A A
GEOTEXTILE FABRIC AT
CULVERT CONNECTION
600mm WIDE

U-DB10@120
1125

L1-DB10@120

850
V2-DB10@120
SCRABBLE LINE L1-DB10@120
BOX CULVERT V1-DB10@200

1975
V1-DB10@200

1700
2175
PROVIDE BY
OWNER
SCRABBLE LINE
2825

SCRABBLE LINE
B B

850
850

H2-DB10@120
H0-DB10@120
H0-DB10@120
LEAN CONCRETE 15MPa.
200

200
V0-DB10@200

50
H0-DB10@120
650

50
INSTALL 300mm CEMENT STABILITY
H0-DB10@120 H2-DB10@120 BY MINE DEVELOPMENT
200 5995 200
V0-DB10@200 LEAN CONCRETE 15MPa.
FOR WINGWALLS 50 6395 50
50

50 200 2950
C 3150 50
C

SECTION C
SCALE 1:50 PKM-27-01-122-040
SECTION A
CONCRETE NOTES
SCALE 1:50 PKM-27-01-122-040
1. CONCRETE MATERIALS & CONSTRUCTION ACCORDANCE TO
PROJECT SPECIFICATIONS 1575-ES-003 FOR CONCRETE
CONSTRUCTION WORKS AND 1575-ES-012 FOR
GEOTEXTILE FABRIC AT
CULVERT CONNECTION
600mm WIDE 2. FOR CONCRETE SETOUT KEY PLAN
REFER TO DRG. NO. 1575-00-C-100.
D 3. ALL CONCRETE GRADE N25 - EXCEPT BLINDING CONCRETE D
WHICH SHALL BE 15 MPA & ALL REINFORCEMENT Fy = 500 E -

U-DB10@120 H4-DB10@400 4. GRADE SLABS EVENLY BETWEEN LEVELS SHOWN.

1125
U-DB10@120
5. COVER TO REINFORCEMENT
50mm TOP COVER TO FABRIC IN SLABS U.N.O.
50mm TOP COVER ELSEWHERE

1975
V2-DB10@120 50mm FOR CONCRETE AGAINST FORMWORK U.N.O.

2175
75mm FOR CONCRETE CAST ON OR AGAINST GROUND U.N.O.
1125

V1-DB10@200 6. CONCRETE FINISH S. STEEL TROWEL ON SLABS

2825
V2-DB10@120 V2-DB10@120 EXCEPT B. BROOM FINISH ON STEPS AND AS INDICATED.

850
H2-DB10@120 7. DESIGN BEARING PRESSURE FOR FOOTINGS 150 KPa
1975
2175

V1-DB10@200 V1-DB10@200
8. DENOTES CONSTRUCTION JOINT (C.J.)
H5-DB10@400
E DETAIL 4 ON DRG. STD 1575-00-C-001 . E

200

200
9. SLAB ON GROUND SHALL BE POURED ON 0.2mm MOISTURE
SCRABBLE LINE L1-DB10@120
850

SCRABBLE LINE BARRIER MEMBRANE LAID ON A 50mm COMPACTED SAND BED.


H1-DB10@120 H2-DB10@120 L1-DB10@120 L1-DB10@120
650 H1-DB10@120 INSTALL 300mm CEMENT STABILITY 10. REFER TABLE FOR REINFORCEMENT LAPS :
H0-DB10@120 H2-DB10@120 BY MINE DEVELOPMENT REINFORCEMENT LAP LENGTH ( MIN. )
200

FABRIC 225
LEAN CONCRETE 15MPa. V0-DB10 LEAN CONCRETE 15MPa. DB10 500
FOR WINGWALLS DB12 500
50

H1-DB10@120 H2-DB10@120
50

DB16 650
200 2950
11. REFER TO DRG. No. STD-E-002 FOR EARTHING DETAILS.
200 3970 200
50 3150 50 12. CURING SHALL BE STRICTLY IN ACCORDANCE WITH RELEVANT
50 4370 50 CLAUSES OF THE TECHNICAL SPECS. IN FORM CURING OF
RETAINING WALLS, BUND WALLS AND SLABS SHALL BE A
F MINIMUM OF THREE DAYS. F
SECTION B 13. PROPPING FOR SUSPENDED SLAB FORMWORK MAY ONLY BE
SECTION D
SCALE 1:50 PKM-27-01-122-040 REMOVED AFTER CONCRETE HAS ACHIEVED 20 MPa CONCRETE
SCALE 1:50 PKM-27-01-122-040
14. WELDING OF REINFORCING BARS SHALL NOT BE PERMITTED.

SCALE
DES.CHKD MV CLIENT SCALE 1:50 SIZE
DES. APPR AP PHU BIA MINING Ltd
ALL DIMENSIONS IN MILLIMETERS A3
PM. APPR PP
G G
REV 0
OPS-APPR TITLE PHU KHAM COPPER GOLD PROJECT
MINING-APPR
PHU BIA MINING BAN NAM NGONE BYPASS CULVERT CROSSING
No

- - - - - - - - - - - - 0 RO 03.04.23 ISSUED FOR CONSTRUCTION RO PP DRAWING No


L I M I T E D
SECTION "A","B", "C" AND "D" PKM-27-01-122-039
287

No REF. DWG No. No REF. DWG No. DESIGN APPR No BY DATE REVISION DETAILS DESIGN APPR No BY DATE REVISION DETAILS DESIGN APPR MAINT-APPR - -

410 1 2 3 4 5 6 7 8 9 10

You might also like