TOTAL 2,222
INSPECTION REPORT
PARTS EMBEDDED IN CONCRETE
2/58
First Submission, Issued for Information
3/58
LILAMA10 JOINT STOCK COMPANNY
NAMPHAK HYDROPOWER PROJECT
Attachment:
D. Project Manager
4/58
5/58
CONTENTS
2. Inspection Material.
6/58
7/58
2. INSPECTION MATERIAL.
8/58
9/58
INSPECTION REQUEST
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-
102-HME-0001
2, NP-SD5-DWG-DED-NA-GS-
102-HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 05/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: Name:
Date: Date:
10/58
MATERIAL INSPECTION
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam provincDate:
Item: GS embedded parts No IR: NP-SD5-QC-MT-02- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-MT-02
Name: Name:
11/58
Date: Date:
12/58
Report No.: NP-SD5-QC-MT-04- 1
POSITIVE MATERIAL IDENTIFICATION REPORT
Date:
Document No: Form No: NP-SD5-QC-MT-04 Page: 1 of 1
Project : NAM PHAK HYDROPOWER PROJECT Code :
EPC Contractor :
Procedure No.:
SONG DA 5 JOINT STOCK COMPANY
Sub-Contractor: LILAMA10 JOINT STOCK COMPANNY Acceptance criteria:
Item : GS EMBEDDED Equipment Name :
Type : Serial .: Cal. Due Date
Elements Identification(%)
Specification Material
C Si Mn P S Cr Ni
Material name: Steel plate: T=12 0.17 0.34 1.39 0.23 0.06
Examination date:
PMI RESULTS
Part Elements Identification (%) Result
No Joint No. Size Remark
description C Si Mn P S Cr Ni (ACC/REJ)
Steel plate: 2000x1
1 2303324 0.196 0.324 1.31 0.0269 0.0056 0.0034 0.0048 ACC
T=12 2000
Name: Name:
Date: Date:
13/58
Report No: NP-SD5-QC-MT-03- 1
MECHANICAL PROPERTIES TESTING REPORT
Page
Document No: Form No: NP-SD5-QC-MT-03 Date
Part: Steel samples
Project: NAM PHAK HYDROPOWER PROJECT
Items: GS embedded parts
Consultant: ..................................................................................................................................................
Sub contractor: Lilama10 joint stock companny
Sample for experiment: ..............................................................................................................................
Date of test: .............................................
Place Laboratory:
Testing Equipment Label Serial No
Code/Procedure
Testing requirements Tensile testing to Mechanical properties
Result
Tensile test Bend test
Infomation Force at
of sample Yield Maximu Tensile Percentage Destructive Evaluation
Notation Yield Bend angle
strength m force strength elongation character
point
Sec-area
mm2 KN Mpa KN Mpa %
I. Material checking: ..............................................................
Remarks:
Steel samples have mechanical properties equivalent to grade ………….. as per ………..
Examined by/ Technicians (s) Qualification Signature Date tested
Name: Name:
Date: Date:
14/58
REPORT ON IMAGE OF TESTING MATERIALS BEFORE PUTTING THEM INTO FABRICATION
15/58
Pictures 1: Material sample cutting
16/58
3. INSPECTION BEFORE WELDING.
17/58
18/58
INSPECTION REQUEST
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-
102-HME-0001
2, NP-SD5-DWG-DED-NA-GS-
102-HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 17/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: Name:
Date: Date:
19/58
BEFORE WELDING INSPECTION REPORT
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date: 8/13/2023
Item: GS embedded parts No IR: NP-SD5-QC-WI-01- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-WI-01
Dimension check
Welding grooves Cleaning check
No Item Drawing No Page No follow the drawing Remarks
Acc Rej Acc Rej Acc Rej
Gate shaft stoplog gate- NP-SD5-DWG-DED-NA-GS-102-
1 585 Acc Acc Acc
Group 9 HME-0001
Gate shaft wheel gate- NP-SD5-DWG-DED-NA-GS-102-
2 593 Acc Acc Acc
Group 9 HME-0005
Intake trashracks - Group NP-SD5-DWG-DED-NA-PI-62-
3 448 Acc Acc Acc
11 HME-0001
Bottom outlet radial gate - NP-SD5-DWG-DED-NA-BO-51-
4 20 Acc Acc Acc Anchor10
Group 1 HME-0001
Intake stoplog gates -Group NP-SD5-DWG-DED-NA-PI-62-
5 576 Acc Acc Acc
9 HME-0004
TOTAL 2,222
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-
00-HME-0003 (Rev 00)
20/58
- Approval drawings: NP-SD5-MTL-GEN-G1B-GD-00-HME-0014, NP-SD5-MTL-GEN-G1B-GD-00-HME-0015, NP-SD5-MTL-GEN-G1B-GD-00-HME-
0016, NP-SD5-MTL-GEN-G1B-GD-00-HME-0017
To conclude or other comments
Name: Name:
Date: Date:
21/58
INSPECTION SHEET BEFORE WELDING
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province)
Item: GS embedded parts
Subcontractor: Lilama10 joint stock companny No IR: NP-SD5-QC-WI-01- 2
1.2 Circular steel: D16, L=270 NP-SD5-DWG-DED-NA-GS-102- D16 D16 200/70 D16 D16 200/70
HME-0001
2.2 Circular steel: D16, L=270 NP-SD5-DWG-DED-NA-GS-102- D16 D16 200/70 D16 D16 200/70
HME-0005
3.2 Circular steel: D16, L=270 NP-SD5-DWG-DED-NA-PI-62- D16 D16 200/70 D16 D16 200/70
HME-0001
22/58
Dimension check Dimension check
No Item Drawing No follow the drawing (mm) follow the drawing (mm) Remarks
T H L T H L
4.1 Steel plate: T=12 NP-SD5-DWG-DED-NA-BO-51- 12 100 100 12 100 100
HME-0001
4.2 Circular steel: D16, L=270 NP-SD5-DWG-DED-NA-BO-51- D16 D16 200/70 D16 D16 200/70
HME-0001
5.2 Circular steel: D16, L=270 NP-SD5-DWG-DED-NA-PI-62- D16 D16 200/70 D16 D16 200/70
HME-0004
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-
G1B-GD-00-HME-0003 (Rev 00)
Name: Name:
Date: Date:
23/58
PICTURES BEFORE WELDING INSPECTION
27/58
28/58
INSPECTION REQUEST
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-
102-HME-0001
2, NP-SD5-DWG-DED-NA-GS-
102-HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 21/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: Name:
Date: Date:
29/58
AFTER WELDING INSPECTION REPORT
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date:
Item: GS embedded parts No IR: NP-SD5-QC-WI-02- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-WI-02
TOTAL 2,222
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-
00-HME-0003 (Rev 00)
30/58
- Approval drawings: NP-SD5-MTL-GEN-G1B-GD-00-HME-0014, NP-SD5-MTL-GEN-G1B-GD-00-HME-0015, NP-SD5-MTL-GEN-G1B-GD-00-HME-
0016, NP-SD5-MTL-GEN-G1B-GD-00-HME-0017
Name: Name:
Date: Date:
31/58
INSPECTION SHEET AFTER WELDING
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province)
Item: GS embedded parts
Subcontractor: Lilama10 joint stock companny No IR: NP-SD5-QC-WI-02- 2
NP-SD5-DWG-DED-NA-GS-102-
Gate shaft stoplog gate- Group 9 212 212 ÷ 213 ±2
HME-0001
NP-SD5-DWG-DED-NA-GS-102-
Steel plate: T=12 212 212 ÷ 213 ±2
HME-0005
NP-SD5-DWG-DED-NA-PI-62-
Steel plate: T=12 212 212 ÷ 213 ±2
HME-0001
NP-SD5-DWG-DED-NA-BO-51-
Steel plate: T=12 212 212 ÷ 213 ±2
HME-0001
32/58
NP-SD5-DWG-DED-NA-PI-62-
Steel plate: T=12 212 212 ÷ 213 ±2
HME-0004
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-
0003 (Rev 00)
Name: Name:
Date: Date:
33/58
PICTURES AFTER WELDING INSPECTION
34/58
5. INSPECTION SHOP ASSEMBLY.
35/58
36/58
INSPECTION REQUEST
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-
102-HME-0001
2, NP-SD5-DWG-DED-NA-GS-
102-HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 25/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: Name:
Date: Date:
37/58
INSPECTION SHOP ASSEMBLY
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date: 8/25/2023
Item: GS embedded parts No IR: NP-SD5-QC-SA-01- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-SA-01
NP-SD5-DWG-DED-NA-PI-62-
3 Intake trashracks - Group 11 ACC
HME-0001
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-
G1B-GD-00-HME-0003 (Rev 00)
38/58
- Approval drawings: NP-SD5-MTL-GEN-G1B-GD-00-HME-0014, NP-SD5-MTL-GEN-G1B-GD-00-HME-0015, NP-SD5-MTL-GEN-G1B-GD-00-
HME-0016, NP-SD5-MTL-GEN-G1B-GD-00-HME-0017
Name: Name:
Date: Date:
39/58
DIAGRAM OF SHOP ASSEMBLY INPECTION REPORT
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date: 8/25/2023
Item: GS embedded parts No IR: NP-SD5-QC-SA-02- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-SA-02
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-
HME-0003 (Rev 00)
40/58
- Approval drawings: NP-SD5-MTL-GEN-G1B-GD-00-HME-0014, NP-SD5-MTL-GEN-G1B-GD-00-HME-0015, NP-SD5-MTL-GEN-G1B-GD-00-HME-
0016, NP-SD5-MTL-GEN-G1B-GD-00-HME-0017
Name: Name:
Date: Date:
41/58
6. INSPECTION SURFACE PREPARATION AND PAINT.
42/58
43/58
INSPECTION REQUEST
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-
102-HME-0001
2, NP-SD5-DWG-DED-NA-GS-
102-HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 26/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: Name:
Date: Date:
44/58
BLASTING AND PAINTING INSPECTION REPORT
CLIENT: NAMPHAK POWER JOB ITEM: HYDRO - MECHANICAL WORK
PROJECT: NAMPHAK HYDROELECTRONIC POWER No IR: NP-SD5-QC-PT-01- 1
EQUIPMENT: PARTS EMBEDDED IN CONCRETE Form No: NP-SD5-QC-PT-01
BLASTING PRIMER 1st coat 2nd coat 3rd coat SURFACE PREPARATION
DATE 8/26/2023 8/26/2023 METHOD SA 2.5
TIME 8:30:00 AM 10:45:00 AM STANDARD ISO 8501-1
WEATHER Sunny Sunny TYPE OF ABRASTIVE
TEMPERATURE (*Celcius) 32 ˚C 35 ˚C 35 ˚C PROFILE GRADE
RELATIVE HUMITIDY (%) 77% 80% 75%
STELL SUBSTRATE (*Celcius) 30 ˚C 30 ˚C
PAINT SYSTEMS
No of Spec DFT Average DFT
Type product Batch No Method of application Colour Remark
coat (microns) (microns)
1 HEMPADUR ZINC 15570 483040129 Airless spray 70
Name: Name:
Date: Date:
45/58
PICTURES AFTER WELDING INSPECTION
46/58
Pictures 1: Inspection kind of paint
47/58
Pictures 2: Cleaning
48/58
Pictures 3: Inspection DFT
.
.
.
49/58
Pictures 4: Inspection DFT
50/58
7. READY FOR DELIVERY.
51/58
52/58
INSPECTION REQUEST
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-
102-HME-0001
2, NP-SD5-DWG-DED-NA-GS-
102-HME-0005
Assembly yard for lilama 10, group 8 of
3, NP-SD5-DWG-DED-NA-PI-62-
Tan Thinh Ward, Hoa Binh City, Hoa Embeded 30/08/2023 8h00
HME-0001
Binh Province.
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: Name:
Date: Date:
53/58
READY FOR DELIVERY
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date:
Item: GS embedded parts No IR: NP-SD5-QC-RD-01- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-RD-01
Inspection shop
Drawing Inspection Welding Inspection Painting
No Item assembly Remarks
No Acc Rej Acc/Rej Acc/Rej Acc/Rej Acc/Rej
NP-SD5-DWG-DED-NA-GS-
1 Gate shaft stoplog gate- Group 9 Acc Acc Acc Acc Acc
102-HME-0001
NP-SD5-DWG-DED-NA-GS-
2 Gate shaft wheel gate- Group 9 Acc Acc Acc Acc Acc
102-HME-0005
NP-SD5-DWG-DED-NA-PI-62-
3 Intake trashracks - Group 11 Acc Acc Acc Acc Acc
HME-0001
Bottom outlet radial gate - Group NP-SD5-DWG-DED-NA-BO-
4 Acc Acc Acc Acc Acc
1 51-HME-0001
NP-SD5-DWG-DED-NA-PI-62-
5 Intake stoplog gates -Group 9 Acc Acc Acc Acc Acc
HME-0004
Method for inspection
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-
GD-00-HME-0003 (Rev 00)
- Approval drawings: NP-SD5-MTL-GEN-G1B-GD-00-HME-0014, NP-SD5-MTL-GEN-G1B-GD-00-HME-0015, NP-SD5-MTL-GEN-G1B-GD-00-
HME-0016, NP-SD5-MTL-GEN-G1B-GD-00-HME-0017
To conclude or other comments
THE SUBCONTRACTOR THE CONTRACTOR (SD5) THE OWNER’S ENGINEER THE OWNER
55/58
PICTURES INSPECTION PACKAGING AND TRANSPORT
56/58
Pictures 1: Packaging
57/58
Pictures 2: Transport to site
58/58