Professional Documents
Culture Documents
How To Prepare Your Workplace For Installing EV Charging Stations
How To Prepare Your Workplace For Installing EV Charging Stations
Charging Stations
India is undergoing a significant shift towards electric vehicles (EVs). The government has set
an ambitious goal for 2030: 30% electric mobility for private cars, 70% for commercial vehicles,
and 80% for 2- and 3-wheelers. This aligns with ever-growing public interest in embracing
sustainable transportation to combat air pollution and address climate change.
As EV adoption continues to surge, the demand for ubiquitous charging infrastructure is rising
accordingly. Lack of home charging infrastructure forces many EV users to make time-
consuming visits to public charging stations, but this is not a practical option for people who
have long daily commutes. Workplace EV charging offers a much-needed solution: it not only
eliminates the hassle of searching for charging stations, but also spares EV users from long
wait times while their vehicles charge. Moreover, installing this infrastructure constitutes a
powerful workplace sustainability initiative; it enhances a business's reputation as an eco-
conscious employer, client, and vendor, thereby bolstering its overall appeal and positive
impact.
Your workplace charging station’s placement and setup are essential to its success. Before
installing an EV charging station, make sure you take these steps:
To ensure a smooth, safe, and correctly executed installation process, it's imperative to enlist
skilled electricians who are well-versed in current electrical codes and regulations and equipped
with the necessary tools. Faulty wiring could lead to fires, so always prioritize compliance with
CEA safety provisions as you plan, design, and set up your EV charging station.
Before installing workplace EV charging stations, assess which EV charger is best for your
needs. There are three different kinds of EV charging station, with different technical
specifications and capabilities, available in India:
Level 1
Technical specifications:
● Uses Type 1 and Bharat AC-001 connectors
● Plugs into standard wall outlets; no extra setup required
Compatibility:
● Compatible with most electric passenger vehicles
Charging time:
● 8 hours or more
Smart charging:
● Limited
Level 2
Technical specifications:
● Uses Type 1, Type 2, GB/T, and Bharat AC-001 connectors
● Requires installation by a qualified electrician
Charging time:
● 4-6 hours
Compatibility:
● Mainly for 4-wheelers; may not suit 2- or 3-wheelers
Smart charging:
● Available
Level 3
Technical specifications:
● Uses Type 2, CHAdeMO, CCS1, and CCS2 connectors
Charging time:
● 1-3 hours
Compatibility:
● Exclusively for 4-wheelers; not suitable for 2- or 3-wheelers
Smart charging:
● Available