF-3)
1 Concrete Chipping Concrete chipping
2 Debris removal Debris removal
3 EXCAVATION Excavation
4 PCC PCC
5 Raft Reinforcement Shuttering 19.2375
P4 Column (2 nos) & Tie
6 Reinforcement Shuttering
Beam 2.29
C-39 (CF-4)
1 Concrete Chipping Concrete chipping
2 Debris removal Debris removal
3 EXCAVATION Excavation
4 PCC PCC
5 Raft Reinforcement Shuttering 7.488
P4 Column (2 nos) & Tie
6 Reinforcement Shuttering
Beam 2.29
C-37 (RF-1)
1 Concrete Chipping Concrete chipping
2 Debris removal Debris removal
3 EXCAVATION Excavation
4 PCC PCC
5 Raft Reinforcement Shuttering
23.241

Page 1 of 2
SL NO. STRUCTURE ID 01-Sep 02-Sep 03-Sep 04-Sep 05-Sep 06-Sep 07-Sep 08-Sep 09-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 15-Sep 16-Sep 17-Sep 18-Sep 19-Sep 20-Sep 21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep REMARKS
P6 & P6a Column (2 nos) Reinforceme
6 Shuttering
& Tie Beam nt 8.488
C-36 (RF-2)
1 Concrete Chipping Concrete chipping
2 Debris removal Debris removal
3 EXCAVATION Excavation
4 PCC PCC
5 Raft Reinforcement Shuttering 14.535
P6 & P6a Column (2 nos)
6 Reinforcement Shuttering
& Tie Beam 8.488

TOTAL QTY 798.917 0.000 0.000 0.000 0.000 0.000 0.000 17.200 0.000 202.300 0.000 131.200 61.430 16.200 0.000 3.510 14.470 54.469 9.695 64.561 42.305 12.812 47.614 23.241 7.614 14.535 60.488 0.000 13.812 1.463 0.000